If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22616 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.797819,"lon":-79.735776,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Winfield Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 154148 | |
Farm/Lease Name: PER W34 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-06-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.797819 | |
Longitude: -79.735776 |
Date | Event |
---|---|
2017-06-12 | New Permit Application |
2017-09-14 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-12 | 2018-10-23 | 6,277 | 15,777,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.3162 | 131,659,000.0 |
TRS 805X | Tight Rock Solutions | Friction Reducer | Aliphatic Hydrocarbon | Proprietary | 30 | 0.0186838 | 28832.6 | |
Alcohol Alkoxylates | Proprietary | 5 | 0.00311396 | 4805.43 | ||||
TRS 17888 | Tight Rock Solutions | Friction Reducer | Inorganic Salt | Proprietary | 10 | 0.00262416 | 4049.56 | |
Substituted alkylamine | Proprietary | 1 | 0.000262416 | 404.956 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.00787247 | 12148.7 | ||||
Oxyalkylated alcohol | Proprietary | 5 | 0.00131208 | 2024.78 | ||||
TRS 3001 | Tight Rock Solutions | Scale Control | Ethylene Glycol | 107-21-1 | 5 | 0.00091748 | 1415.84 | |
Amine Triphosphate | Proprietary | 30 | 0.00550488 | 8495.05 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.00091748 | 1415.84 | ||||
BIOC12031A | Nalco | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.00661234 | 10204.1 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.00091748 | 1415.84 | |
Ethylene Glycol | 107-21-1 | 5 | 0.00091748 | 1415.84 | ||||
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000523027 | 807.128 | ||||
Methanol | 0000067-56-1 | 5 | 0.00005230 | 80.713 | ||||
Inorganic Salt | Proprietary | 10 | 0.00262416 | 4049.56 | ||||
Alcohol Alkoxylates | Proprietary | 5 | 0.00311396 | 4805.43 | ||||
Oxyalkylated alcohol | Proprietary | 5 | 0.00131208 | 2024.78 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00001046 | 16.143 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00001046 | 16.143 | ||||
Water | 7732-18-5 | 92.5 | 2.1612 | 3,335,140.0 | ||||
Substituted alkylamine | Proprietary | 1 | 0.000262416 | 404.956 | ||||
Sand (Proppant) | Sargent/Momentive/Prefferred | Proppant | Silica Substrate | 14808-60-7 | 100 | 12.2169 | 18,852,900.0 | |
Unihib G | Geosafe | Corrosion Inhibitor | Methanol | 0000067-56-1 | 5 | 0.00005230 | 80.713 | |
Butyl digycol | 0000112-34-5 | 75 | 0.000784541 | 1210.69 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00001046 | 16.143 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00001046 | 16.143 | ||||
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000523027 | 807.128 | ||||
Hydrochloric Acid (7.5%) | PVS | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.175233 | 270417 | |
Water | 7732-18-5 | 92.5 | 2.1612 | 3,335,140.0 | ||||
AP Breaker | Lubrizol | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.000544328 | 840 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNENERGY RESOURCES LLC | 1,466,972.00 | 347 | 0.00 | 0 | 0.00 | 31 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 18.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 24.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 328.33 Bbl | REUSE (AT WELL PAD) | |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 16.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | Drill Cuttings | 397.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 1,015.54 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,308.01 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 614.17 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil & Gas Related Spills | 3.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 10.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 1,109.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 17.96 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 390.01 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil | 3.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil | 2.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 32,132.98 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Soil Contaminated by Oil & Gas Related Spills | 2.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 18.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Filter Socks | 0.68 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 7.71 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Servicing Fluid | 13.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 1.91 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 29.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2638065 | Primary Facility | 2017-09-14 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Soilmec was onsite using an auger on the #2H well. This well has not yet been spud. Notification has been sent in to spud the well today. Location is stoned. Permit (paper form) and Emergency Response sign is posted at the lease entrance. |
2639187 | Primary Facility | 2017-09-19 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, no activity was taking place at the well. Containment is laid out over pad. Cellar is set and conductor is cemented in. Cattle fence is surrounding well. Areas to the side of pad have been seeded and mulched. |
2647381 | Primary Facility | 2017-10-03 | Drilling/Alteration | No Violations Noted | At the time of inspection, Highlands rig 9 is onsite setting up to perform a BOP test. Surface casing was cemented using 615 sxs Class H, 2% Gypsum, 5% salt, (133 bbls), 15.8 ppg, 1.22 yield. Displaced with 108 bbls and had 25 bbls cement return to surface. A float shoe and float collar (top at 689') were used along with 9 centralizers. Containment appeared to be in good condition. |
2649109 | Primary Facility | 2017-10-10 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Highlands rig 9 is onsite skidding to the #5H well. This well had intermediate casing cemented using 995 sxs Class H (212 bbls), 2% Gypsum, 15.8 ppg, 1.2 yield. Displaced with 205 bbls freshwater. Plug was bumped and floats held. 40 bbls of cement were returned to surface. A float shoe and float collar (top at 2705') along with 37 centralizers. |
2709645 | Primary Facility | 2018-03-26 | Administrative/File Review | No Violations Noted | |
2712799 | Primary Facility | 2018-03-27 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 259 was skid on to well. A Pre-spud meeting took place while onsite. Operator plans to drill to 15369' and expect a "big hump" in formations at the tail end of the lateral. Containment was being patched. Rig was waiting for BOP testers to show up and perform test. |
2715080 | Primary Facility | 2018-04-06 | Administrative/File Review | No Violations Noted | |
2715730 | Primary Facility | 2018-04-04 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 259 was drilling 8 1/2" hole. Attempt to drill 8 3/4" hole to TD did not work, only made it to 8984'. Drilling has been going slow due to making multiple trips to adjust or change BHA. 5 or 6 trips were made so far.
