If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-21167 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Jackson Township | |
Operator Name: EQUITRANS LP | |
Well Pad ID: | |
Farm/Lease Name: READE 6 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-22 | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.409658 | |
Longitude: -78.952583 |
Date | Event |
---|---|
2010-09-22 | New Permit Application |
2010-09-30 | Performed Spud Operation |
2010-10-29 | Drilling Completion |
2011-11-16 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EQUITRANS LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EQUITRANS LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EQUITRANS LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EQUITRANS LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | EQUITRANS LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PEOPLES NATURAL GAS CO LLC | Drill Cuttings | 791.67 Tons | LANDFILL | 101534 |
2011 | PEOPLES NATURAL GAS CO LLC | Fracing Fluid Waste | 561.11 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 7.68 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | OH0987034667 |
2011 | PEOPLES NATURAL GAS CO LLC | Drilling Fluid Waste | 6,200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 812.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 0.75 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101532 |
2012 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 741.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 0.36 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | OH0987034667 |
2012 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 5.36 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | OHD 066060609 |
2013 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 575.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2013 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 575 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2013 | PEOPLES NATURAL GAS CO LLC | Produced Fluid | 10.34 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | OH0987034667 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1917370 | Primary Facility | 2010-10-04 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Mark Shoemaker present and reviewed site status with DEP. Union started on 10/2/10 and ran 20¿ conductor to 44 ft. with 34 sks of Class A. Union was setting up to drill 17 ½¿ to roughly 120 ft. and set upper zone conductor to prevent upper rock stability. Double filter fence (sock and filter fence) was installed. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. Cuttings flow to a rubber pad that is located in the pit along with a diffuser fitting at the end of line. No freeboard issues. |
1917375 | Primary Facility | 2010-09-29 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Mark Shoemaker will be company man for PNG. Union was moving in equipment. Double filter fence (sock and filter fence) was installed. Access road was in the process of completed. PNG will go with 24¿ conductor pipe to about 50 ft . Change to 13 3/8¿ to 120 ft. Each pipe will be cemented. Spud called for 9/30/10. PNG supplied DEP with a drilling plan for the proposed storage well. |
1917650 | Primary Facility | 2010-10-01 | Routine/Complete Inspection | No Violations Noted | During this inspection, rig currently setting up for drilling operation. Well re-permited due to deviation in drilling. Site properly signed (new permit no) with E&S plan onsite. Access road entrance muddy, recommend operator add additional rock to entrance. Bmp¿s were installed down gradient, noted that filter fence was improperly placed before brush/grub; therefore, operator chose to place compost filter sox below brush/grub line. Well pad very muddy, again recommend operator rock in order to prevent a possible pollution event and/or accident. Pit lined, liner properly secured (edges backfilled) but noted that liner was not smooth, and slopes may be over 2:1. Recommend that operator/drilling closely monitor pit freeboard levels on ALL SIDES OF PIT. Accompanied by WQS Dana Burk. |
1917652 | Primary Facility | 2010-10-04 | Routine/Complete Inspection | No Violations Noted | During this inspection, rig onsite drilling. Site properly signed with ES plan. No accelerated erosion or sedimentation issues noted with access road or well site, appears all bmp¿s functioning properly. Noted that pad had been adequately rocked to reduce mud. Spoke with driller Mark Shoemaker (Union Drilling) about possible concerns with pit. Diffuser placed on drill pipe and an additional piece of rubber matting placed directly below pipe in pit. Driller has plans to hose down any cuttings that accumulate on cutslope side of pit into pit in order to ensure freeboard is maintained. No freeboard issues noted during this inspection. Recommend that operator continue to closely monitor pit freeboard levels and all bmps. No IW issues were noted. Accompanied by WQS Greg Higgins and Marc Maestra. |
