If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-023-20173 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.600625,"lon":-78.337325,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cameron | |
Municipality: Shippen Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 150934 | |
Farm/Lease Name: SRC WT 5040 42H 51285 | |
License Status: | |
Spud Date: 2014-07-03 | |
Permit Date: 2014-04-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.600625 | |
Longitude: -78.337325 |
Date | Event |
---|---|
2014-04-16 | New Permit Application |
2014-07-03 | Performed Spud Operation |
2014-09-11 | New Permit Application |
2014-10-18 | Drilling Completion |
2014-11-04 | New Permit Application |
2015-10-25 | Perforation |
2016-02-18 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-25 | 2015-11-04 | 5,751 | 9,865,090 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FEAC 20 | Trican | Iron Control | Acetic acid | 64-19-7 | 50 | 0.00062649 | 0 |
Citric acid | 77-92-9 | 30 | 0.00037589 | 0 | ||||
Proppant 80/100 Oklahoma | Trican | Proppant | Silica | 14808-60-7 | 100 | 0.771114 | 0 | |
LSI-20 | Trican | Scale Inhibitor | organic phosphonic acids salts | proprietary | 1 | 0.0002202 | 0 | |
methanol | 67-56-1 | 15 | 0.00330306 | 0 | ||||
Water | Seneca Resources Corp | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.6982 | 0 | |
Proppant 30/50 Ottawa | Trican | Proppant | Crystalline silica (quartz) | 14808-60-7 | 100 | 4.45605 | 0 | |
7.5% HydroChloric Acid | Trican | Acid | Hydrochloric Acid HCl | 7647-01-0 | 7.5 | 0.06175 | 0 | |
Proppant 40/70 Ottawa | Trican | Proppant | Crystalline silica (quartz) | 14808-60-7 | 100 | 4.968 | 0 | |
FR-20 | Trican | Friction Reducer | Distallates hydrotreated light | 64742-47-8 | 20 | 0.0127256 | 0 | |
polyacrylamide | 639418-26-4 | 30 | 0.0190883 | 0 | ||||
ammonium chloride | 12125-02-9 | 1 | 0.00063628 | 0 | ||||
c12-16 | 68551-12-2 | 2 | 0.00127255 | 0 | ||||
oleic acid diethanolamide | 93-83-4 | 2 | 0.00127255 | 0 | ||||
MBC 516 | Trican | Biocide | Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.3 | 0.00079366 | 0 | |
Ethanol | 64-17-5 | 2.8 | 0.00026774 | 0 | ||||
N-alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00052592 | 0 | ||||
Glutaraldehyde | 111-30-8 | 27 | 0.00258178 | 0 | ||||
AI-11 | Trican | Corrosion Inhibitor | propargyl alcohol | 107-19-7 | 1 | 0.00001770 | 0 | |
potassium iodide | 7681-11-0 | 5 | 0.00008849 | 0 | ||||
propargyl alcohol derivative | proprietary | 60 | 0.00106184 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SENECA RESOURCES CO LLC | 1,388,706.94 | 302 | 0.00 | 0 | 0.00 | 0 |
2017 | SENECA RESOURCES CO LLC | 1,073,641.56 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 821,025.73 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SENECA RESOURCES CO LLC | 662,833.89 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | SENECA RESOURCES CO LLC | Drill Cuttings | 100.00 Tons | LANDFILL | 100361 |
2014 | SENECA RESOURCES CO LLC | Drill Cuttings | 854.40 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2015 | SENECA RESOURCES CO LLC | Basic Sediment | 10.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Servicing Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Fracing Fluid Waste | 184.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Drilling Fluid Waste | 60.91 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 0.54 Tons | LANDFILL | 100361 |
2016 | SENECA RESOURCES CO LLC | Servicing Fluid | 10.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 3,182.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Servicing Fluid | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 84.19 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Fracturing Fluid Waste | 6.13 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 37,009.45 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 20,513.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 140.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 15,152.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 2,313.73 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 9,719.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 498.19 Bbl | INJECTION DISPOSAL WELL | PAS2D025BELK |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 240.91 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 95.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 79.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 5,542.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 18.18 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 96.36 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 200.00 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 210.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 42.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 13.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 1,655.00 Bbl | INJECTION DISPOSAL WELL | PAS2D025BELK |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2284119 | Primary Facility | 2014-07-02 | Routine/Complete Inspection | No Violations Noted | |
2286530 | Primary Facility | 2014-06-30 | Routine/Complete Inspection | No Violations Noted | |
2300101 | Primary Facility | 2014-08-26 | Routine/Complete Inspection | No Violations Noted | |
2308825 | Primary Facility | 2014-09-30 | Routine/Complete Inspection | No Violations Noted | |
2333255 | Primary Facility | 2015-01-05 | Routine/Complete Inspection | No Violations Noted | |
2337274 | Primary Facility | 2015-01-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection 0108pm, clear sky, 25 degrees F, light snow cover |
2337275 | Primary Facility | 2015-01-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection 0108pm, clear sky, 25 degrees F, light snow cover |
2344963 | Primary Facility | 2015-02-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection sunny sky, 30 degrees F, 20” snow cover. |
2424600 | Primary Facility | 2015-11-10 | Routine/Complete Inspection | No Violations Noted | |
2430411 | Primary Facility | 2015-12-02 | Routine/Complete Inspection | No Violations Noted | |
2436698 | Primary Facility | 2015-12-29 | Routine/Complete Inspection | No Violations Noted | |
2481626 | Primary Facility | 2016-05-03 | Routine/Complete Inspection | No Violations Noted | |
2551558 | Primary Facility | 2017-01-11 | Routine/Complete Inspection | No Violations Noted | |
2558944 | Primary Facility | 2017-02-01 | Routine/Complete Inspection | No Violations Noted | |
2621936 | Primary Facility | 2017-07-17 | Routine/Complete Inspection | No Violations Noted | |
2681270 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. The wellhead assembly all fittings and flow lines were tested for gas with a gas meter. The results of this testing was no gas was detected on the wellhead assembly or the well area. |
2733900 | Primary Facility | 2018-05-22 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production |
2830108 | Primary Facility | 2019-01-22 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well appeared to be in production. A digital gauge on the well was showing a psi (pounds per square inch) of 424. The 20" x 13" , the 13" x 9" and the 9" x 5" annulus vents are vented to surface and were tested for combustible gas. Combustible gas was detected on the 9" x 5" annulus vent with a reading of 100% LEL ( lower explosion limit) and 54% METHANE using an Altair 5x Multi Gas Meter that was calibrated on 1-16-19. No combustible gas was detected on the other annulus vents. No violations noted at this inspection. |
2833009 | Primary Facility | 2019-01-24 | Routine/Complete Inspection | No Violations Noted | Routine site inspection on January 24, 2019 at Seneca Resources Rich Valley Well Pad G (C08-G). No one was onsite during the inspection. There are 11 producing wells on this pad. Each well is connected to its own GPU. Six (400) bbl produced fluids tanks are stationed in secondary containment.
The well pad and surrounding areas were snow covered during the time of the inspection. The well pad remains the original footprint size with an extension added on the N end of the well pad (243'L x 200'W x 114'L). The pad extension area is consider a staging area. A few miscellaneous pieces of equipment where observed on the staging area. All PCSMs are in place. No violations noted. |
For data sources see[8]