If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21671 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.066269,"lon":-77.904328,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Snow Shoe Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149328 | |
Farm/Lease Name: SNOW SHOE 2 8HG | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2011-02-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.066269 | |
Longitude: -77.904328 |
Date | Event |
---|---|
2011-02-01 | New Permit Application |
2011-04-29 | Performed Spud Operation |
2011-05-29 | Drilling Completion |
2011-08-11 | Perforation |
2012-07-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-14 | 2012-11-14 | 8,595 | 5,486,714 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | ||
Proppant (lbs) | Proppant | 9.23 | 10.25 | |||||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00556000 | ||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00527000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 90.77 | 100.00 | |||||
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00093000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00560000 | |||||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Carbohydrates | 95.00 | 0.00032000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00005000 | |||||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00095000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.26 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 230.00 | 77 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 466,729.35 | 218 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 407,776.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 268,590.00 | 314 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 195,662.00 | 343 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | ENERPLUS RES USA CORP | Spent Lubricant | 1,110.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301333 |
2011 | ENERPLUS RES USA CORP | Drill Cuttings | 978.46 Tons | LANDFILL | 101571 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,731.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 925.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.51 Tons | LANDFILL | 101397 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,421.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 441.05 Tons | LANDFILL | 101397 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,756.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 521.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 43.23 Tons | LANDFILL | 100434 |
2016 | LPR ENERGY LLC | Produced Fluid | 1,045.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | LPR ENERGY LLC | Produced Fluid | 1,477.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 1,135.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2017 | LPR ENERGY LLC | Produced Fluid | 1,717.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | Produced Fluid | 1,148.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | LPR ENERGY LLC | Produced Fluid | 2,277.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | LPR ENERGY LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2018 | LPR ENERGY LLC | Produced Fluid | 300.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | LPR ENERGY LLC | Produced Fluid | 203.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 1,639.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 1,023.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1954329 | Primary Facility | 2011-01-26 | Routine/Complete Inspection | No Violations Noted | |
1955575 | Primary Facility | 2011-01-28 | Routine/Complete Inspection | No Violations Noted | |
1991931 | Primary Facility | 2011-06-08 | Routine/Complete Inspection | No Violations Noted | |
2001220 | Primary Facility | 2011-07-20 | Routine/Complete Inspection | No Violations Noted | |
2003646 | Primary Facility | 2011-07-29 | Routine/Complete Inspection | No Violations Noted | |
2016674 | Primary Facility | 2011-08-23 | Routine/Complete Inspection | No Violations Noted | |
2051070 | Primary Facility | 2012-02-28 | Routine/Complete Inspection | No Violations Noted | |
2070215 | Primary Facility | 2012-04-20 | Routine/Complete Inspection | No Violations Noted | |
2070264 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | |
2070737 | Primary Facility | 2012-05-01 | Follow-up Inspection | No Violations Noted | |
2070864 | Primary Facility | 2012-05-24 | Drilling/Alteration | No Violations Noted | |
2076589 | Primary Facility | 2012-05-08 | Routine/Complete Inspection | No Violations Noted | |
2077292 | Primary Facility | 2012-05-11 | Routine/Complete Inspection | No Violations Noted | |
2082652 | Primary Facility | 2012-05-22 | Routine/Complete Inspection | No Violations Noted | |
2090682 | Primary Facility | 2012-06-22 | Routine/Complete Inspection | No Violations Noted | |
2091233 | Primary Facility | 2012-07-02 | Routine/Complete Inspection | No Violations Noted | |
2095221 | Primary Facility | 2012-08-01 | Routine/Complete Inspection | No Violations Noted | |
2099710 | Primary Facility | 2012-08-07 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | |
2099721 | Primary Facility | 2012-08-13 | Follow-up Inspection | No Violations Noted | |
2110174 | Primary Facility | 2012-10-22 | Routine/Complete Inspection | No Violations Noted | |
2112327 | Primary Facility | 2012-10-26 | Routine/Complete Inspection | No Violations Noted | |
2112391 | Primary Facility | 2012-10-31 | Routine/Complete Inspection | No Violations Noted | |
2116948 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | |
2120225 | Primary Facility | 2012-11-26 | Routine/Complete Inspection | No Violations Noted | |
2120258 | Primary Facility | 2012-11-30 | Routine/Complete Inspection | No Violations Noted | |
