If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-031-23609 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.148965,"lon":-79.522436,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Clarion | |
| Municipality: Licking Township | |
| Operator Name: WINFALL ENERGY INC N V | |
| Well Pad ID: | |
| Farm/Lease Name: BARTO 5 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2002-06-11 | |
| Well Type: COMB. OIL&GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.148965 | |
| Longitude: -79.522436 |
| Date | Event |
|---|---|
| 2002-06-11 | New Permit Application |
| 2002-06-27 | Performed Spud Operation |
| 2002-07-22 | Drilling Completion |
| 2002-12-09 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2002 | WINFALL ENERGY INC N V | 200 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2003 | WINFALL ENERGY INC N V | 320 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2004 | WINFALL ENERGY INC N V | 321 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2005 | WINFALL ENERGY INC N V | 2978.14 | 365 | 22.52 | 365 | 0.00 | 0 |
| 2006 | WINFALL ENERGY INC N V | 3258.43 | 365 | 11.43 | 365 | 0.00 | 0 |
| 2007 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2008 | WINFALL ENERGY INC N V | 2,585.57 | 365 | 9.71 | 365 | 0.00 | 0 |
| 2009 | WINFALL ENERGY INC N V | 1353.00 | 265 | 0.00 | 0 | 0.00 | 0 |
| 2010 | WINFALL ENERGY INC N V | 346.71 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | WINFALL ENERGY INC N V | 546.14 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | WINFALL ENERGY INC N V | 223.14 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2013 | WINFALL ENERGY INC N V | 110.71 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | WINFALL ENERGY INC N V | 62.11 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | WINFALL ENERGY INC N V | 74.3 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2004 | WINFALL ENERGY INC N V | Brine | 0.01 Bbl | Other |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1143661 | Primary Facility | 2002-06-19 | Routine/Complete Inspection | No Violations Noted | Well site constructed well not yet drilled. |
| 1146060 | Primary Facility | 2002-06-27 | Drilling/Alteration | No Violations Noted | |
| 1149376 | Primary Facility | 2002-07-08 | Drilling/Alteration | No Violations Noted | |
| 1151559 | Primary Facility | 2002-07-18 | Routine/Complete Inspection | No Violations Noted | Site i.d. sign and E+S plan are posted on access road. A rig is on site drilling. |
| 1152906 | Primary Facility | 2002-07-18 | Drilling/Alteration | No Violations Noted |
For data sources see[7]