X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22669

Well Details

Well ID: 37-019-22669
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Allegheny Township
Operator Name: EM ENERGY PA LLC
Well Pad ID: 152989
Farm/Lease Name: SCULPTOR 3-MH
License Status:
Spud Date: 2017-10-07
Permit Date: 2017-08-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.125133
Longitude: -79.748003

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-08-21 New Permit Application
2017-10-07 Performed Spud Operation
2018-02-07 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-16 2018-05-31 5,483 15,904,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand, White BJ Services Proppant Listed Below
Glutaraldehyde 111-30-8 30 0.00334735 5923.36
Citric Acid 77-92-9 60 0.00252197 4462.79
Fatty Acids 61790-12-3 10 0.00009665 171.032
Crystalline Silica (Quartz) 14808-60-7 100 11.9292 21,109,400.0
Formaldehyde 50-00-0 1 0.00000967 17.103
Modified Thiourea Polymer 68527-49-1 7 0.00006766 119.722
Hydrochloric Acid 7647-01-0 15 0.0479857 84913.8
Olefin 64743-02-8 5 0.00004833 85.516
Ethylene Glycol 107-21-1 5 0.000555159 982.391
Olefin 64743-02-8 5 0.00004833 85.516
Water 7732-18-5 92.5 0.533039 943248
Citric Acid 77-92-9 60 0.00252197 4462.79
Polyoxyalkylenes 68951-67-7 30 0.000289955 513.095
Formaldehyde 50-00-0 1 0.00000967 17.103
Propargyl Alcohol 107-19-7 5 0.00004833 85.516
Water 7732-18-5 100 74.9397 132,611,000.0
Sodium Phosphate, Tribasic 7601-54-9 5 0.000555159 982.391
Water 7732-18-5 92.5 0.533039 943248
Hydrochloric Acid 7647-01-0 15 0.0479857 84913.8
Fatty Acids 61790-12-3 10 0.00009665 171.032
Amine Triphosphate Proprietary 30 0.00333096 5894.35
Modified Thiourea Polymer 68527-49-1 7 0.00006766 119.722
Methanol 67-56-1 100 0.000966517 1710.32
Crystalline Silica (Quartz) 14808-60-7 100 11.9292 21,109,400.0
Polyoxyalkylenes 68951-67-7 30 0.000289955 513.095
Aliphatic Hydrocarbon Proprietary 30 0.0205983 36450.1
Propargyl Alcohol 107-19-7 5 0.00004833 85.516
Methanol 67-56-1 100 0.000966517 1710.32
Alcohol Alkoxylates Proprietary 5 0.00343306 6075.02
HCl, 5.1 - 7.5% BJ Services Acidizing Listed Below
CI-14 BJ Services Corrosion Inhibitor Listed Below
Water BJ Services Carrier Listed Below
ResCare IC 300L BJ Services Iron Control Listed Below
HCl, 10.1 - 15% BJ Services Acidizing Listed Below
Frac Fluid Package TightROCK Solutions LLC Frac Fluid Additives Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2018 EM ENERGY PA LLC 407,852.31 96 0.00 0 5,481.30 96
2019 EM ENERGY PA LLC 30,011.83 10 0.00 0 1,496.60 10

