If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22446 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.822761,"lon":-79.752431,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Clearfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152624 | |
Farm/Lease Name: GALAN B UNIT | |
License Status: Active | |
Spud Date: 2015-07-28 | |
Permit Date: 2015-06-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.822761 | |
Longitude: -79.752431 |
Date | Event |
---|---|
2015-06-23 | New Permit Application |
2015-07-27 | Performed Spud Operation |
2015-08-27 | Drilling Completion |
2016-04-21 | Perforation |
2016-05-11 | Perforation |
2016-05-11 | Performed Stage 1 of Stimulation |
2016-05-12 | Perforation |
2016-05-12 | Performed Stage 2 of Stimulation |
2016-05-13 | Perforation |
2016-05-13 | Performed Stage 3 of Stimulation |
2016-05-16 | Perforation |
2016-05-16 | Performed Stage 4 of Stimulation |
2016-05-16 | Performed Stage 5 of Stimulation |
2016-05-18 | Perforation |
2016-05-18 | Performed Stage 6 of Stimulation |
2016-05-18 | Performed Stage 7 of Stimulation |
2016-05-19 | Perforation |
2016-05-19 | Performed Stage 8 of Stimulation |
2016-05-20 | Perforation |
2016-05-20 | Performed Stage 9 of Stimulation |
2016-05-21 | Perforation |
2016-05-21 | Performed Stage 10 of Stimulation |
2016-05-23 | Perforation |
2016-05-23 | Performed Stage 11 of Stimulation |
2016-05-23 | Performed Stage 12 of Stimulation |
2016-05-24 | Perforation |
2016-05-24 | Performed Stage 13 of Stimulation |
2016-05-25 | Perforation |
2016-05-25 | Performed Stage 14 of Stimulation |
2016-05-26 | Perforation |
2016-05-26 | Performed Stage 15 of Stimulation |
2016-05-27 | Perforation |
2016-05-27 | Performed Stage 16 of Stimulation |
2016-05-27 | Performed Stage 17 of Stimulation |
2016-05-28 | Perforation |
2016-05-28 | Performed Stage 18 of Stimulation |
2016-05-31 | Perforation |
2016-05-31 | Performed Stage 19 of Stimulation |
2016-06-01 | Perforation |
2016-06-01 | Performed Stage 20 of Stimulation |
2016-06-01 | Performed Stage 21 of Stimulation |
2016-06-02 | Perforation |
2016-06-02 | Performed Stage 22 of Stimulation |
2016-06-03 | Perforation |
2016-06-03 | Performed Stage 23 of Stimulation |
2016-06-03 | Performed Stage 24 of Stimulation |
2016-06-04 | Perforation |
2016-06-04 | Performed Stage 25 of Stimulation |
2016-06-06 | Perforation |
2016-06-06 | Performed Stage 26 of Stimulation |
2016-06-07 | Perforation |
2016-06-07 | Performed Stage 27 of Stimulation |
2016-06-08 | Perforation |
2016-06-08 | Performed Stage 28 of Stimulation |
2016-06-09 | Perforation |
2016-06-09 | Performed Stage 29 of Stimulation |
2016-06-20 | Perforation |
2016-06-20 | Performed Stage 30 of Stimulation |
2016-06-21 | Performed Stage 31 of Stimulation |
2017-01-04 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-05-11 | 2016-06-21 | 6,202 | 13,549,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | XTO Energy/ExxonMobil | Carrier | Water | 7732-18-5 | 100 | 90.9301 | 0 |
Other Ingredients | C&J Well Services | Other Ingredients | Water | 7732-18-5 | 96 | 0.017952 | 0 | |
Water | 7732-18-5 | 92.5 | 0.886426 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00009200 | 0 | ||||
CJENERGY-Surfactant-00026 | Proprietary | 1 | 0.000922 | 0 | ||||
CJENERGY-Polymer-00024 | Proprietary | 35 | 0.032275 | 0 | ||||
Water | 7732-18-5 | 85 | 0.032799 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001844 | 0 | ||||
Water | 7732-18-5 | 31 | 0.028586 | 0 | ||||
CJENERGY-Surfactant-00025 | Proprietary | 3 | 0.002766 | 0 | ||||
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.002766 | 0 | ||||
HC-7.5 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.071872 | 0 | |
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.40234 | 0 | |
Iron Oxide | 1309-37-1 | 0.1 | 0.002405 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.009052 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 0.822092 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.000823 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.026452 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.051836 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002405 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.004712 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.004712 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 4.70767 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.000823 | 0 | ||||
SI-6 PA-Only | C&J Well Services | PA-Proprietary | Ammonium Chloride | 12125-02-9 | 2 | 0.000374 | 0 | |
Methanol | 67-56-1 | 1 | 0.000187 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001122 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000374 | 0 | ||||
FR-16 PA-Only | C&J Well Services | PA-Proprietary | Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.041496 | 0 | |
Ethylene Glycol | 107-21-1 | 5 | 0.004611 | 0 | ||||
HC-15 | C&J Well Services | Bulk Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.005788 | 0 | |
