If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-21179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.692356,"lon":-78.618311,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Chest Township | |
Operator Name: DORSO LP | |
Well Pad ID: | |
Farm/Lease Name: STROHMIER 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-04-06 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.692356 | |
Longitude: -78.618311 |
Date | Event |
---|---|
2011-04-06 | New Permit Application |
2011-08-12 | Performed Spud Operation |
2011-08-18 | Drilling Completion |
2012-10-18 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | DORSO LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1997459 | Primary Facility | 2011-08-16 | Routine/Complete Inspection | Violation(s) Noted | Site visit was due to spud notification. Well was currently being drilled. |
1997788 | Primary Facility | 2011-08-17 | Drilling/Alteration | No Violations Noted | Well sign and E&S plan was located along access road. No E&S issues and no IW issues during inspection. First Energy was contracted to install well from Dorso. Tool pusher is Josh Detweler. Conductor pipe consisted of 13 3/8¿ (sanded) to 39 ft. Surface Protection was 7¿ to 928 ft. with 200 sks of Class A 3 % CC ½ flakes with 12 bbls return to surface. Current depth was 2730 ft. Production string (4 ½¿) anticipated depth of 3578 ft. Water recorded at 2¿ at 170 ft. No freeboard issue at the pit. |
2013846 | Primary Facility | 2011-10-20 | Compliance Evaluation | No Violations Noted | Site visit was follow-up from previous violation inspection on 8-16-11. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1997459 | 618401 | 08/16/2011 | 2011-08-16 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
618401 | 274085 | NOV - Notice of Violation | Comply/Closed | 2011-10-27 | |||
618401 | 278586 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-12-21 | 2011-12-21 | $5,400.00 | $5,400.00 |
For data sources see[6]