If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.020386,"lon":-78.056683,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Snow Shoe Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 149180 | |
Farm/Lease Name: RESOURCE RECOVERY 3 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.020386 | |
Longitude: -78.056683 |
Date | Event |
---|---|
2010-12-29 | New Permit Application |
2011-02-14 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-09-04 | 2011-09-04 | 8,499 | 6,406,011 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.11 | |
Water | ARM Group | Carrier/Base Fluid | Water | 100.00 | 86.15 | |||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00140000 | ||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00320000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
GBW-30 Breaker | Halliburton Energy Services | Breaker | ||||||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00010000 | |||||
Carbohydrates | 95.00 | 0.00090000 | ||||||
BE-9M | Halliburton Energy Services | Biocide | Methanol | 67-56-1 | 30.00 | 0.00700000 | ||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00230000 | |||||
BA-40L | Halliburton Energy Services | Buffer | Carbonic acid, dipotassium salt | 584-08-7 | 60.00 | 0.01 | ||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 13.67 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00090000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 194,922.00 | 92 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 695,788.10 | 354 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 436,178.15 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 332,707.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 299,813.56 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 274,926.93 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 227,517.46 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 219,862.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 154,357.00 | 288 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 13,377.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 1,100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XPR RESOURCES LLC | Drill Cuttings | 746.67 Tons | LANDFILL | 101397 |
2012 | XPR RESOURCES LLC | Produced Fluid | 285.36 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2013 | XPR RESOURCES LLC | Produced Fluid | 2,845.27 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2014 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XPR RESOURCES LLC | Produced Fluid | 420.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2015 | XPR RESOURCES LLC | Produced Fluid | 302.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 275.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 234.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2018 | XPR RESOURCES LLC | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XPR RESOURCES LLC | Produced Fluid | 148.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 42.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1956570 | Primary Facility | 2011-01-31 | Routine/Complete Inspection | No Violations Noted | |
1962227 | Primary Facility | 2011-02-15 | Routine/Complete Inspection | No Violations Noted | |
1963723 | Primary Facility | 2011-02-28 | Routine/Complete Inspection | No Violations Noted | |
1965741 | Primary Facility | 2011-03-04 | Routine/Complete Inspection | No Violations Noted | |
1980497 | Primary Facility | 2011-04-18 | Routine/Complete Inspection | No Violations Noted | |
1980660 | Primary Facility | 2011-04-25 | Routine/Complete Inspection | No Violations Noted | |
1981805 | Primary Facility | 2011-05-06 | Routine/Complete Inspection | No Violations Noted | |
1986287 | Primary Facility | 2011-05-12 | Routine/Complete Inspection | No Violations Noted | |
1988837 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | No Violations Noted | |
2003969 | Primary Facility | 2011-07-29 | Routine/Complete Inspection | No Violations Noted | |
2005695 | Primary Facility | 2011-08-10 | Routine/Complete Inspection | No Violations Noted | |
2019251 | Primary Facility | 2011-09-06 | Routine/Complete Inspection | No Violations Noted | |
2021092 | Primary Facility | 2011-09-15 | Routine/Complete Inspection | No Violations Noted | |
2023584 | Primary Facility | 2011-09-27 | Routine/Complete Inspection | No Violations Noted | |
2024078 | Primary Facility | 2011-12-05 | Follow-up Inspection | No Violations Noted | |
2024165 | Primary Facility | 2011-09-28 | Routine/Complete Inspection | No Violations Noted | |
2026416 | Primary Facility | 2011-10-25 | Routine/Complete Inspection | No Violations Noted | |
2029571 | Primary Facility | 2011-11-01 | Routine/Complete Inspection | No Violations Noted | |
2035198 | Primary Facility | 2011-12-02 | Routine/Complete Inspection | No Violations Noted | |
2082369 | Primary Facility | 2012-05-21 | Routine/Complete Inspection | No Violations Noted | |
2145241 | Primary Facility | 2013-02-19 | Routine/Complete Inspection | No Violations Noted | |
2180709 | Primary Facility | 2013-07-02 | Routine/Complete Inspection | No Violations Noted | |
2226805 | Primary Facility | 2013-12-03 | Routine/Complete Inspection | No Violations Noted | |
2450451 | Primary Facility | 2016-02-11 | Routine/Complete Inspection | No Violations Noted | |
2647296 | Primary Facility | 2017-10-06 | Routine/Complete Inspection | No Violations Noted | Routine inspection of XPR Resources LLC, Recovery Recovery Well Pad 3 on October 10, 2017. No one was onsite during my inspection. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel leads to an existing pond. The contractor applied E&S blanket along the developed channel and seed has been applied. The ditch along the access road leading to the well pad has been cleaned out. All BMPs remain in place. The pad remains at full build-out size (350'x550').
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. A trace of water was present within the produced fluids containment with a conductivity of 300 uS/cm. No violations noted. |
2670116 | Primary Facility | 2017-12-12 | Routine/Complete Inspection | No Violations Noted | The weather is 26 Deg. F and cloudy, windy at time of inspection.
Routine inspection of XPR Resources LLC, Resource Recovery 3 Pad, Well # 4H on December 12, 2017. There are 4 producing wells on this pad: (Permits: 027-21660; 027-21661; 027-21662; 027-21663). Both annuluses are open and plumbed to GPU at time of inspection. 0% combustible gas was detected at the annulus vent or in the area immediately surrounding the well. Digital gauge for the production tubing reads 129 PSI and located at Gas Processing Unit. No violations noted. XPR Resources LLC Representatives - Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator and Heather Empfield, Permitting & Geologist ¿ XPR Resources. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector. |
2795365 | Primary Facility | 2018-10-17 | Routine/Complete Inspection | No Violations Noted | Routine site inspection with Heather Empfield of XPR Resources LLC at Recovery Recovery Well Pad 3 on October 17, 2018. PCSM installation has been completed. The contractor regraded the pad allowing water to flow towards the recently installed channel along the S and W border of the pad. This developed channel is fully vegetated and leads to an existing wet pond. The ditch along the access road leading to the well pad has been cleaned out. The pad remains at full build-out size (350'x550').
There are 4 producing wells on this pad: (027-21660, 027-21661, 027-21662, 027-21663). Each well head is properly tagged. There are 2 production units onsite and (4) 400 BBL produced fluids tanks located in secondary containment. As discussed during the site inspection with Ms. Empfield, the Department recommends submitting well site restoration reports for the 4 active wells onsite via Greenport. No violations noted. |
For data sources see[8]