If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22356 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.943311,"lon":-79.714761,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Donegal Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152026 | |
Farm/Lease Name: MOURER A UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-11-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.943311 | |
Longitude: -79.714761 |
Date | Event |
---|---|
2014-11-19 | New Permit Application |
2015-05-07 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-11 | 2016-01-17 | 6,017 | 10,158,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | XTO Energy/ExxonMobil | Water | Water | 7732-18-5 | 100 | 89.0815 | 0 |
HC-15 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.007564 | 0 | |
HC-7.5 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.068876 | 0 | |
Other Ingredients | C&J Well Services | Other Ingredients | Water | 7732-18-5 | 31 | 0.019813 | 0 | |
2,2-Dibromomalonamide | 73003-80-2 | 1 | 0.000211 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.849472 | 0 | ||||
Surfactant Blend | Proprietary | 3 | 0.001917 | 0 | ||||
Water | 7732-18-5 | 96 | 0.017717 | 0 | ||||
Surfactant Blend | Proprietary | 1 | 0.000639 | 0 | ||||
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.001917 | 0 | ||||
Water | 7732-18-5 | 85 | 0.042861 | 0 | ||||
Monobromo-3-nitrilopropionamide | 1113-55-9 | 1 | 0.000211 | 0 | ||||
Water | 7732-18-5 | 32 | 0.006749 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00006400 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001278 | 0 | ||||
Copolymer | Proprietary | 35 | 0.02237 | 0 | ||||
CI-3 | C&J Well Services | Acid Corrosion Inhibitors | Nonyphenol (branched), ethoxylated | 127087-87-0 | 5 | 0.00006100 | 0 | |
Cinnamaldehyde | 104-55-2 | 15 | 0.000183 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00003100 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00003100 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00006100 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000183 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000244 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 2.5 | 0.00003100 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000488 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000183 | 0 | ||||
FR-16 | C&J Well Services | Friction Reducer | Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.028761 | 0 | |
Ethylene Glycol | 107-21-1 | 5 | 0.003196 | 0 | ||||
SI-6 | C&J Well Services | Paraffin & Scale Additives | Phosphonic Acid Salt | Proprietary | 6 | 0.001107 | 0 | |
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000369 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 0 | 0 | 0 | ||||
Methanol | 67-56-1 | 100 | 0.018455 | 0 | ||||
AQUCAR DB 20 | C&J Well Services | Biocides | Polyethylene glycol | 25322-68-3 | 54.5 | 0.011494 | 0 | |
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 20 | 0.004218 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 3 | 0.000633 | 0 | ||||
Sodium bromide | 7647-15-6 | 4 | 0.000844 | 0 | ||||
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Aluminum Oxide | 1344-28-1 | 1.1 | 0.011018 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 5.95282 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.002885 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001002 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.005959 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.031731 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001002 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.88171 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.005959 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.065547 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002885 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.00066 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 313,191.00 | 208 | 0.00 | 0 | 1,335.30 | 208 |
2017 | XTO ENERGY INC | 487,809.00 | 364 | 0.00 | 0 | 1,341.58 | 364 |
2018 | XTO ENERGY INC | 423,117.36 | 355 | 60.00 | 30 | 925.41 | 325 |
2019 | XTO ENERGY INC | 372,356.19 | 359 | 0.00 | 0 | 948.93 | 359 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 998.01 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.15 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 4.13 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 7,921.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 4.13 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 6,844.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,011.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 46.24 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 12,739.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 0.15 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 46.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 428.79 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 1,081.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 796.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 7,851.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 4,524.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 450.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 1,978.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,174.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 190.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 203.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2368211 | Primary Facility | 2015-05-07 | Routine/Partial Inspection | No Violations Noted | |
2370305 | Primary Facility | 2015-05-12 | Routine/Partial Inspection | No Violations Noted | |
2374856 | Primary Facility | 2015-05-27 | Routine/Partial Inspection | No Violations Noted | |
2398715 | Primary Facility | 2015-08-12 | Routine/Partial Inspection | No Violations Noted | |
2444155 | Primary Facility | 2016-01-25 | Routine/Partial Inspection | No Violations Noted | |
2620510 | Primary Facility | 2017-07-31 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. The production tanks are on containment. There are 2 GPUs and a combustor also on site. There is a pipeline header on the well pad. The well head is fenced and has jersey barriers. Well tag in place. PCSM plan has been implemented. The site has vegetated and rocked ditching, 2 basins with spillways and rip rap outlets, and the site has infiltration trenching with rip rap outlets. Site is 100% vegetated. |
2638656 | Primary Facility | 2017-09-14 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well is in production. Well integrity was in good condition. There is a casing pressure gauge reading 700 psi. Cellar is filled close to the top with gravel. There is a few inches of water on top of that. There was no bubbling. There are 3 tanks onsite (2 for produced water and 1 for condensate) that are contained within a lined, steel dike. There was also 2 line heaters and separators within a second lined, steel dike. Production is being reported to the Department. |
2839822 | Primary Facility | 2019-01-30 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site. PCSM BMPs in place, maintained, and functioning. Site stabilized with vegetation. |
For data sources see[8]