If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21658 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.066331,"lon":-77.806033,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Snow Shoe Township | |
Operator Name: ANADARKO E&P ONSHORE LLC | |
Well Pad ID: 148045 | |
Farm/Lease Name: COP TRACT 231 C-1010H | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2010-09-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.066331 | |
Longitude: -77.806033 |
Date | Event |
---|---|
2010-05-19 | Drilling Completion |
2010-05-19 | Performed Spud Operation |
2010-09-29 | New Permit Application |
2012-11-16 | Drilling Completion |
2013-03-12 | FULLY PLUGGED |
2014-12-23 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1927475 | Primary Facility | 2010-10-15 | Routine/Complete Inspection | No Violations Noted | |
1950372 | Primary Facility | 2011-01-11 | Routine/Complete Inspection | No Violations Noted | |
1957085 | Primary Facility | 2011-02-14 | Routine/Complete Inspection | No Violations Noted | |
1965406 | Primary Facility | 2011-03-01 | Routine/Complete Inspection | No Violations Noted | |
1976178 | Primary Facility | 2011-03-11 | Routine/Complete Inspection | No Violations Noted | |
1991138 | Primary Facility | 2011-06-07 | Routine/Complete Inspection | No Violations Noted | |
2021362 | Primary Facility | 2011-09-22 | Routine/Complete Inspection | No Violations Noted | |
2492519 | Primary Facility | 2016-06-09 | Routine/Complete Inspection | No Violations Noted | |
2685637 | Primary Facility | 2018-01-11 | Routine/Complete Inspection | No Violations Noted | Routine site inspection of (Alta) ARD Operating LLC COP Tract 231 Pad C on January 11, 2018. Anadarko Marcellus Midstream was the previous owner/operator for this well pad and well permits. The ESCGP (ESX09-027-0003(01)) has been transferred from Anadarko to ARD in March 2017. The six wells listed below have not been transferred from Anadarko to ARD; therefore Anadarko remains the operator.
The site sign with emergency contact information, E&S log, and emergency response plan were all located onsite. There are a total of 6 drilled Marcellus wells located on this well pad. All six well conductors have been plugged and are represented with a tagged well monument (027-21653, 027-21654, 027-21655, 027-21656, 027-21657, 027-21658). There is no production equipment onsite. The ESCGP1 has been upgraded to an ESCGP2 by the Department and has incorporated PCSMs into the plans. The infiltration berms which consist of 24" seeded compost sock have been installed. The pad remains at full built out size and has not bee |
2829768 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | Routine site inspection of (Alta) ARD Operating LLC COP Tract 231 Pad C on January 17, 2019. Anadarko Marcellus Midstream was the previous owner/operator for this well pad and well permits. The ESCGP (ESX09-027-0003(01)) has been transferred from Anadarko to ARD in March 2017. The six expired well permits listed below remain as Anadarko as the operator.
The site sign with emergency contact information, E&S log, and emergency response plan were all located onsite. There are a total of 6 drilled Marcellus wells located on this well pad. All six well conductors have been plugged and are represented with a tagged well monument (027-21653, 027-21654, 027-21655, 027-21656, 027-21657, 027-21658). There is no production equipment onsite. The ESCGP1 has been upgraded to an ESCGP2 by the Department and has incorporated PCSMs into the plans. The PCSM infiltration berms which consist of 24" seeded compost sock have been installed. The pad remains at full built out size and has not been restored. No violations note |
For data sources see[6]