CI-3 | C&J Well Services | Acid Corrosion Inhibitors | 2-Butoxyethanol | 111-76-2 | 15 | 0.00014 | 0 | |
1-DECANOL | 112-30-1 | 5 | 0.00004700 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.00014 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000187 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.00014 | 0 | ||||
Nonyphenol (branched), ethoxylated | 127087-87-0 | 5 | 0.00004700 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000373 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00002300 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 2.5 | 0.00002300 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00002300 | 0 | ||||
BIO-CLEAR 2000 | C&J Well Services | Biocides | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006335 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-05-11 | 1 | SAND | 11,123,798 | 7,142 | 4,924 |
2016-05-12 | 2 | SAND | 11,123,798 | 7,366 | 5,864 |
2016-05-13 | 3 | SAND | 11,123,798 | 7,676 | 5,839 |
2016-05-16 | 4 | SAND | 11,123,798 | 7,584 | 5,585 |
2016-05-16 | 5 | SAND | 11,123,798 | 7,651 | 5,848 |
2016-05-18 | 6 | SAND | 11,123,798 | 7,869 | 5,190 |
2016-05-18 | 7 | SAND | 11,123,798 | 7,369 | 5,688 |
2016-05-19 | 8 | SAND | 11,123,798 | 7,463 | 6,519 |
2016-05-20 | 9 | SAND | 11,123,798 | 7,225 | 6,345 |
2016-05-21 | 10 | SAND | 11,123,798 | 7,154 | 5,934 |
2016-05-23 | 11 | SAND | 11,123,798 | 7,442 | 5,669 |
2016-05-23 | 12 | SAND | 11,123,798 | 7,223 | 206 |
2016-05-24 | 13 | SAND | 11,123,798 | 7,142 | 5,671 |
2016-05-25 | 14 | SAND | 11,123,798 | 7,013 | 5,659 |
2016-05-26 | 15 | SAND | 11,123,798 | 6,780 | 5,527 |
2016-05-27 | 16 | SAND | 11,123,798 | 7,126 | 5,744 |
2016-05-27 | 17 | SAND | 11,123,798 | 7,727 | 5,930 |
2016-05-28 | 18 | SAND | 11,123,798 | 6,528 | 5,756 |
2016-05-31 | 19 | SAND | 11,123,798 | 7,029 | 5,563 |
2016-06-01 | 20 | SAND | 11,123,798 | 7,039 | 5,690 |
2016-06-01 | 21 | SAND | 11,123,798 | 7,250 | 5,804 |
2016-06-02 | 22 | SAND | 11,123,798 | 7,470 | 6,869 |
2016-06-03 | 23 | SAND | 11,123,798 | 7,283 | 5,907 |
2016-06-03 | 24 | SAND | 11,123,798 | 6,118 | 5,869 |
2016-06-04 | 25 | SAND | 11,123,798 | 7,058 | 5,913 |
2016-06-06 | 26 | SAND | 11,123,798 | 7,421 | 5,236 |
2016-06-07 | 27 | SAND | 11,123,798 | 6,933 | 6,429 |
2016-06-08 | 28 | SAND | 11,123,798 | 6,536 | 5,845 |
2016-06-09 | 29 | SAND | 11,123,798 | 6,383 | 5,574 |
2016-06-20 | 30 | SAND | 11,123,798 | 6,835 | 5,890 |
2016-06-21 | 31 | SAND | 11,123,798 | 6,424 | 4,969 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 954,831.00 | 355 | 0.00 | 0 | 30.00 | 79 |
2018 | XTO ENERGY INC | 603,767.72 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 594,258.85 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | XTO ENERGY INC | Drill Cuttings | 1,077.26 Tons | LANDFILL | 100585 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 6,140.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 47.55 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Fracturing Fluid Waste | 71.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 5,958.44 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 382.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 13,415.69 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2017 | XTO ENERGY INC | Produced Fluid | 4,491.11 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 20,092.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 324.66 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 320.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 10,155.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 402.11 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 4,246.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 2,781.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,433.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 2,000.41 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2393919 | Primary Facility | 2015-07-28 | Routine/Partial Inspection | No Violations Noted | |
2397127 | Primary Facility | 2015-08-06 | Routine/Partial Inspection | No Violations Noted | |
2403136 | Primary Facility | 2015-08-27 | Drilling/Alteration | No Violations Noted | |
2403145 | Primary Facility | 2015-08-28 | Routine/Partial Inspection | No Violations Noted | |
2486233 | Primary Facility | 2016-05-18 | Complaint Inspection | No Violations Noted | |
2535908 | Primary Facility | 2016-11-14 | Administrative/File Review | No Violations Noted | |
2544147 | Primary Facility | 2016-12-02 | Routine/Partial Inspection | No Violations Noted | |
2583106 | Primary Facility | 2017-04-05 | Routine/Partial Inspection | No Violations Noted | |
2681467 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues. |
2698871 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier. Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad. All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated. |
2835581 | Primary Facility | 2019-02-04 | Routine/Partial Inspection | No Violations Noted | On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained. |
For data sources see[9]