X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-027-21662

Well Details

Well ID: 37-027-21662
Loading map...
Country: United States
State: Pennsylvania
County: Centre
Municipality: Snow Shoe Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149180
Farm/Lease Name: RESOURCE RECOVERY 3 3H
License Status:
Spud Date:
Permit Date: 2010-12-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.020414
Longitude: -78.056672

For data sources see[1][2][3]

Well History

Date Event
2010-12-29 New Permit Application
2011-02-14 Performed Spud Operation
2011-07-07 Drilling Completion
2011-08-22 Perforation
2012-07-23 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-09-02 2011-09-02 8,442 6,330,873

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00080000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00310000
GBW-30 Breaker Halliburton Energy Services Breaker
Hemicellulase enzyme 9012-54-8 15.00 0.00010000
Carbohydrates 95.00 0.00070000
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 13.13
WG-36 Gelling Agent Halliburton Energy Services Gel
Guar gum 9000-30-0 100.00 0.00160000
Water ARM Group Carrier/Base Fluid Water 100.00 86.70
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10
BA-40L Halliburton Energy Services Buffer Carbonic acid, dipotassium salt 584-08-7 60.00 0.01
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00700000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00230000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 289,314.00 93 0.00 0 0.00 0
2012 XPR RESOURCES LLC 587,484.30 363 0.00 0 0.00 0
2013 XPR RESOURCES LLC 333,421.21 365 0.00 0 0.00 0
2014 XPR RESOURCES LLC 254,218.15 365 0.00 0 0.00 0
2015 XPR RESOURCES LLC 201,900.53 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 167,400.14 365 0.00 0 0.00 0
2017 XPR RESOURCES LLC 135,288.37 364 0.00 0 0.00 0
2018 XPR RESOURCES LLC 132,094.00 365 0.00 0 0.00 0
2019 XPR RESOURCES LLC 74,515.00 287 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drilling Fluid Waste 5,653.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2011 XPR RESOURCES LLC Drill Cuttings 879.00 Tons LANDFILL 100419
2011 XPR RESOURCES LLC Drilling Fluid Waste 2,850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 XPR RESOURCES LLC Fracing Fluid Waste 2,524.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 331.30 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 XPR RESOURCES LLC Fracing Fluid Waste 1,360.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 24,649.06 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 1,448.01 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 XPR RESOURCES LLC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2014 XPR RESOURCES LLC Produced Fluid 1,020.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 XPR RESOURCES LLC Produced Fluid 302.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 275.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 234.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XPR RESOURCES LLC Waste comment only 0.00
2018 XPR RESOURCES LLC Produced Fluid 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 XPR RESOURCES LLC Produced Fluid 148.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XPR RESOURCES LLC Produced Fluid 42.50 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1956567 Primary Facility 2011-01-31 Routine/Complete Inspection No Violations Noted
1962217 Primary Facility 2011-02-15 Routine/Complete Inspection No Violations Noted
1963719 Primary Facility 2011-02-28 Routine/Complete Inspection No Violations Noted
1965732 Primary Facility 2011-03-04 Routine/Complete Inspection No Violations Noted
1980496 Primary Facility 2011-04-18 Routine/Complete Inspection No Violations Noted
1980657 Primary Facility 2011-04-25 Routine/Complete Inspection No Violations Noted
1981801 Primary Facility 2011-05-06 Routine/Complete Inspection No Violations Noted
1986285 Primary Facility 2011-05-12 Routine/Complete Inspection No Violations Noted
1988824 Primary Facility 2011-06-02 Routine/Complete Inspection No Violations Noted
2003964 Primary Facility 2011-07-29 Routine/Complete Inspection No Violations Noted
2005690 Primary Facility 2011-08-10 Routine/Complete Inspection No Violations Noted
2019250 Primary Facility 2011-09-06 Routine/Complete Inspection No Violations Noted
2021089 Primary Facility 2011-09-15 Routine/Complete Inspection No Violations Noted
2023582 Primary Facility 2011-09-27 Routine/Complete Inspection No Violations Noted
2024077 Primary Facility 2011-12-05 Follow-up Inspection No Violations Noted
2024164 Primary Facility 2011-09-28 Routine/Complete Inspection No Violations Noted
2026376 Primary Facility 2011-10-25 Routine/Complete Inspection No Violations Noted
2029569 Primary Facility 2011-11-01 Routine/Complete Inspection No Violations Noted
2035181 Primary Facility 2011-12-02 Routine/Complete Inspection No Violations Noted
2082368 Primary Facility 2012-05-21 Routine/Complete Inspection No Violations Noted
2145240 Primary Facility 2013-02-19 Routine/Complete Inspection No Violations Noted
2180708 Primary Facility 2013-07-02 Routine/Complete Inspection No Violations Noted
2226793 Primary Facility 2013-12-03 Routine/Complete Inspection No Violations Noted
2450449 Primary Facility 2016-02-11 Routine/Complete Inspection No Violations Noted
2647275 Primary Facility 2017-10-06 Routine/Complete Inspection No Violations Noted Routine inspection of XPR Resources LLC, Recovery Recovery Well Pad 3 on October 10, 2017. No one was onsite during my inspection. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel leads to an existing pond. The contractor applied E&S blanket along the developed channel and seed has been applied. The ditch along the access road leading to the well pad has been cleaned out. All BMPs remain in place. The pad remains at full build-out size (350'x550').

There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. A trace of water was present within the produced fluids containment with a conductivity of 300 uS/cm.

No violations noted.

2670082 Primary Facility 2017-12-12 Routine/Complete Inspection No Violations Noted The weather is 26 Deg. F and cloudy, windy at time of inspection.

Routine inspection of XPR Resources LLC, Resource Recovery 3 Pad, Well # 3H on December 12, 2017. There are 4 producing wells on this pad: (Permits: 027-21660; 027-21661; 027-21662; 027-21663). Both annuluses are open and plumbed to GPU at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Digital gauge for the production tubing reads 114 PSI and located at Gas Processing Unit. No violations noted. XPR Resources LLC Representatives - Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator and Heather Empfield, Permitting & Geologist ¿ XPR Resources. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector.

2795363 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted Routine site inspection with Heather Empfield of XPR Resources LLC at Recovery Recovery Well Pad 3 on October 17, 2018. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel is fully vegetated and leads to an existing wet pond. The ditch along the access road leading to the well pad has been cleaned out. The pad remains at full build-out size (350'x550').

There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). Each well head is properly tagged. There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. As discussed during the site inspection with Ms. Empfield, the Department recommends submitting well site restoration reports for the 4 active wells onsite via Greenport.

No violations noted.

For data sources see[8]

References