If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-25447 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.048719,"lon":-79.368506,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Porter Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 146135 | |
Farm/Lease Name: TRIPLE W FARMS NAIR 1M | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.048719 | |
Longitude: -79.368506 |
Date | Event |
---|---|
2010-11-22 | New Permit Application |
2011-07-05 | Performed Spud Operation |
2011-07-13 | Drilling Completion |
2011-08-03 | Perforation |
2011-12-09 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 32,698.00 | 110 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 42,116.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 26,860.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 19,420.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 16,608.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 13,773.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 11,800.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 10,831.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 9,575.00 | 343 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | SNYDER BROS INC | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2011 | SNYDER BROS INC | Produced Fluid | 112.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2015 | SNYDER BROS INC | Produced Fluid | 125.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | SNYDER BROS INC | Produced Fluid | 65.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1940891 | Primary Facility | 2011-01-04 | Routine/Complete Inspection | No Violations Noted | |
1950350 | Primary Facility | 2011-02-15 | Routine/Complete Inspection | No Violations Noted | |
1953394 | Primary Facility | 2011-02-23 | Routine/Complete Inspection | Violation(s) Noted | |
1953400 | Primary Facility | 2011-02-28 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
1953405 | Primary Facility | 2011-02-25 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
1985504 | Primary Facility | 2011-07-05 | Drilling/Alteration | No Violations Noted | |
1986451 | Primary Facility | 2011-07-07 | Drilling/Alteration | No Violations Noted | |
1986819 | Primary Facility | 2011-07-11 | Drilling/Alteration | No Violations Noted | |
1988160 | Primary Facility | 2011-07-15 | Drilling/Alteration | No Violations Noted | |
1988971 | Primary Facility | 2011-07-20 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2000119 | Primary Facility | 2011-09-01 | Routine/Complete Inspection | Violation(s) Noted | |
2001100 | Primary Facility | 2011-09-02 | Compliance Evaluation | Outstanding Violations - Viols Req'd | |
2002175 | Primary Facility | 2011-09-12 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | |
2011557 | Primary Facility | 2011-10-11 | Compliance Evaluation | No Violations Noted | |
2046425 | Primary Facility | 2012-02-14 | Routine/Complete Inspection | No Violations Noted | |
2199633 | Primary Facility | 2013-08-20 | Routine/Complete Inspection | No Violations Noted | |
2206538 | Primary Facility | 2013-09-23 | Routine/Complete Inspection | Violation(s) Noted | |
2212498 | Primary Facility | 2013-10-08 | Compliance Evaluation | No Violations Noted | |
2284518 | Primary Facility | 2014-06-27 | Routine/Complete Inspection | No Violations Noted | |
2383332 | Primary Facility | 2015-06-29 | Routine/Complete Inspection | No Violations Noted | |
2394704 | Primary Facility | 2015-07-22 | Routine/Complete Inspection | No Violations Noted | |
2854212 | Primary Facility | 2019-03-14 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well appeared to be producing. The valves were open. The well integrity was in good condition, with no signs of any leaks or spills. There did not appear to be any corrosion. The annulus was vented and a very small amount of gas was observed. The well was properly labeled and the Emergency Response sign was posted at the site entrance. There was a chart which was last changed on 2/27. The well was equipped with a line heater and 2 separators. There was also a plunger lift system hooked up. There were two 100 bbl fiberglass tanks in use as well. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1953394 | 605652 | 02/23/2011 | 2011-02-23 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.4(b)(1) |
1953394 | 605653 | 02/23/2011 | 2011-02-23 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | |
1953394 | 605654 | 02/23/2011 | 2011-02-23 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2000119 | 619610 | 09/01/2011 | 2011-09-01 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
2000119 | 619611 | 09/01/2011 | 2011-09-01 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | |
2000119 | 619612 | 09/01/2011 | 2011-09-01 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2001100 | 619608 | 09/02/2011 | 2011-09-02 | 78.62 - Improper encapsulation of waste | Administrative | |
2002175 | 620016 | 09/12/2011 | 2011-09-12 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
2002175 | 620017 | 09/12/2011 | 2011-09-12 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2206538 | 678829 | 09/23/2013 | 2013-09-23 | 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan | Administrative | 78.55(f)(4) - No Act 9 Sign |
2206538 | 678830 | 09/23/2013 | 2013-09-23 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
605652 | 274696 | NOV - Notice of Violation | Comply/Closed | 2011-10-11 | |||
605653 | 274696 | NOV - Notice of Violation | Comply/Closed | 2011-10-11 | |||
605654 | 274696 | NOV - Notice of Violation | Comply/Closed | 2011-10-11 | |||
619610 | 274697 | NOV - Notice of Violation | Comply/Closed | 2011-11-17 | |||
619611 | 274697 | NOV - Notice of Violation | Comply/Closed | 2011-11-17 | |||
619612 | 274697 | NOV - Notice of Violation | Comply/Closed | 2011-11-17 | |||
619608 | 274697 | NOV - Notice of Violation | Comply/Closed | 2011-11-17 | |||
678829 | 306373 | NOV - Notice of Violation | Comply/Closed | 2013-10-08 | |||
678830 | 306373 | NOV - Notice of Violation | Comply/Closed | 2013-10-08 |
For data sources see[7]