Well Details

Well ID: 37-019-22689
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 154623
Farm/Lease Name: PRAGER B UNIT 3H
License Status:
Spud Date: 2018-01-12
Permit Date: 2017-11-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.825397
Longitude: -79.829808

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-11-08 New Permit Application
2018-01-10 Performed Spud Operation
2018-04-22 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-19 2018-10-17 6,224 26,153,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000204 0
2-Propenamide as residual 79-06-1 0.1 0.00005800 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006181 0
Water 7732-18-5 85 0.064293 0
Ammonium Sulfate 7783-20-2 20 0.000938 0
Cinnamaldehyde 104-55-2 15 0.000204 0
Ethylene Glycol 107-21-1 5 0.002882 0
Hydrochloric Acid 7647-01-0 7.5 0.050978 0
Polyethylene glycol 25322-68-3 50 0.010302 0
Water 7732-18-5 30 0.017294 0
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega
hydroxy-, branched
127087-87-0 5 0.00006800 0
Crystalline Silica, quartz 14808-60-7 99.9 4.18933 0
Water 7732-18-5 28.5 0.005872 0
CJENERGY-Buffering Agent-45 Proprietary 17 0.004119 0
Sodium Acetate Anhydrous 127-09-3 3 0.001729 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001133 0
Urea 57-13-6 5 0.000234 0
CJENERGY-Anionic Polymer-44 Proprietary 5 0.000234 0
1-OCTANOL 111-87-5 2.5 0.00003400 0
Iron Oxide 1309-37-1 0.1 0.001568 0
Acrylamide as residual 79-06-1 9.9 0.000464 0
Water 7732-18-5 96 0.018126 0
Ethylene Glycol 107-21-1 40 0.000545 0
Acrylamide as residual 79-06-1 0.1 0.00002400 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.017294 0
2-Butoxyethanol 111-76-2 15 0.000204 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 30 0.007268 0
Methanol 67-56-1 1 0.000189 0
Hydrochloric Acid 7647-01-0 15 0.011346 0
Iron Oxide 1309-37-1 0.1 0.00282 0
Aluminum Oxide 1344-28-1 1.1 0.046129 0
CJENERGY-Surfactant-46 Proprietary 3 0.000727 0
Titanium Oxide 13463-67-7 0.1 0.00282 0
Aluminum Oxide 1344-28-1 1.1 0.017252 0
1-DECANOL 112-30-1 5 0.00006800 0
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated
120313-48-6 2 0.001153 0
Tar Bases, Quinoline Derivs. 68513-87-1 1 0.00001400 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000576 0
Sodium Sulfate 7757-82-6 1 0.00004700 0
Anionic Polyacrylamide 38193-60-1 30 0.007268 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000378 0
Water 7732-18-5 100 0.00469 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.020177 0
Ammonium Chloride 12125-02-9 2 0.000378 0
Aluminum Oxide 1344-28-1 1.1 0.031024 0
Triethyl Phosphate 78-40-0 2.5 0.00003400 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
e
108818-88-8 2 0.001153 0
Water 7732-18-5 92.5 0.62873 0
CJENERGY-Emulsifier-47 Proprietary 1 0.000242 0
Water 7732-18-5 60 0.014536 0
Isopropanol 67-63-0 2.5 0.00003400 0
Iron Oxide 1309-37-1 0.1 0.004194 0
Crystalline Silica, quartz 14808-60-7 99.9 2.81756 0
Crystalline Silica, quartz 14808-60-7 99.9 1.56679 0
Titanium Oxide 13463-67-7 0.1 0.004194 0
Dimethylformamide 68-12-2 20 0.000273 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.001211 0
Titanium Oxide 13463-67-7 0.1 0.001568 0
CJENERGY-Polymer-43 Proprietary 30 0.001407 0
Sorbitan Monooleate 1338-43-8 2 0.001153 0
Water 7732-18-5 30 0.000409 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 90.535 0
FR-27 PA Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
CI-3 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
FR-28 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
HC-15 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
SI-6 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 976,555.35 331 0.00 0 96.73 331

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Synthetic Liner Materials 17.36 Tons LANDFILL 100585
2018 XTO ENERGY INC Drilling Fluid Waste 600.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 6,885.00 Bbl REUSE (AT WELL PAD)
2018 XTO ENERGY INC Drill Cuttings 1,386.83 Tons LANDFILL 100585
2018 XTO ENERGY INC Synthetic Liner Materials 28.46 Tons LANDFILL 100434
2018 XTO ENERGY INC Waste Water Treatment Sludge 51.45 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 9,777.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 6,717.76 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 120.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 8,887.96 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 20,977.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-133-20114

