If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22689 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.825397,"lon":-79.829808,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Summit Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 154623 | |
Farm/Lease Name: PRAGER B UNIT 3H | |
License Status: | |
Spud Date: 2018-01-12 | |
Permit Date: 2017-11-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.825397 | |
Longitude: -79.829808 |
Date | Event |
---|---|
Deviated | |
2017-11-08 | New Permit Application |
2018-01-10 | Performed Spud Operation |
2018-04-22 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-19 | 2018-10-17 | 6,224 | 26,153,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 |
BIO-CLEAR 2000 | C&J Energy Services | Biocides | Listed Below | Listed Below | 0 | 0 | 0 | |
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000204 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00005800 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006181 | 0 | ||||
Water | 7732-18-5 | 85 | 0.064293 | 0 | ||||
Ammonium Sulfate | 7783-20-2 | 20 | 0.000938 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000204 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.002882 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.050978 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.010302 | 0 | ||||
Water | 7732-18-5 | 30 | 0.017294 | 0 | ||||
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega hydroxy-, branched |
127087-87-0 | 5 | 0.00006800 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 4.18933 | 0 | ||||
Water | 7732-18-5 | 28.5 | 0.005872 | 0 | ||||
CJENERGY-Buffering Agent-45 | Proprietary | 17 | 0.004119 | 0 | ||||
Sodium Acetate Anhydrous | 127-09-3 | 3 | 0.001729 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001133 | 0 | ||||
Urea | 57-13-6 | 5 | 0.000234 | 0 | ||||
CJENERGY-Anionic Polymer-44 | Proprietary | 5 | 0.000234 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00003400 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001568 | 0 | ||||
Acrylamide as residual | 79-06-1 | 9.9 | 0.000464 | 0 | ||||
Water | 7732-18-5 | 96 | 0.018126 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000545 | 0 | ||||
Acrylamide as residual | 79-06-1 | 0.1 | 0.00002400 | 0 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 30 | 0.017294 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000204 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 30 | 0.007268 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.000189 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.011346 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00282 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.046129 | 0 | ||||
CJENERGY-Surfactant-46 | Proprietary | 3 | 0.000727 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00282 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.017252 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00006800 | 0 | ||||
Alcohols, C12-15-branched and linear, ethoxylated propoxylated |
120313-48-6 | 2 | 0.001153 | 0 | ||||
Tar Bases, Quinoline Derivs. | 68513-87-1 | 1 | 0.00001400 | 0 | ||||
Ethoxylated Sorbitan Monooleate | 9005-65-6 | 1 | 0.000576 | 0 | ||||
Sodium Sulfate | 7757-82-6 | 1 | 0.00004700 | 0 | ||||
Anionic Polyacrylamide | 38193-60-1 | 30 | 0.007268 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000378 | 0 | ||||
Water | 7732-18-5 | 100 | 0.00469 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 35 | 0.020177 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000378 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.031024 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00003400 | 0 | ||||
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat e |
108818-88-8 | 2 | 0.001153 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.62873 | 0 | ||||
CJENERGY-Emulsifier-47 | Proprietary | 1 | 0.000242 | 0 | ||||
Water | 7732-18-5 | 60 | 0.014536 | 0 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00003400 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.004194 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.81756 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.56679 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.004194 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000273 | 0 | ||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.001211 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001568 | 0 | ||||
CJENERGY-Polymer-43 | Proprietary | 30 | 0.001407 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 2 | 0.001153 | 0 | ||||
Water | 7732-18-5 | 30 | 0.000409 | 0 | ||||
HC-7.5 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 90.535 | 0 | |
FR-27 PA Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 | |
CI-3 | C&J Energy Services | Acid Corrosion Inhibitors | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-28 PA-Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-15 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-16 | C&J Energy Services | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SI-6 PA-Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 976,555.35 | 331 | 0.00 | 0 | 96.73 | 331 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | XTO ENERGY INC | Synthetic Liner Materials | 17.36 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Drilling Fluid Waste | 600.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 6,885.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Drill Cuttings | 1,386.83 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 28.46 Tons | LANDFILL | 100434 |
2018 | XTO ENERGY INC | Waste Water Treatment Sludge | 51.45 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 155.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 9,777.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 6,717.76 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 8,887.96 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 20,977.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2679224 | Primary Facility | 2018-01-08 | Administrative/File Review | No Violations Noted | |
2681933 | Primary Facility | 2018-01-12 | Drilling/Alteration | No Violations Noted | Cellars where drilled and installed but where not cemented in place. Due to heavy rains cellars needed pumped out and repositioned before cementing in place. Conductor pipe is on site and 42' will be installed when cellars are ready. |
2684571 | Primary Facility | 2018-01-22 | Administrative/File Review | No Violations Noted | |
2684610 | Primary Facility | 2018-01-22 | Administrative/File Review | No Violations Noted | |
2687340 | Primary Facility | 2018-01-17 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well has been spud. 24" conductor was set to 42'. Appalachian Drillers are now onsite setting up equipment to start drilling top hole section of the well. Containment is laid out. Man camps are set up and drill pipe is arriving on location. |
2687364 | Primary Facility | 2018-01-22 | Drilling/Alteration | No Violations Noted | At the time of inspection, Appalachian Drillers 1 was waiting on cement.Surface casing was cemented using 545 sxs Class A (118 bbls), 2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displaced with 100 bbls water. Did not bump, floats held. 20 bbls returned to surface. A float shoe and float collar were used with 6 centralizers. A basket was used at 199'. The basket was used because a large seam of coal was noted from 230-236' and operator did not want to have an issue if circulation was lost.