2122390 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2123445 | Primary Facility | 2012-12-11 | Routine/Complete Inspection | No Violations Noted | |
2126715 | Primary Facility | 2012-12-20 | Routine/Complete Inspection | No Violations Noted | |
2141386 | Primary Facility | 2013-02-19 | Routine/Complete Inspection | No Violations Noted | |
2172853 | Primary Facility | 2013-06-05 | Routine/Complete Inspection | No Violations Noted | |
2184710 | Primary Facility | 2013-07-17 | Routine/Complete Inspection | No Violations Noted | |
2221300 | Primary Facility | 2013-11-12 | Routine/Complete Inspection | No Violations Noted | |
2253296 | Primary Facility | 2014-03-11 | Routine/Complete Inspection | No Violations Noted | |
2471992 | Primary Facility | 2016-04-05 | Routine/Complete Inspection | No Violations Noted | |
2484647 | Primary Facility | 2016-05-17 | Routine/Complete Inspection | No Violations Noted | |
2501743 | Primary Facility | 2016-07-14 | Site Restoration | No Violations Noted | |
2603876 | Primary Facility | 2017-06-12 | Incident- Response to Accident or Event | Violation(s) Noted | I arrived onsite @ 10:40 hrs. with Sue Herzing, WQS for Centre County to follow up on a spill reported by LPR @ 10:45 hrs. on June 8th, 2017. Clayton Hill of LPR left a voicemail with Ms. Herzing reporting that on June 7th, a water truck was pulling produced water from the tanks on the pad, and that he must not have closed the valve on the truck. A well tender discovered the release on the morning of June 8th. The volume was later calculated by LPR to have been 27 Bbls. of produced water released to the pad surface. Bigler Boyz was contracted to perform the excavation. Ms. Herzing and I were to meet representatives of Bigler Boyz and LPR on the site. The excavation area ran from the production tank containment to approximately 40' onto the pad, and ran over to the access road, narrowing down to approximately 10' as it went approximately 70' down the left side of the access road. Spots within the excavation were marked with dots and circles in red paint. No one else was present when we first arrived, |
2678173 | Primary Facility | 2018-01-03 | Routine/Complete Inspection | No Violations Noted | Routine site inspection of LPR Energy LLC's Snow Shoe 2 Pad on January 3, 2018. No one was onsite during my inspection. The ESCGP (ESX10-027-0020(01)) covers both the freshwater impoundment (FWI) and the Marcellus well pad. During my inspection I only inspected the well pad and not the FWI. The ESCGP expired on July 10, 2017. In addition, the ESCGP has not been terminated by the Department.
There are 3 producing Marcellus wells located on this well pad. Each well is tagged with the API and well permit number. The well cellars are filled in will gravel. Connected to each well heads is a 275 gallon methanol tote stationed in secondary containment. Each well is connected to its own gas production unit (GPU). Gas from each GPU is metered before discharging into Superior Appalachian's 8" steel pipeline. In addition, there are (3) 400 BBL produced fluids tanks stationed on the well pad in modular secondary containment. Water within this containment was frozen. Previous violations in June 2017 resulting from a |
2692839 | Primary Facility | 2018-02-09 | Routine/Complete Inspection | No Violations Noted | The weather is 24 Deg. F, snowing and windy at time of inspection. Routine inspection of LPR Energy LLC., Snow Shoe 2 Pad, 8HG Well on February 9, 2018.
There are total of 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. Mechanical gauge on the production line reads pressure 1000 PSI, mechanical gauge on the annulus reads pressure ¿ 0 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. LPR Energy LLC Representative ¿ Denny Modzel, Field Operator. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector. |
2833563 | Primary Facility | 2019-01-23 | Routine/Complete Inspection | No Violations Noted | Routine site inspection of LPR Energy LLC's Snow Shoe 2 Pad on January 23, 2019. No one was onsite during my inspection. The original ESCGP (ESX10-027-0020) was issued to Enerplus Res (USA Corp on October 21, 2010 with an expiration date of October 20, 2015. A major modification was issued for this permit (ESX10-027-0020(01))to Chevron Appalachia LLC on July 12, 2012 with an expiration date of July 11, 2017. Both the original and amended permits cover both the freshwater impoundment (FWI) and the Marcellus well pad. During my inspection I only inspected the well pad. The FWI was not accessible due to snow and ice covered road. The ESCGP expired on July 10, 2017. This ESCGP has not been terminated to date by the Department.
There are 3 producing Marcellus wells located on this well pad. Each well is tagged with the API and well permit number. Connected to each well head is a 275 gallon methanol tote stationed in secondary containment. Each well is connected to its own gas production unit (GPU). Gas from ea |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2099710 | 649101 | 08/07/2012 | 2012-08-07 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | Drilling mud spilled from tank when employee inadvertently removed hose before checking toi see if valve was closed |
2603876 | 787941 | 2017-06-12 | 2017-10-25 | CSL 402(b) | Environmental Health & Safety | Release of production fluids |
2603876 | 787942 | 2017-06-12 | 2017-10-25 | SWMA 301 | Environmental Health & Safety | Release of production fluids |
2603876 | 787943 | 2017-06-12 | 2017-10-25 | 78A57(A)___ | Environmental Health & Safety | Production fluid discharged to pad. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
787941 | 358914 | NOV - Notice of Violation | 2017-10-25 | ||||
787942 | 358914 | NOV - Notice of Violation | 2017-10-25 | ||||
787943 | 358914 | NOV - Notice of Violation | 2017-10-25 |
For data sources see[8]