1918935 | Primary Facility | 2010-10-08 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Mark Shoemaker present and reviewed site status with DEP. Union started on 10/2/10 and ran 20¿ conductor to 44 ft. with 34 sks of Class A. Union drilled 17 ½¿ hole and set 13 3/8¿ pipe to 123 ft with 105 sks of Class A and 5 bbl return. Union drilled to 1666 ft. and set 9 5/8¿ pipe and used 480 sks Class A with 22 bbl return. Plug down at 03:30 hrs on 10/8/10 and started up at 11:30 hrs. Union was cutting pipe to set BOP and converting to mud drilling. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. No freeboard issues. Met with PNG representative Paul Sekinger and inspected site. PNG is going to re-establish access road to pit in order to start removing water from pit located on southern portion of pad. DEP request to add access road to E&S pad |
1920349 | Primary Facility | 2010-10-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Mark Shoemaker present and reviewed site status with DEP. Union started on 10/2/10 and ran 20¿ conductor to 44 ft. with 34 sks of Class A. Union drilled 17 ½¿ hole and set 13 3/8¿ pipe to 123 ft with 105 sks of Class A and 5 bbl return. Union drilled to 1666 ft. and set 9 5/8¿ pipe and used 480 sks Class A with 22 bbl return. BOP present and converted to mud drilling using 10 ppg of mud. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. No freeboard issues. Current depth at 6,060 ft. Anticipated depth of Orskinany is 7515 ft based on Reade 4. |
1920412 | Primary Facility | 2010-10-12 | Routine/Complete Inspection | No Violations Noted | During this inspection, well was actively being drilled. Site sign with ES plan present. Spoke with driller about monitoring pit freeboard levels, as it appears they currently exhibit 3-4ft of lined freeboard. He sated that today was last day for air drilling; therefore, amount of materials going into pit should decrease, but he will continue to monitor and pump if necessary. No accelerated erosion or sedimentation issues were noted in relation to site or access road. Bmp¿s are installed and functioning down gradient of pad and along access road. Pad and access road entrance adequately rocked. No IW issues were noted. Plans are to conduct a site inspection on Oct 19, 2010 with engineer Paul Sekinger of PNG. |
1921673 | Primary Facility | 2010-10-22 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Jason (Company man) present and reviewed site status with DEP. Union current depth at 7900 ft. and set 7¿ pipe and was currently cementing in pipe using Halliburton. Mud was increased to 10.7 ppg. Prior to setting pipe, hole was logged via neutron log and determined to increase depth for 300 ft. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. No freeboard issues. |
1922803 | Primary Facility | 2010-10-19 | Routine/Complete Inspection | No Violations Noted | During this inspection, Met with PNG Rep Paul Sekinger. Site properly signed with ES plan. No accelerated erosion or sedimentation issues were noted. All installed bmps properly funcitioning and continuely monitored by operator. Two foot of lined freeboard observed. Pit appears structurally sound. Paul stated that a 30mil liner used in pits.Operator has plans to dispose of all pit contents offsite to an approved location. Noted that a vegetative thru way around pits would be used to vacuum pits out, this is area is included in original area of disturbance and does not appear to require adtl bmps. Access road stable. Paul also indicated that constructed on pipeline that runs parallel to access road is anticipated to begin next week. Discussed restoration plans. It appears that operator will restore as much as possible to preexisting contours with access road and small pad left; goal is to have pits properly removed and backfilled prior to winter. It is reccomended that operator continue to monitor all bmps until final restoration activites complet |
1923105 | Primary Facility | 2010-10-27 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Mark Shoemaker (Company man) present and reviewed site status with DEP. Union current depth at 7986 ft. and was 71 ft below the Orskinany. PNG was going to go 100 ft below the Orskinany at 8040¿. 7¿ pipe set previously with 677 sks Tune lite (lead) and 162 sks Class A (tail) with 15 bbl return. Mud was increased to 12.9 ppg. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. No freeboard issues |
1927066 | Primary Facility | 2010-11-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, site signed w/ ES plan. Well drilled, not yet equipped for production Two below grade (lined) pits onsite. Cuttings and drill fluids present in pits. Recommend that operator remove pit contents prior to winter/snowfall. Site had been seeded/mulched with ~ 50% vegetative growth observed. All bmp¿s installed and functioning according to plan. No accelerated ES issues noted. Access road stable. Operator should continue to monitor all bmp¿s until final restoration is complete. |
1967703 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well sign and ES plan present. Well drilled and equipped for production. Access road and pad exhibit minor erosion concerns due to heavy recent rains and truck traffic; therefore, operator should continue to monitor/maintain all temporary BMP¿s until final site restoration has been completed, which includes ditches, sediment traps, and filter fence. Two lined below grade pits located on well site with adequate freeboard. Pits currently being pumped out by Dively¿s Trucking, operator has plans to dispose of all pit contents off site. Spoke with Paul Sekinger, of PNG on 4-21-11 onsite meeting scheduled for April 27. Department unable to locate official Well Record Completion Report; therefore, recommend that operator resubmit, as final site restoration is required by regs within 9months of completion of drilling, unless otherwise approved by the Dept. |
