Well ID: 37-021-21185 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.677558,"lon":-78.4726,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Reade Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145300 | |
Farm/Lease Name: E P BENDER CC-03C 1H | |
License Status: Plugged and Abandoned | |
Spud Date: 2012-03-16 | |
Permit Date: 2012-01-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.677558 | |
Longitude: -78.4726 |
Date | Event |
---|---|
2012-01-25 | New Permit Application |
2012-03-16 | Performed Spud Operation |
2012-06-08 | Drilling Completion |
2017-07-31 | Begin Plugging |
2017-08-15 | Finished Plugging |
2018-02-14 | Deviated |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 685.00 Tons | LANDFILL | 101397 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Servicing Fluid | 1,420.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CARRIZO (MARCELLUS) LLC | Synthetic Liner Materials | 1.82 Tons | LANDFILL | 101397 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2058695 | Primary Facility | 2012-04-03 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. Site pad built and containment units are been placed around rig location. Conductor pipe was set and appeared to be cement to surface. E&S control were present along access road and site pad. |
2070120 | Primary Facility | 2012-04-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Carrizo contracted Northeast Energy. 9 5/8” pipe was set at 1440 feet. With 724 sks of Type I cement with 17 bbls of return. Currently, depth of the well was at 8, 100 ft. Well was going to be logged and Union 48 rig was contracted to do the horizontal section. |
2070121 | Primary Facility | 2012-04-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present. Carrizo contracted Northeast Energy. Conductor pipe (20”) pipe was set at 61 feet and was grouted in place. 13 3/8” pipe was set at 878 feet with 790 sks of Type I cement with 65 bbls return. Plug was down at 22:10 hrs at 4/16/12 by BJ. Currently, rig was under repair and setting up flow line. E&S control were present along access road and site pad. |
2092850 | Primary Facility | 2012-05-31 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present. Carrizo was preparing for second phase of drilling. |
2206278 | Primary Facility | 2013-09-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled but not equipped for production. Tag present. Operator is reminded to keep a copy of ESCGP, PCSM, Permit, and Disposal Plan at site entrance. During inspection, paperwork was wet and illegible. Site temporarily stabilized and BMP's maintained. No accelerated erosion observed. Operator is reminded to keep well cellar free from debris and fluids. |
2209987 | Primary Facility | 2013-09-12 | Routine/Partial Inspection | In Compliance with Policy | At time of inspection, well drilled, not yet frac'd. Cellar appears to be full of oil-based fluids. Immediately called OGI Paul Wyrwas who notified Operator representative via phone. Well-tender to be sent out to assess the situation. |
2241359 | Primary Facility | 2014-01-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well has been drilled but is not equipped for production. Cellar is snow-covered but appears to be free of fluids and debris. Cellar is surrounded by Jersey barriers.Site is covered with snow making assessment of E&S controls difficult, but there does not appear to be signs of accelerated erosion. Site ID sign is present, legible. |
2269202 | Primary Facility | 2014-05-06 | Administrative/File Review | In Compliance with Policy | Admin Inspection as a result of a report of a spill. Email notification was dated 05/05/14 although it was not received until 05/06/14. Email stated cellar overflowed with rain water and water has sheen possibly from oilg/grease. Previous inspection on 09/19/14 (#2206278) states operator was "reminded to keep well cellar free from debris and fluids and mud". Follow up field investigation will be conducted by the Department and violations may be forthcoming pending further information gathering and inspection results. |
2270954 | Primary Facility | 2014-05-07 | Incident- Response to Accident or Event | Violation(s) Noted | FUI to admin inspt 2269202 for e-mail received by WQS Mark Millward from Opr rep Gary Byron on 5/5/2014 informing Dept that oil overflowed out of cellar onto pad & was discovered "late last week".At time of inspt, cellar filled to brim w/fluids.Black staining present on gravel adj to cellar & extends past surrounding cement blocks (also stained black) as evidence of previous overflow.No clean-up efforts appear to have commenced.Well drilled, not yet frac'd.WT present.TD date was 6/8/12.Per current regs, Opr shall restore well site w/in 9 mos of completion of drilling; hence, restoration deadline was 3/8/13.Site not yet restored.Dept unable to locate on-site PPC plan.Dept unable to locate ERP.Dept unable to locate on-site E&S plan.Viols being issued for failure to properly control & dispose of residual fluids, for failure to have an ERP on-site, for failure to have a PPC plan on-site, for failure to restore well site, & for failure to have an E&S plan on-site.Add'l viols may be forthcoming upon review of ESCGP-1 as not located on-site at this time. |
2272802 | Primary Facility | 2014-05-20 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI in response to violations issued under inspt record 2270954 (enf ID 311019).At time of inspection, cellar remains filled to brim with fluids. Black staining still present on gravel adjacent to cellar and extending past surrounding cement blocks (also stained black). Staining appears darker, area of staining has increased since previous inspection on 5/7/2014 (record 2270954). Strong oil odor present. Spray can (of what appears to be WD-40) floating on fluids within cellar. |
2292287 | Primary Facility | 2014-07-29 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI in response to violations issued under inspt record 2270954 (enf ID 311019) |
2326783 | Primary Facility | 2014-12-04 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI in response to viols issued under record 2270954 (enf ID 311019).At time of inspection, cellar appears nearly empty of fluids. Black staining still present on gravel adjacent to cellar.In previous inspt (record 2292287), Dept noted small area of stained gravel adjacent to well pad entrance.Stained gravel remains.Dept recommends Opr ensures all impacted materials are properly removed and disposed of per current regs.Well drilled, not yet frac'd.Surrounded by cement blocks.WT present.Site not yet restored.AR in good condition.No E&S issues observed in relation to AR or well site.E&S plan, PPC plan, Master Containment plan, weekly inspection reports on-site.Dept still unable to locate on-site ERP plan.Violations issued under 78.55(a) and 102.4(b)8 previously corrected under inspection record 2292287.Outstanding violations continue to exist under 78.54, 78.55(5), and 3216(a).Response to violations received on 6/2/2014 via e-mail. |
2466691 | Primary Facility | 2016-03-17 | Routine/Complete Inspection | No Violations Noted | production in process. no issues |
2467237 | Primary Facility | 2016-03-10 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | FUI to violations issued under Inspection Record #2270954.PPC plan, E&S log/checklist, Master containment plan, and ESCGP-1 (expires on 10-13-16) on site. Emergency Response plan not located.No E&S issues observed on gated, shared AR. Access to well pad gated. No E&S issues observed on rocked well pad.This well is listed as ACTIVE in Dept records. At this time it does not appear that the well equipped for production. Being referred to OGI Supervisor Ed Ritzer for OGI follow up on well status.Well tag present on well head. Cement barriers around well head. No brine tank on site.Metal grate located over cellar. Minimal amount of fluid observed in cellar. Fluid appears clear and about 3" deep. Black staining on cement barrier remains;no staining observed on gravel around cellar. It appears stained gravel has been removed as observed in Inspection Record #2270954. Site not yet restored to PCSM plan located on site. Violation previously issued under 78.54 has been corrected.Outstanding violations (under 78.55(5) |
2539428 | Primary Facility | 2016-11-14 | Follow-up Inspection | In Compliance with Policy | Single well Marcellus site.
