If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22257 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.83565,"lon":-79.997875,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Connoquenessing Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 151422 | |
Farm/Lease Name: MICHAEL UNIT 3HB | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.835650 | |
Longitude: -79.997875 |
Date | Event |
---|---|
2014-06-24 | New Permit Application |
2014-07-30 | Performed Spud Operation |
2014-12-06 | Drilling Completion |
2015-06-16 | Perforation |
2015-10-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-06-22 | 2015-07-23 | 5,454 | 9,819,390 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP Breaker | Sagar Enterprise | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00002965 | 28 |
Chlorine Dioxide | Baker Hughes | Biocide | Chlorine Dioxide | 10049-04-4 | 0.3 | 0.00211327 | 1697.14 | |
Slurry Gel, WGA-7 SLR | PolyFrac Plus | Gel | Guar Gum | 9000-30-0 | 45 | 0.000761213 | 718.841 | |
Clay | 14808-60-7 | 5 | 0.00008458 | 79.871 | ||||
Surfactant | 154518-36-2 | 5 | 0.00008458 | 79.871 | ||||
Petroleum Distillate | 64742-47-8 | 45 | 0.000761213 | 718.841 | ||||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Sodium Chloride | 7647-14-5 | 0 | 0.00000780 | 6.26 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00779523 | 6260.24 | ||||
Water | 7732-18-5 | 0 | 0.012992 | 10433.7 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0012992 | 1043.37 | ||||
Potassium Chloride | 7447-40-7 | 0 | 0.00001299 | 10.434 | ||||
2-propenoic, polymer with sodium phosphinate, sodium salt | 71050-62-9 | 0 | 0.00519682 | 4173.5 | ||||
TEA Breaker Activater | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.000373988 | 353.17 | |
Diethanolamine | 111-42-2 | 13 | 0.00006706 | 63.327 | ||||
Sand (Proppant) | Sargent/Momentive/Preffered | Proppant | Silica Substrate | 14808-60-7 | 100 | 12.219 | 11,538,800.0 | |
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02764 | 26101.4 | |
Other - (non-hazardous) | NA | 70 | 0.0644932 | 60903.3 | ||||
Hydrochloric Acid (7.5%) | PVS | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0685009 | 64687.9 | |
Water | 7732-18-5 | 92.5 | 0.844845 | 797818 | ||||
Water | Rex Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7729 | 81,942,800.0 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Ethoxylated alcohol | 68002-97-1 | 35 | 0.000140565 | 132.741 | |
Acetophenone | 98-86-2 | 1 | 0.00000402 | 3.793 | ||||
Methanol | 67-56-1 | 5 | 0.00002008 | 18.963 | ||||
Thiourea | 62-56-6 | 1 | 0.00000402 | 3.793 | ||||
Short Chained Glycol Ether | 112-34-5 | 60 | 0.000240969 | 227.556 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000402 | 3.793 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RE GAS DEV LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | RE GAS DEV LLC | 284,384.57 | 148 | 0.00 | 0 | 502.73 | 117 |
2016 | RE GAS DEV LLC | 655,201.96 | 362 | 0.00 | 0 | 876.77 | 362 |
2017 | RE GAS DEV LLC | 560,056.26 | 363 | 0.00 | 0 | 918.04 | 363 |
2018 | PENNENERGY RESOURCES LLC | 476,315.43 | 342 | 0.00 | 0 | 721.41 | 342 |
2019 | PENNENERGY RESOURCES LLC | 410,062.00 | 350 | 0.00 | 0 | 189.00 | 147 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RE GAS DEV LLC | Drill Cuttings | 927.55 Tons | LANDFILL | 100585 |
2015 | RE GAS DEV LLC | Produced Fluid | 325.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2015 | RE GAS DEV LLC | Produced Fluid | 1,046.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RE GAS DEV LLC | Produced Fluid | 3,342.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2015 | RE GAS DEV LLC | Fracturing Fluid Waste | 18.45 Tons | LANDFILL | CID # 28726 |
2015 | RE GAS DEV LLC | Produced Fluid | 1,069.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 355.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | RE GAS DEV LLC | Produced Fluid | 1,667.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RE GAS DEV LLC | Produced Fluid | 814.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2016 | RE GAS DEV LLC | Produced Fluid | 235.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | RE GAS DEV LLC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RE GAS DEV LLC | Produced Fluid | 408.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | RE GAS DEV LLC | Produced Fluid | 170.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2016 | RE GAS DEV LLC | Produced Fluid | 4,000.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2016 | RE GAS DEV LLC | Produced Fluid | 863.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | RE GAS DEV LLC | Produced Fluid | 202.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2017 | RE GAS DEV LLC | Produced Fluid | 732.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2017 | RE GAS DEV LLC | Produced Fluid | 917.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RE GAS DEV LLC | Synthetic Liner Materials | 5.50 Tons | LANDFILL | SWF 1025 |
2017 | RE GAS DEV LLC | Produced Fluid | 94.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RE GAS DEV LLC | Produced Fluid | 1,418.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2017 | RE GAS DEV LLC | Produced Fluid | 3,192.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | RE GAS DEV LLC | Produced Fluid | 2,175.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 2,356.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RE GAS DEV LLC | Produced Fluid | 441.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | RE GAS DEV LLC | Produced Fluid | 2,679.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,245.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 2,527.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,993.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2293942 | Primary Facility | 2014-08-07 | Routine/Partial Inspection | No Violations Noted | |
2297777 | Primary Facility | 2014-08-21 | Routine/Partial Inspection | No Violations Noted | |
2326795 | Primary Facility | 2014-12-04 | Drilling/Alteration | No Violations Noted | |
2335945 | Primary Facility | 2015-01-13 | Routine/Partial Inspection | No Violations Noted | |
2726987 | Primary Facility | 2018-05-07 | Routine/Partial Inspection | No Violations Noted | On 5/7/2018, WQS Brian MacQuarrie onsite to conduct routine inspection. Site sign posted at entrance. Access road maintained. Well pad fenced in. Gate opened. Lots of materials staged on well pad including packaged filter sock and HDPE pipe for well development pipeline. Well pad consists of five wells; 1H-019-22273, 3HB-019-22257, 5H-019-22258, 9HB-019-22260 and 11H-019-22261. Tank battery consists of six 400 bbl tanks within steel containment. |
For data sources see[8]