X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-21175

Well Details

Well ID: 37-021-21175
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Adams Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149074
Farm/Lease Name: PMG RABY UNIT 3H
License Status:
Spud Date:
Permit Date: 2011-03-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.281436
Longitude: -78.690097

For data sources see[1][2][3]

Well History

Date Event
2011-03-29 New Permit Application
2011-11-11 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 287.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste 195.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2016193 Primary Facility 2011-11-01 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well marker not present. Spud called on 10/31/11. Called Chevron to request well marker placed prior to drilling activity.
2020140 Primary Facility 2011-11-17 Routine/Complete Inspection No Violations Noted At the time of inspection, well ID sign and Es plan present. Share access road stable. Rig onsite actively drilling top hole on 3h, 2h and 1H previously drilled yet not in production. Secondary containment installed beneath rig as well as tanks. Tanks located onsite appear structurally sound. Bmp's installed and functioning according to ES plan. Presviously disturbed areas appear to be seeded and muclhed with observed growth. Operator shall continue to monitor and maintain all bmp's until final/permanent restoration is achieved.
2020358 Primary Facility 2011-11-17 Drilling/Alteration No Violations Noted t the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Spud called on 10/31/11. Chevron representative was Ron Freed (Total Energy Services) and contracted Yost drilling. Conductor pipe (20¿) was set at 40 feet and was grouted in place. First water surface stringer (20¿) was set at 75 feet. This pipe was cemented by Superior with 125 sks of Class A and 1 bbls return to surface. Chevron was at 550 feet and encountered water bearing zone at 520 feet. Chevron was drilling to 600 feet and set the second water bearing stringer (13 3/8¿ pipe).
2020381 Primary Facility 2011-11-15 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Spud called on 10/31/11. Chevron representative was Ron Freed (Total Energy Services) and contracted Yost drilling. Conductor pipe (20¿) was set at 40 feet and was grouted in place. First water surface stringer (20¿) was set at 75 feet. This pipe was cemented by Superior with 125 sks of Class A and 1 bbls return to surface. As per the alternate plan, Chevron was drilling to 600 feet and set the second surface stringer (13 3/8¿ pipe).
2049818 Primary Facility 2012-03-01 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2058700 Primary Facility 2012-04-03 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2067283 Primary Facility 2012-05-01 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2093083 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2148504 Primary Facility 2013-03-07 Routine/Complete Inspection No Violations Noted On-site meeting with Chevron rep Curtis Small.
2385520 Primary Facility 2015-06-30 Routine/Complete Inspection No Violations Noted At the time of inspection, site sign present. Well head located in secure fence. As per the reviewed plan, Chevron reviewed previous cement and casing for well 1H. All cement for casing was cemented to surface. A mechanical plug was set at 8600 feet. The BOP was tested at 250 psi for 5 minutes. The remaining casing from 8600 feet was cemented to 1500 feet where it will be brought to surface on additional cement
2401211 Primary Facility 2015-07-08 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, site sign present. Well head located in secure fence. As per the reviewed plan, Chevron was plugging well 2H
2407459 Primary Facility 2015-09-04 Routine/Complete Inspection No Violations Noted Inspection conducted with Operator representative Matt Barch. At time of inspection, wells 3H, 1H, and 2H all appear plugged. Aboveground monuments installed on each well with permit numbers affixed. According to records, well spud date was 11/11/2011 and per electronic notification submitted by Operator, plugging was scheduled to commence on 6/29/2015.

For data sources see[7]

References