Follow up Inspection to Inspection Record #2270954. where violations issued for failure to control and dispose of residual fluids (corrected under Inspection Record#2467237), failure to have ERP on site, failure to have a PPC plan on site (corrected under Inspection Record #2292287), for failure to have E&S plan on site (corrected under Inspection Record#2292287), and for failure to restore within 9 months. At time of inspection Site ID sign, Master Containment Plan, Site Restoration Plan, PPC plan, Emergency Response Plan, ESCGP-1 and E&S inspection sheet all on site. Gate located at entrance to well pad unlocked at this time. Department observed an area of earth disturbance near sediment trap located to east of pad. It appears a 'road' was created through this area which is within the LOD. Department recommends Operator continue to monitor and maintain access road and all areas within the LOD to avoid any potential E&S issues. Site has not reached >70% uniform vegetative growth. |
2580532 | Primary Facility | 2017-03-02 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection to inspection record #2270954 where a violation was issued for failure to restore a well site within 9 months.
Previously issued violation for failure to restore has been corrected as per approval of NOT for ESX11-021-0009 (inspection record #2566529 dated 2-28-17). Included with that NOT is the Landowner Consent document stating landowner will take over site restoration responsibilities. |
2624194 | Primary Facility | 2017-08-01 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | containment pad set up and frac tank present. no rig present. |
2624239 | Primary Facility | 2017-08-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | well has 20 ft 20 inch. surface 13 3/8 inch 878 ft. intermediate 9 5/8 inch 2287 feet. all cemented to surface. TD is 8805 ft. hole is 7 7/8 inch. Hole was filled with oil base mud. BOP was being installed. |
2624250 | Primary Facility | 2017-08-04 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | BOP set on 7 inch. hole was filled with oil base mud. Attempting to remove mud to 3990 feet. to set first plug. |
2624255 | Primary Facility | 2017-08-07 | Routine/Complete Inspection | No Violations Noted | rig trippped to 4200 feet. waiting on cement pump to set plugs. |
2624260 | Primary Facility | 2017-08-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 120 bbl of oil based mud removed at disposed at RES in New Stanton. 320 bbl of fresh water delivered to site. Tripped tubing to 4972 feet. |
2624270 | Primary Facility | 2017-08-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | first plug set at 4160 feet to 4036 with 26 sacks of class A. second plug set at 3626 to 3167 ft with class A using 34 sacks. third plug set at 2966 feet to 2841 feet with 26 sacks of class A. 6 percent Gel used between plugs. Casing sleeve going to be 50 sacks from 2340 ft to 2118 ft. Brig plug set on top of that plug and well will be swabbed out. |
2626075 | Primary Facility | 2017-08-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Final inspection of plug well. Met with operator and landowner at the site. Vent pipe and plate were installed. Rig and frac tanks were removed from site. |
2626241 | Primary Facility | 2017-08-14 | Routine/Complete Inspection | No Violations Noted | Inspection conducted in response to Notice of Intent to Plug a Well received by Department on 7-27-17. At time of inspection well appears to be plugged. Contracted welders working on well head. Secondary containment liners remain on site awaiting removal. Residual waste rolloff box on site. Operator rep Kevin Blake present during inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2270954 | 695850 | 05/07/2014 | 2014-05-07 | 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan | Administrative | Additional violations issued under 78.54 for failure to properly control and dispose of residual fluids, under 78.55(5) for failure to have an ERP on-site, under 3216(a) for failure to restore well site within 9 months of completion of drilling, and under 102.4(b)8 for failure to have an E&S plan on |
2270954 | 695851 | 05/07/2014 | 2014-05-07 | OGA3216(A) - WELL SITE RESTORATIONS - GENERAL RULE - Failure to restore disturbed land surface of a well site. | Environmental Health & Safety | Additional violations issued under 78.54 for failure to properly control and dispose of residual fluids, under 78.55(5) for failure to have an ERP on-site, under 78.55(a) for failure to have a PPC plan on-site, and under 102.4(b)8 for failure to have an E&S plan on-site. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
695850 | 311019 | NOV - Notice of Violation | Comply/Closed | 2017-02-28 | |||
695851 | 311019 | NOV - Notice of Violation | Comply/Closed | 2017-02-28 |
For data sources see[7]