X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-21173

Well Details

Well ID: 37-021-21173
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Hastings Borough
Operator Name: SUSQUEHANNA EXPL & PROD LLC
Well Pad ID:
Farm/Lease Name: MCMULLEN 1
License Status:
Spud Date:
Permit Date: 2011-02-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.663292
Longitude: -78.703961

For data sources see[1][2][3]

Well History

Date Event
2011-02-11 New Permit Application
2011-03-24 Performed Spud Operation
2011-04-01 Drilling Completion
2011-04-24 Perforation
2012-01-30 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SUSQUEHANNA EXPL & PROD LLC 0.00 0 0.00 0 0.00 0
2011 SUSQUEHANNA EXPL & PROD LLC 0.00 0 0.00 0 0.00 0
2012 SUSQUEHANNA EXPL & PROD LLC 0.00 0 0.00 0 0.00 0
2013 SUSQUEHANNA EXPL & PROD LLC 515.00 13 0.00 0 0.00 0
2014 SUSQUEHANNA EXPL & PROD LLC 10,855.00 365 0.00 0 0.00 0
2015 SUSQUEHANNA EXPL & PROD LLC 5,688.00 119 0.00 0 0.00 0
2016 SUSQUEHANNA EXPL & PROD LLC 4,157.00 63 0.00 0 0.00 0
2017 SUSQUEHANNA EXPL & PROD LLC 4,496.00 79 0.00 0 0.00 0
2018 SUSQUEHANNA EXPL & PROD LLC 6,775.00 215 0.00 0 0.00 0
2019 SUSQUEHANNA EXPL & PROD LLC 10,594.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SUSQUEHANNA EXPL & PROD LLC Produced Fluid 15.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 SUSQUEHANNA EXPL & PROD LLC Produced Fluid 15 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1958550 Primary Facility 2011-03-17 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign and Es plan present. Well staked, not yet spudded. Site actively under construction. Although unable to remove ES plan from ¿tube¿ due to rust. Recommend operator replace tube for ease of ES plan removal. Access road adequately rocked, although department recommends that additional rock be added to culvert outlets to prevent a possible ES concern with roadway runoff. Filter fence installed down gradient of well site, although noted that filter fabric appeared to improperly installed around stakes, operator should reinstalled filter fence according to manufacture standards to prevent a possible pollution event. Additional bmp¿s should also be installed surrounding soil pile. One below grade, unlined pit onsite, presence of in pit noted. A follow up inspection will be conducted to evaluate measure taken to reduced potental ES concerns as well as bmp¿s installation.
1963216 Primary Facility 2011-03-30 Drilling/Alteration No Violations Noted Well Id sign and E&S plan present at access road. At the time of inspection, no E&S or IW discharge issues at the site. No to little mud located on paved highway at entrance way. Pit covered with 20 mil plastic. Filter fence present on the down gradient side of site. Spud called on 3/24/11. Drilling started on 3/28/11. Conductor pipe installed to 30 ft. (20¿) pipe (sand). Whipstock (Chris) set 1st stringer (13 3/8¿) pipe to 168 ft used 135 sks of class A and plug down 9:42 pm. Current depth was 1120 ft. Stratigraphy consisted of ss, sh and coal. Water encountered at 210 and 385 ft. No freeboard issues. Superior cement
1965614 Primary Facility 2011-04-07 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign and Es plan present. According to plan operator intends to encapsulate cuttings onsite, as well as discharge top hole water in accordance with regulations. Access road stable and culverts adequately maintained. Well drilled not yet equipped for production. Present on site Paul Mony (Susquehanna Rep) and Hillsdale Construction Rep. Drill pit has been encapsulated. All bmp¿s are installed according to plan. Discussed bmp¿s and installation methods with operator. No accelerated erosion or sedimentation issues noted, nor IW issues. Operator should continue to monitor/maintain all temporary bmp¿s until final permanent restoration activities have been completed. Operator anticipates well will be fractured in 2weeks. Operator also relayed to department that Hasting Boro water supply, which is a water well, Park 1 well (~1527ft) had pre drill testing conducted and dept recommended to conducted post frac samples as well.
1977177 Primary Facility 2011-06-02 Administrative/File Review Viol(s) Noted & Immediately Corrected
2003113 Primary Facility 2011-09-02 Routine/Complete Inspection No Violations Noted At the time of this inspection, well sign and ES plan present. Access road stable. Well drilled and equipped for production, but not yet in production. Pits have been removed and previously disturbed areas have been seeded and mulched, although less than 70% vegetative growth observed. Temporary bmp¿s installed and properly functioning. No evidence of accelerated erosion or sedimentation issues noted.
2256653 Primary Facility 2014-03-24 Routine/Complete Inspection No Violations Noted Well equipped for prduction at time of inspection. Brine tank appears to be sound. Access road is in stable condition and there are no signs of E&S concerns. Well tag present.
2647535 Primary Facility 2017-10-16 Routine/Complete Inspection No Violations Noted
2713432 Primary Facility 2018-04-03 Routine/Complete Inspection No Violations Noted Well tag and emergency contact number present at the site. No issues at the site

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1977177 612442 06/02/2011 2011-06-02 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
612442 272323 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-07-05 2011-07-05 $3,000.00 $3,000.00

For data sources see[7]

References