If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22646 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.846578,"lon":-79.935097,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Butler Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 154296 | |
Farm/Lease Name: AK STEEL A UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-08-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.846578 | |
Longitude: -79.935097 |
Date | Event |
---|---|
2017-08-07 | New Permit Application |
2017-11-13 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-24 | 2018-04-16 | 5,695 | 14,968,500 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-3 | C&J Energy Services | Acid Corrosion Inhibitors | Listed Below | Listed Below | 0 | 0 | 0 |
Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 | |
1-OCTANOL | 111-87-5 | 2.5 | 0.00004300 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00241 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000257 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 35 | 0.0245 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.4238 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000685 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.040808 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.010429 | 0 | ||||
Alcohols, C12-15-branched and linear, ethoxylated propoxylated |
120313-48-6 | 2 | 0.0014 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001425 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.0035 | 0 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00004300 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001128 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.015678 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.40778 | 0 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 30 | 0.021 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000257 | 0 | ||||
Water | 7732-18-5 | 30 | 0.021 | 0 | ||||
Water | 7732-18-5 | 90 | 0.006539 | 0 | ||||
Water | 7732-18-5 | 96 | 0.018053 | 0 | ||||
Water | 7732-18-5 | 28.5 | 0.005945 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006257 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00008600 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00371 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 10 | 0.000727 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00241 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00007000 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.70611 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.07084 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00371 | 0 | ||||
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega hydroxy-, branched |
127087-87-0 | 5 | 0.00008600 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00004300 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000257 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 2 | 0.0014 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.026512 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000342 | 0 | ||||
Tar Bases, Quinoline Derivs. | 68513-87-1 | 1 | 0.00001700 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000376 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.000188 | 0 | ||||
Ethoxylated Sorbitan Monooleate | 9005-65-6 | 1 | 0.0007 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.873697 | 0 | ||||
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat e |
108818-88-8 | 2 | 0.0014 | 0 | ||||
Sodium Acetate Anhydrous | 127-09-3 | 3 | 0.0021 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000376 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001425 | 0 | ||||
Water | 7732-18-5 | 30 | 0.000513 | 0 | ||||
HC-7.5 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
SI-6 PA-Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-16 | C&J Energy Services | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-10 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
BIO-CLEAR 2000 | C&J Energy Services | Biocides | Listed Below | Listed Below | 0 | 0 | 0 | |
Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 91.3916 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 341,500.23 | 163 | 0.00 | 0 | 1,433.28 | 163 |
2019 | XTO ENERGY INC | 1,061,512.15 | 363 | 0.00 | 0 | 3,766.09 | 363 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | XTO ENERGY INC | Drilling Fluid Waste | 800.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Drilling Fluid Waste | 1,279.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Drill Cuttings | 436.54 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 23.64 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Produced Fluid | 2,924.37 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 1,051.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Drill Cuttings | 923.96 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 15.47 Tons | LANDFILL | 100434 |
2018 | XTO ENERGY INC | Waste Water Treatment Sludge | 32.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 26,099.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 403.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 7,988.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 4,792.56 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 18,690.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 1,496.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2652833 | Primary Facility | 2017-10-26 | Preoperation Inspection | No Violations Noted | Well staked out, ready for spudding.