Intermediate casing was cemented using 675 sxs Class A (147 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 150 bbls water. Plug landed and floats held. 25 bbls returned to surface. A float shoe and float collar were used along with 16 centralizers. |
2696961 | Primary Facility | 2018-02-22 | Routine/Partial Inspection | No Violations Noted | On 2/22/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Secondary containment setup around two recently top-holed wells. Erosion and Sedimentation Best Management Practices installed and maintained. Disturbed areas seeded and mulched. Site sign and access road maintained. |
2718430 | Primary Facility | 2018-04-16 | Administrative/File Review | No Violations Noted | |
2720235 | Primary Facility | 2018-04-19 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 579 was broke down and being worked on. Rig had made it to the landing point. Pipe racks were being set up and some 5 1/2" was waiting to be unloaded from a truck. Chemicals and fuel were all on containment. BOP had been tested on 4/15 and held. |
2721151 | Primary Facility | 2018-04-23 | Administrative/File Review | No Violations Noted | |
2724221 | Primary Facility | 2018-04-24 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Patterson 579 was waiting on cement. Production casing was cemented using a lead of 390 sxs 35:65 Poz Class H (77 bbls), 15.2 ppg, 1.1 yield and tail of 1860 sxs 35% Acid Soluble Class H (519 bbls), 15.6 ppg, 1.57 yield. This was displaced with 373 bbls water. Plug landed on the latch collar. Floats held. Top of cement was calculated at 4750'. |
2734844 | Primary Facility | 2018-05-29 | Administrative/File Review | No Violations Noted | |
2741975 | Primary Facility | 2018-06-15 | Routine/Partial Inspection | No Violations Noted | On 6/15/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Two wells drilled. Erosion and Sedimentation Best Management Practices installed and maintained. Underdrain outlets 1, 2 and 4 repaired by adding additional rock. Initial redlines on Erosion and Sedimentation plan. Disturbed areas seeded and mulched. Vegetative growth well established. Site sign and access road maintained. |
2776557 | Primary Facility | 2018-09-18 | Routine/Partial Inspection | No Violations Noted | On 9/18/2018, WQS Brian MacQuarrie onsite meet with Bill Rice and Gary Winehart (XTO Energy). Currently stimulation activities are being conducted at the 1H (019-22687) and 3H (019-22689). Twenty three of 131 stages completed. Vegetation well established erosion and sedimentation bmp's maintained. |
2809191 | Primary Facility | 2018-12-03 | Administrative/File Review | No Violations Noted | |
2831289 | Primary Facility | 2019-01-24 | Routine/Partial Inspection | No Violations Noted | On 1/24/2019, WQS Brian MacQuarrie onsite. Two wells recently completed; 1H-019-22687 and 3H-019-22689. Crew onsite finishing up installing production equipment. Post Drilling Well Site Restoration Report submitted by operator on 1/08/2019. Erosion and Sedimentation BMPs installed and maintained. Drilling equipment removed from site. |
2844000 | Primary Facility | 2019-02-25 | Routine/Partial Inspection | No Violations Noted | On 2/25/2019, WQS Brian MacQuarrie onsite. Meet with Bill Rice (XTO Energy) well tender. Two wells, 1H (019-22687) and 2H (019-22689), recently placed into production. Tank battery consists of three 400 bbl tanks (one tank for condensate and two for production fluids), installed within secondary containment structure. Erosion and Sedimentation Best Management Practices installed and maintained. Vegetative growth established in previously disturbed areas. |
For data sources see[8]