If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22333 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.913033,"lon":-79.748394,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Donegal Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151804 | |
Farm/Lease Name: ANGERT A UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.913033 | |
Longitude: -79.748394 |
Date | Event |
---|---|
2014-10-17 | New Permit Application |
2015-03-27 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-25 | 2015-10-15 | 6,006 | 11,595,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other Ingredients | C&J Well Services | Other Ingredients | Copolymer | Proprietary | 35 | 0.025521 | 0 |
Glycol Ethers | 111-46-6 | 40 | 0.000394 | 0 | ||||
Water | 7732-18-5 | 96 | 0.01626 | 0 | ||||
2,2-Dibromomalonamide | 73003-80-2 | 1 | 0.000214 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000473 | 0 | ||||
Water | 7732-18-5 | 32 | 0.006835 | 0 | ||||
Water | 7732-18-5 | 31 | 0.022605 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001458 | 0 | ||||
Surfactant Blend | Proprietary | 1 | 0.000729 | 0 | ||||
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.002188 | 0 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.000169 | 0 | ||||
Monobromo-3-nitrilopropionamide | 1113-55-9 | 1 | 0.000214 | 0 | ||||
Surfactant Blend | Proprietary | 3 | 0.002188 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.877577 | 0 | ||||
Proprietary | Proprietary | 0.02 | 0 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00001000 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00007300 | 0 | ||||
FR-16 | C&J Well Services | Friction Reducer | Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.032813 | 0 | |
Ethylene Glycol | 107-21-1 | 5 | 0.003646 | 0 | ||||
HCl Acid (0-7.5%), 22 Baume | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.071155 | 0 | |
AQUCAR DB 20 | C&J Well Services | Biocides | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 20 | 0.004272 | 0 | |
Polyethylene glycol | 25322-68-3 | 54.5 | 0.011641 | 0 | ||||
Sodium bromide | 7647-15-6 | 4 | 0.000854 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 3 | 0.000641 | 0 | ||||
Water | XTO Energy/ExxonMobil | Water | Water | 7732-18-5 | 100 | 88.7633 | 0 | |
HCl Acid (12.5-18.0%), 22 Baume | C&J Well Services | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.035165 | 0 | |
Hydrochloric Acid | 7647-01-0 | 18 | 0.007234 | 0 | ||||
Acid Inhibitor 2 (AI-2) | C&J Well Services | Acid Corrosion Inhibitors | Propargyl Alcohol | 107-19-7 | 20 | 0.000197 | 0 | |
Isopropyl Alcohol | 67-63-0 | 20 | 0.000197 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000148 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00009900 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 20 | 0.000197 | 0 | ||||
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.71225 | 0 | |
Aluminum Oxide | 1344-28-1 | 1.1 | 0.009637 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.006544 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.029865 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.006544 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.000876 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 0.875229 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.000876 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002715 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.002715 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.071989 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.53794 | 0 | ||||
SI-4 | C&J Well Services | Paraffin & Scale Additives | Bis(hexamethylene triaminepenta (methylenephosphonic acid)) |
Proprietary | 10 | 0.001694 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 541,471.00 | 309 | 0.00 | 0 | 1,884.78 | 262 |
2017 | XTO ENERGY INC | 793,725.00 | 365 | 0.00 | 0 | 544.08 | 365 |
2018 | XTO ENERGY INC | 560,612.12 | 335 | 30.01 | 30 | 290.60 | 297 |
2019 | XTO ENERGY INC | 475,382.43 | 357 | 0.00 | 0 | 325.52 | 357 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 1,111.18 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 0.26 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 13,565.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 846.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,129.30 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.26 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 9,522.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,717.10 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,449.08 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 2,159.13 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,383.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 11,450.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 202.93 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 6,985.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 2,339.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,846.15 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 618.19 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 516.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2356715 | Primary Facility | 2015-03-31 | Routine/Partial Inspection | No Violations Noted | |
2360294 | Primary Facility | 2015-04-09 | Drilling/Alteration | No Violations Noted | |
2374858 | Primary Facility | 2015-05-27 | Routine/Partial Inspection | No Violations Noted | |
2487137 | Primary Facility | 2016-05-20 | Routine/Partial Inspection | No Violations Noted | |
2492223 | Primary Facility | 2016-06-08 | Routine/Partial Inspection | No Violations Noted | |
2605765 | Primary Facility | 2017-06-20 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well drilled, completed, and in production. Production equipment on site. Gathering pipeline connected to well pad. Well site PCSM plan has been implemented and site has 100% vegetation. Well tag in place, and well head has been fenced. |
2837177 | Primary Facility | 2019-01-11 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site. PCSM BMPs in place, maintained, and functioning. Site stabilized with vegetation. |
For data sources see[8]