1970679 | Primary Facility | 2011-04-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S and IW issues. Well connected to system for injection. Well pit still has sediment and some water. PNG was removing all water. Contractor on-site was in the process of reclamation of the site. E&S controls were still in place and appear to be functioning. |
2002465 | Primary Facility | 2011-09-01 | Routine/Complete Inspection | Violation(s) Noted | At the time of inspection, well sign, ES plan present. Access road stable. WRACR indicates drilling completed on 10/29/10; therefore, 9 month restoration deadline is 7/29/11. Disturbed areas have been seeded and mulched, but NO Growth observed (appears restoration efforts were completed very recently). Accelerated erosion and sedimentation issues noted on well pad, also observed that sedimentation has occurred outside BMP¿S (see pictures). Violations are being issued for failure to restore within nine months of completion as well as failure to maintain BMPs to minimize the potential for accelerated ES. |
2009418 | Primary Facility | 2011-10-07 | Routine/Complete Inspection | No Violations Noted | injection well at 3115 psi. no site issues. |
2010436 | Primary Facility | 2011-10-06 | Compliance Evaluation | No Violations Noted | CEI inspection with Paul Sekinger, Ernie Moses from PNG as well WQS Supervisor Ed Ritzer, WQS Marc Maestra, and myself. At the time of inspection, previously eroded areas on well site appear to have been improved, bmps maintained. Area has been re-graded, seeded/mulched with observed growth, approximately 70%. Department recommends that operator re-fertilize area to ensure 70% coverage is sustained uniformly on all areas of the well site to permanently resist the potential for erosion &sedimentation. Operator has plans to leave temporary bmp¿s in place until early spring- to ensure adequate vegetative growth is sustained, upon which all temporary bmp¿s will be removed. Until then operator agrees to monitor and maintain bmp¿s to ensure proper functioning ability. Site has been seeded/mulched with approximately 70% vegetative growth. No new violations were noted during this inspection and outstanding violations appear to be rectified. Department still awaiting 30day requested operator response to notice of violation sent on 9/14/11. |
2022143 | Primary Facility | 2011-09-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | requested by the dept with PNG (Paul Sekinger) to discuss violations noted on 9-1-11 inspection¿partial follow up inspection. Present from the DEP: myself, WQS Supervisor Ed Ritzer, and WQS Marc Maestra; PNG Reps: Paul Sekinger(Consulting Engineer), Kurt Hundertmark(Manager Ops), Ernie Moses(Sr. Engineer), Joyce Dailey(Legal Counsel), and Missy Galovich(Well Tender). During this meeting, attention brought to ES controls below drill pit, as well as lack of seed and mulch along sides of fill slope of pit. Although recent heavy rains occurred, the department notified PNG 9-2-11 of ES control failures, Dept reminded operator that it is their responsibility to inspect BMPs until final restoration of site is achieved, especially after every rainfall event to ensure proper functioning ability of BMPs.Es conerns addressed, areas prev eroded replaced with seed mulch, site not yet restored to 70% growth. Bmp's will be left till spring 2012 and maintained until final restoration attained. |
2024561 | Primary Facility | 2011-12-05 | Routine/Complete Inspection | No Violations Noted | no E&S issues and well connected. |
2116093 | Primary Facility | 2012-11-15 | Routine/Complete Inspection | No Violations Noted | injection well - 2724 psi |
2218871 | Primary Facility | 2013-10-18 | Routine/Complete Inspection | No Violations Noted | injection into well. pressure at well was 3192 psi. no issues. |
2316356 | Primary Facility | 2014-10-21 | Routine/Complete Inspection | No Violations Noted | new well in storage; 3165 psig; |
2421502 | Primary Facility | 2015-10-27 | Routine/Complete Inspection | No Violations Noted | no issues. 3147 psi |
2532340 | Primary Facility | 2016-10-27 | Routine/Complete Inspection | No Violations Noted | 3157 psi. no issues |
2649738 | Primary Facility | 2017-10-19 | Routine/Complete Inspection | No Violations Noted | Well pressure. At 3140. No issues. |
2787169 | Primary Facility | 2018-10-09 | Routine/Complete Inspection | No Violations Noted | Well pressure at 3153 psi. Annulus open. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2002465 | 620115 | 09/01/2011 | 2011-09-01 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | |
2002465 | 620116 | 09/01/2011 | 2011-09-01 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
620115 | 274845 | NOV - Notice of Violation | Comply/Closed | 2011-10-06 | |||
620115 | 279364 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-01-17 | 2012-01-17 | $35,760.00 | $35,760.00 |
620116 | 274845 | NOV - Notice of Violation | Comply/Closed | 2011-10-06 | |||
620116 | 279364 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-01-17 | 2012-01-17 | $35,760.00 | $35,760.00 |
For data sources see[7]