If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21504 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.073923,"lon":-77.980922,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Burnside Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148765 | |
Farm/Lease Name: LITKE P-1 15H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-01-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.073923 | |
Longitude: -77.980922 |
Date | Event |
---|---|
2009-01-27 | New Permit Application |
2010-01-08 | Permit Renewal Application |
2010-03-23 | Performed Spud Operation |
2010-06-17 | Drilling Completion |
2010-09-14 | Perforation |
2012-07-23 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 317,973.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 203,311.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 164,914.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 146,174.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 133,814.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 132,941.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 127,373.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 120,714.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 113,267.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | Produced Fluid | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2010 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 200.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 9,116.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 234.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | EXCO RESOURCES PA INC | Produced Fluid | 231.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 20.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 447.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 2,307.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 223.78 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 300.60 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 351.11 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 110.21 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 461.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 2,035.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 14,069.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 1,466.88 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 332.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 27.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,926.12 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 2,268.72 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 101.87 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 3,607.17 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 3,642.15 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 3,791.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 3,783.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Other Oil & Gas Wastes | 10.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 3,903.90 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 550.90 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 3,051.20 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 3,445.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1864610 | Primary Facility | 2010-02-18 | Routine/Complete Inspection | De minimus Violations Noted | - Access road is in place, well pad has been cleared and grubbed. no major earthmoving has occurred yet. Earthmoving equipment is staged on site. |
1872614 | Primary Facility | 2010-03-24 | Drilling/Alteration | No Violations Noted | US Energy Rig #4 is currently drilling a 17 1/2" hole at 230'. |
1872623 | Primary Facility | 2010-03-24 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | -Site inspected with OGI, Travis Walker. Conductor has been set and well is currently being air drillied. |
1887371 | Primary Facility | 2010-05-26 | Drilling/Alteration | No Violations Noted | Patterson 257 is currently drilling an 8 3/4" hole vertically at 6221'. |
1892744 | Primary Facility | 2010-06-16 | Drilling/Alteration | No Violations Noted | Patterson 257 currently drilling 8 1/2" through the lateral at 13,576' |
1903123 | Primary Facility | 2010-07-28 | Routine/Partial Inspection | No Violations Noted | |
1919001 | Primary Facility | 2010-10-08 | Complaint Inspection | No Violations Noted | |
1921651 | Primary Facility | 2010-10-19 | Routine/Complete Inspection | No Violations Noted | Well completed not in production |
1929818 | Primary Facility | 2010-11-02 | Routine/Complete Inspection | No Violations Noted | |
1938744 | Primary Facility | 2010-12-16 | Routine/Complete Inspection | No Violations Noted | |
1952958 | Primary Facility | 2011-01-19 | Routine/Complete Inspection | No Violations Noted | |
1966787 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1971162 | Primary Facility | 2011-03-10 | Routine/Complete Inspection | No Violations Noted | |
1980608 | Primary Facility | 2011-04-21 | Routine/Complete Inspection | No Violations Noted | |
2001225 | Primary Facility | 2011-07-19 | Compliance Evaluation | No Violations Noted | |
2002810 | Primary Facility | 2011-07-27 | Routine/Complete Inspection | No Violations Noted | |
2009019 | Primary Facility | 2011-08-12 | Routine/Complete Inspection | No Violations Noted | |
2012602 | Primary Facility | 2011-08-17 | Routine/Complete Inspection | No Violations Noted | |
2020199 | Primary Facility | 2011-09-14 | Routine/Complete Inspection | No Violations Noted | |
2023020 | Primary Facility | 2011-09-26 | Routine/Complete Inspection | No Violations Noted | |
2065815 | Primary Facility | 2012-03-28 | Routine/Complete Inspection | No Violations Noted | |
2085853 | Primary Facility | 2012-05-25 | Routine/Complete Inspection | No Violations Noted | |
2188599 | Primary Facility | 2013-07-30 | Routine/Complete Inspection | No Violations Noted | |
2317938 | Primary Facility | 2014-10-28 | Routine/Complete Inspection | No Violations Noted | |
2555845 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | |
2573961 | Primary Facility | 2017-02-21 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconvnetional well in production. No violations noted at time of inspection. |
2686126 | Primary Facility | 2018-01-24 | Routine/Complete Inspection | No Violations Noted | The weather is 30 Deg. F and cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., Litke P-1, Well # 15H on January 24, 2018.
There are 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector. |
2692096 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | |
2705844 | Primary Facility | 2018-03-09 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at EXCO Resources LLC Litke 1 Pad on March 9, 2018.
The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. The Department recommends that the operator update both plans and place a copy onsite. There are 3 drilled and producing Marcellus wells located on the pad. All well cellars are full of frozen water and each well is properly labeled. There are (3) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Water within containment was frozen. No signs of leaks from the containment were observed. Each tank was labeled. Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues were observed. |
2741692 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at EXCO Resources LLC Litke 1 Pad on June 13, 2018.
The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. As noted in my March 2018 inspection report, the Department recommends that the operator update both plans and place a copy onsite. There are 3 drilled and producing Marcellus wells located on the pad. All well cellars are filled in with gravel and each well is properly labeled. There are (3) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Water within containment was 256 uS/cm. No signs of leaks from the containment were observed. Each tank was labeled. Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues were observed. |
2841912 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | The weather is 32 Deg. F and sunny at the time of inspection. Routine inspection of EXCO Resources PA LLC., Litke P-1 Pad, well # 15H on February 19, 2019.
This well is active and producing. Annulus vents are not visible, covered by snow. Pressure gauges haven't been installed for this well. 0% combustible gas was detected in the area immediately surrounding the well. Production processing equipment includes ¿ 4 production water tanks, 3 gas processing units; measurement equipment - orifice meter stations. No violations are noted at time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2853282 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at EXCO Resources (PA) LLC Litke Pad 1 on March 13, 2019. No one was onsite during the inspection.
There are 3 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel. There are (3) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Water within he secondary containment was frozen. No signs of leaks from the secondary containment were observed. Each tank was properly labeled. Part of the well pad has been partially restored. The restored portion of the well pad and areas surrounding it have reached 70% vegetative cover. In addition, two (3.16 MG) impoundments have been fully restored and exceed 70% uniform, perennial, vegetative cover. No E&S issues were observed. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1872623 | 583996 | 03/24/2010 | 2010-03-24 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
For data sources see[7]