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EM ENERGY PA LLC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drill Cuttings 21.24 Tons LANDFILL CID # 28726
2017 EM ENERGY PA LLC Other Oil & Gas Wastes 103.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drilling Fluid Waste 37.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 EM ENERGY PA LLC Drilling Fluid Waste 179.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drill Cuttings 715.17 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Produced Fluid 65.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EM ENERGY PA LLC Synthetic Liner Materials 0.64 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Drill Cuttings 291.57 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Drill Cuttings 274.54 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Produced Fluid 2,134.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EM ENERGY PA LLC Drilling Fluid Waste 51.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 EM ENERGY PA LLC Produced Fluid 1,847.40 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 15.44 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Drilling Fluid Waste 42.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 8.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Soil Contaminated by Oil & Gas Related Spills 2.90 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Produced Fluid 2.17 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 99.00 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Synthetic Liner Materials 5.98 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EM ENERGY PA LLC Drilling Fluid Waste 110.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Produced Fluid 4,653.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Produced Fluid 452.50 Bbl INJECTION DISPOSAL WELL 34-155-24063
2018 EM ENERGY PA LLC Produced Fluid 20.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EM ENERGY PA LLC Servicing Fluid 1.72 Bbl RESIDUAL WASTE PROCESSING FACILITY 101674
2018 EM ENERGY PA LLC Produced Fluid 4,480.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 EM ENERGY PA LLC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EM ENERGY PA LLC Produced Fluid 1.53 Bbl LANDFILL 100585
2019 EM ENERGY PA LLC Soil Contaminated by Oil 0.80 Tons LANDFILL CID # 28726
2019 EM ENERGY PA LLC Produced Fluid 173.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2019 EM ENERGY PA LLC Produced Fluid 858.00 Bbl REUSE (AT WELL PAD)
2019 EM ENERGY PA LLC Soil Contaminated by Oil & Gas Related Spills 0.80 Tons LANDFILL CID # 28726

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2647386 Primary Facility 2017-10-10 Routine/Partial Inspection No Violations Noted At the time of inspection, HAD was onsite with 2 rotary rigs drilling conductor on the #4MH and #8MH wells. Well has conductor set to 98' GL. Cuttings were being sent to closed top tanks. Manholes on top were left open to vent because air was being used to drill. Rig and air packs were on containment. Cellars have not been set yet. Permits were in Company man's truck. The Emergency Response sign is accurately posted. Permit sign does not have all wells on pad posted. A new sign was going to be made. Copies of permits will be placed in mailbox in the meantime.
2662202 Primary Facility 2017-11-09 Routine/Partial Inspection No Violations Noted At the time of inspection, H & P 521 was onsite over the 1MH well. Surface casing for this well was cemented using 544 sxs Type 1 (116 bbls), 3% CaCl2, 15.6 ppg, 1.2 yield. Displaced with 98 bbls water and bumped plug. 25 bbls cement returned to surface. Floats held. A float shoe and float collar were used along with 10 centralizers.
2670255 Primary Facility 2017-12-05 Routine/Partial Inspection No Violations Noted At the time of inspection, H & P 521 is working over the 5 MH well. This well had intermediate casing cemented using O-Tex with a lead of 530 sxs Class H (142 bbls), 1% CaCl2, 2% Gypsum, 8% salt, 14.5 ppg, 1.5 yield and tail of 180 sxs Class H (39 bbls), 2% CaCl2, 2% Gypsum, 5% salt, 15.7 ppg, 1.23 yield. This was displaced with 186 bbls water. Plug was bumped. Float held (1 1/2 bbl bled back). 25 bbls cement back to surface. A guide shoe and float collar were used, along with 29 centralizers.
2690065 Primary Facility 2018-02-01 Administrative/File Review No Violations Noted
2692934 Primary Facility 2018-02-05 Drilling/Alteration No Violations Noted At the time of inspection, H & P 521 was onsite drilling curve of well with 8 1/2" bit. They were drilling with mud. BOP was tested on 2/3. Snow was covering containment, but looked good for what could be seen. Plan is to TD on Wednesday.
2697742 Primary Facility 2018-02-15 Routine/Partial Inspection No Violations Noted At the time of inspection, H & P 521 was rigging down for move. This well had production casing cemented using a lead of 410 sxs GasStop (104 bbls), 14.5 ppg, 1.43 yield and tail of 2140 sxs ShaleCem (484 bbls), 15 ppg, 1.27 yield. Displacement was 318 bbls freshwater (10 # sugar was run in first 10 bbls). Plug was bumped and floats held. 58 bbls spacer to surface. Top of cement estimated to be at 2600'.
2703832 Primary Facility 2018-03-12 Administrative/File Review No Violations Noted
2730065 Primary Facility 2018-05-15 Administrative/File Review No Violations Noted
2759415 Primary Facility 2018-08-02 Administrative/File Review No Violations Noted

For data sources see[8]

References