Well site is fully constructed with all E/S controls installed. Site ID sign and drilling permit on site. |
2664008 | Primary Facility | 2017-11-16 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, a Soilmec SR 30 auger rig is onsite drilling mouse holes. Well was spud and has 24" conductor set to 42'. Cellar is also set. Well was covered with a steel plate. Cuttings were being sent to a roll off. There were sound walls set up on the eastern and northern sides of the pad. Location is stoned. The Emergency Response sign and permit sign are posted at the entrance to the lease access road. |
2671858 | Primary Facility | 2017-12-07 | Drilling/Alteration | No Violations Noted | At the time of inspection, Appalachian Drillers rig 1 was onsite drilling 12 3/8" hole. Surface casing cemented using 530 sxs Class A (115 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 69 bbls water and landed plug, floats held. Did not get cement to surface. DEP notified with top of cement believed to be 40' down. This was grouted to surface. A float collar and float shoe were used with 4 centralizers. Bulk of water encountered during drilling was at 170', it was fresh. Plan is to drill to 2066' and set 2046' of 9 5/8" casing. Containment appeared in good condition. Chemicals were all on it. |
2671924 | Primary Facility | 2017-12-11 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Appalachian Drillers rig 1 has moved offsite and the last of the equipment is being removed. Intermediate casing was cemented using 700 sxs Class A (152 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 156 bbls water and landed plug, floats held. 21 bbls cement was returned to surface. A float collar and float shoe were used with 16 centralizers. Containment remains laid out and is being held down by bags of pellets. Well is covered by a steel plate and surrounded by a cattle fence. |
2675455 | Primary Facility | 2017-12-28 | Routine/Partial Inspection | No Violations Noted | Well has intermediate casing ran and cemented. Steel plate over cellar with well in it. Cattle gate on top off steel plate. Sound walls around the East and South ends off the well pad. |
2684808 | Primary Facility | 2018-01-18 | Administrative/File Review | No Violations Noted | |
2700520 | Primary Facility | 2018-02-22 | Drilling/Alteration | No Violations Noted | At the time of inspection, Nomac 79 was getting ready to drill. BOP was tested this morning and passed. There was a good deal of rain water within containment. All chemicals were within containment. One of the berms near the majority of chemicals was torn and ripped apart. I told the company man about this and he said that he already had a containment guy coming out today to fix. |
2701916 | Primary Facility | 2018-03-07 | Administrative/File Review | No Violations Noted | |
2703034 | Primary Facility | 2018-03-06 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Nomac 79 was rigging down. Equipment was being moved to the Lesney Pad. This well had production casing cemented using a lead of 400 sxs 35:65 Poz Class H (79 bbls), 15.2, 1.1 yield and tail of 1390 sxs Class H (387 bbls), 35% acid soluble, 16.6 ppg, 1.56 yield. This was displaced with 318 bbls water. Plug landed and 14 bbls of spacer returned to surface. Floats held. |
2707865 | Primary Facility | 2018-03-21 | Administrative/File Review | No Violations Noted | |
2707868 | Primary Facility | 2018-03-21 | Administrative/File Review | No Violations Noted | |
2707870 | Primary Facility | 2018-03-21 | Administrative/File Review | No Violations Noted | |
2715802 | Primary Facility | 2018-04-09 | Administrative/File Review | No Violations Noted | |
2727898 | Primary Facility | 2018-05-09 | Routine/Partial Inspection | No Violations Noted | On 5/09/2018, WQS Brian MacQuarrie onsite. Additional E/S controls (straw bales) added to infiltration berms along access road. Contact Matt Thomas-XTO Energy, Major Modification to address infiltration basin and berms is in the process of being submitted. No activity on well site. Two wells drilled, Permit No. 019-22645 and 019-22646. |
2734898 | Primary Facility | 2018-05-29 | Administrative/File Review | No Violations Noted | |
2763049 | Primary Facility | 2018-08-13 | Routine/Partial Inspection | No Violations Noted | On 8/13/2018, WQS Brian MacQuarrie onsite. Two wells in production, permit no. 019-22645 and 019- 22646. Tank battery consists of three 400 bbl tanks installed within steel secondary containment structure. Infiltration berms and basin installed. Major modification to address infiltration basin submitted by the operator to the Department. Vegetative growth established in previously disturbed areas. |
2813187 | Primary Facility | 2018-12-10 | Routine/Partial Inspection | No Violations Noted | On 12/10/2018, WQS Brian MacQuarrie conducted a site inspection. Site consists of two wells in production the 1H-019-22645 and 2H -019-22646). Production equipment consists of three 400 bbl tanks, 2 GPus and TVO. A Well Site Restoration Extension request was submitted by the operator on 8/31/2018 for the purpose of addressing stormwater issues. A major modification has been submitted and extension will be granted until 8/30/2019. |
For data sources see[8]