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2679224 Primary Facility 2018-01-08 Administrative/File Review No Violations Noted
2681933 Primary Facility 2018-01-12 Drilling/Alteration No Violations Noted Cellars where drilled and installed but where not cemented in place. Due to heavy rains cellars needed pumped out and repositioned before cementing in place. Conductor pipe is on site and 42' will be installed when cellars are ready.
2684571 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2684610 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2687340 Primary Facility 2018-01-17 Routine/Partial Inspection No Violations Noted At the time of inspection, well has been spud. 24" conductor was set to 42'. Appalachian Drillers are now onsite setting up equipment to start drilling top hole section of the well. Containment is laid out. Man camps are set up and drill pipe is arriving on location.
2687364 Primary Facility 2018-01-22 Drilling/Alteration No Violations Noted At the time of inspection, Appalachian Drillers 1 was waiting on cement.Surface casing was cemented using 545 sxs Class A (118 bbls), 2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displaced with 100 bbls water. Did not bump, floats held. 20 bbls returned to surface. A float shoe and float collar were used with 6 centralizers. A basket was used at 199'. The basket was used because a large seam of coal was noted from 230-236' and operator did not want to have an issue if circulation was lost.

Intermediate casing was cemented using 675 sxs Class A (147 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 150 bbls water. Plug landed and floats held. 25 bbls returned to surface. A float shoe and float collar were used along with 16 centralizers.

2696961 Primary Facility 2018-02-22 Routine/Partial Inspection No Violations Noted On 2/22/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Secondary containment setup around two recently top-holed wells. Erosion and Sedimentation Best Management Practices installed and maintained. Disturbed areas seeded and mulched. Site sign and access road maintained.
2718430 Primary Facility 2018-04-16 Administrative/File Review No Violations Noted
2720235 Primary Facility 2018-04-19 Drilling/Alteration No Violations Noted At the time of inspection, Patterson 579 was broke down and being worked on. Rig had made it to the landing point. Pipe racks were being set up and some 5 1/2" was waiting to be unloaded from a truck. Chemicals and fuel were all on containment. BOP had been tested on 4/15 and held.
2721151 Primary Facility 2018-04-23 Administrative/File Review No Violations Noted
2724221 Primary Facility 2018-04-24 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 579 was waiting on cement. Production casing was cemented using a lead of 390 sxs 35:65 Poz Class H (77 bbls), 15.2 ppg, 1.1 yield and tail of 1860 sxs 35% Acid Soluble Class H (519 bbls), 15.6 ppg, 1.57 yield. This was displaced with 373 bbls water. Plug landed on the latch collar. Floats held. Top of cement was calculated at 4750'.
2734844 Primary Facility 2018-05-29 Administrative/File Review No Violations Noted
2741975 Primary Facility 2018-06-15 Routine/Partial Inspection No Violations Noted On 6/15/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Two wells drilled. Erosion and Sedimentation Best Management Practices installed and maintained. Underdrain outlets 1, 2 and 4 repaired by adding additional rock. Initial redlines on Erosion and Sedimentation plan. Disturbed areas seeded and mulched. Vegetative growth well established. Site sign and access road maintained.
2776557 Primary Facility 2018-09-18 Routine/Partial Inspection No Violations Noted On 9/18/2018, WQS Brian MacQuarrie onsite meet with Bill Rice and Gary Winehart (XTO Energy). Currently stimulation activities are being conducted at the 1H (019-22687) and 3H (019-22689). Twenty three of 131 stages completed. Vegetation well established erosion and sedimentation bmp's maintained.
2809191 Primary Facility 2018-12-03 Administrative/File Review No Violations Noted
2831289 Primary Facility 2019-01-24 Routine/Partial Inspection No Violations Noted On 1/24/2019, WQS Brian MacQuarrie onsite. Two wells recently completed; 1H-019-22687 and 3H-019-22689. Crew onsite finishing up installing production equipment. Post Drilling Well Site Restoration Report submitted by operator on 1/08/2019. Erosion and Sedimentation BMPs installed and maintained. Drilling equipment removed from site.
2844000 Primary Facility 2019-02-25 Routine/Partial Inspection No Violations Noted On 2/25/2019, WQS Brian MacQuarrie onsite. Meet with Bill Rice (XTO Energy) well tender. Two wells, 1H (019-22687) and 2H (019-22689), recently placed into production. Tank battery consists of three 400 bbl tanks (one tank for condensate and two for production fluids), installed within secondary containment structure. Erosion and Sedimentation Best Management Practices installed and maintained. Vegetative growth established in previously disturbed areas.

For data sources see[8]