If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-20593 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.655312,"lon":-78.819385,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Barr Township | |
Operator Name: VEC ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: FLORENCE GAIDA 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1985-11-05 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.655312 | |
Longitude: -78.819385 |
Date | Event |
---|---|
1985-11-05 | New Permit Application |
1985-11-08 | Performed Spud Operation |
1985-11-14 | Drilling Completion |
1985-11-19 | Perforation |
1986-03-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1994 | VICTORY DEV CO | 704.00 | 208 | 0.00 | 0 | 0.00 | 0 |
1996 | VICTORY ENERGY CORP | 870 | 278 | 0.00 | 0 | 0.00 | 0 |
1997 | VICTORY ENERGY CORP | 632 | 257 | 0.00 | 0 | 0.00 | 0 |
1998 | VICTORY ENERGY CORP | 1008 | 261 | 0.00 | 0 | 0.00 | 0 |
1999 | VICTORY ENERGY CORP | 230 | 300 | 0.00 | 0 | 0.00 | 0 |
2001 | VICTORY ENERGY CORP | 3004 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | VICTORY ENERGY CORP | 87.32 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | VICTORY ENERGY CORP | 253.83 | 330 | 0.00 | 0 | 0.00 | 0 |
2004 | VICTORY ENERGY CORP | 295.65 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | VICTORY ENERGY CORP | 237.99 | 200 | 0.00 | 0 | 0.00 | 0 |
2006 | VICTORY ENERGY CORP | 104.00 | 254 | 0.00 | 0 | 0.00 | 0 |
2007 | VICTORY ENERGY CORP | 268 | 321 | 0.00 | 0 | 0.00 | 0 |
2008 | VICTORY ENERGY CORP | 439.00 | 306 | 0.00 | 0 | 0.00 | 0 |
2009 | VICTORY ENERGY CORP | 541.75 | 276 | 0.00 | 0 | 0.00 | 0 |
2010 | VICTORY ENERGY CORP | 472.9 | 313 | 0.00 | 0 | 0.00 | 0 |
2011 | VICTORY ENERGY CORP | 364.65 | 301 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 148.00 | 124 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 118.4 | 124 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 117.84 | 105 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 94.04 | 318 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 99.79 | 325 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 71.89 | 323 | 0.00 | 0 | 0.00 | 0 |
2018 | VEC ENERGY LLC | 67.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | VEC ENERGY LLC | 80.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1996 | VICTORY ENERGY CORP | Brine | 170.00 Bbl | Other | UNK |
1998 | VICTORY ENERGY CORP | Brine | 155.00 Bbl | Other | UNK |
2009 | VICTORY ENERGY CORP | Brine | 90.00 Bbl | Road Spreading |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2369593 | Primary Facility | 2015-05-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection well tag present and legible. Brine tank appears structurally sound, however, Department recommends Operator continue to maintain tank to ensure structural integrity of tank. Site appears permanently stabilized, however, Department recommends Operator continue to maintain access road to avoid any E&S issues. |
For data sources see[7]