BOP had been tested on 3/27. Nothing appeared to be out of the ordinary off or on containment. |
2719294 | Primary Facility | 2018-04-10 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Patterson 259 was drilling on the #5H well. The #4H well had production casing cemented using a lead 1 of 320 sxs HalCem (72 bbls), 14.5 ppg, 1.259 yield, a lead 2 of 1060 sxs ShaleCem (238 bbls), 14.5 ppg, 1.26 yield, and tail of 1300 sxs SoluCem (421 bbls), 15.2 ppg, 1.82 yield. This was displaced with 20 bbls KCl followed by 317 bbls freshwater. Plug landed and floats held. 53 bbls cement returned to surface. |
2722760 | Primary Facility | 2018-04-25 | Routine/Partial Inspection | No Violations Noted | On 4/25/2018, WQS Brian MacQuarrie onsite for the purpose of conducting an site inspection. Sign maintained at entrance identifying site and individual signs for wells and permit Nos. . Site mailbox contains Erosion and Sedimentation Plan and E/S inspection reports with most recent conducted on 4/17/2018. Site access road maintained. Patterson Rig # 259 no longer onsite. Soundwall constructed around well pad. Six wells spudded including ; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and the 6H-019-22617. |
2734849 | Primary Facility | 2018-05-29 | Administrative/File Review | No Violations Noted | |
2752877 | Primary Facility | 2018-07-16 | Routine/Partial Inspection | No Violations Noted | On 7-16-2018, WQS Brian MacQuarrie onsite for the purpose of conducting an site inspection. Sign maintained at entrance identifying site and individual signs for wells and permit Nos.. Site access road maintained. Patterson Rig # 259 no longer onsite. Soundwall constructed around well pad. Six wells drilled including ; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and the 6H-019-22617. |
2794384 | Primary Facility | 2018-10-24 | Routine/Partial Inspection | No Violations Noted | On 11/24/2018, WQS Brian MacQuarrie onsite meet with Frank Kocher (PennEnergy). Universal and Renegade onsite. Well stimulation activities underway. Wells 6H-019-22617 and 4H-019-22616 fraced. Four wells left to be fraced, 1H-019-22613, 2H-019-22614, 3H-019-22615 and 5H-019-22661. Secondary containment setup. Large AST onsite to aid in frac. Erosion and Sedimentation BMPs maintained. Vegetative growth well established. |
2813980 | Primary Facility | 2018-12-12 | Routine/Partial Inspection | No Violations Noted | On 12/12/2018, WQS Brian MacQuarrie onsite. Meet with Heath Cunningham-PennEnergy. Deep well services onsite. Snubbing unit #3 is onsite. Currently plugs are being drilled out and production tubing installed in six wells; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22617 and 6H-019-22617. Well site secondary containment setup. Large AST onsite and contains approximately 8 inches of impaired water. Erosion and Sedimentation BMPs installed and maintained. |
2832629 | Primary Facility | 2019-01-28 | Routine/Partial Inspection | No Violations Noted | On 1/28/2019, WQS Brian MacQuarrie onsite. Six wells fraced; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and 6H-019-22617. Crew onsite flowing back the 2H . The last of six wells. Three 400 bbl production fluid tanks installed within stainless steel containment structure. Large AST onsite containing impaired water. Water from AST is currently being hauled to the B17 well pad in Beaver County. Frac tanks installed within secondary containment. Snow on ground during inspection. |
2833620 | Primary Facility | 2019-01-30 | Administrative/File Review | No Violations Noted |
For data sources see[8]