If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-033-25839 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.184268,"lon":-78.614817,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Clearfield | |
| Municipality: Huston Township | |
| Operator Name: DANNIC ENERGY CORP | |
| Well Pad ID: | |
| Farm/Lease Name: CHAGRIN BEL 38 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2005-06-14 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.184268 | |
| Longitude: -78.614817 |
| Date | Event |
|---|---|
| 2005-06-14 | New Permit Application |
| 2005-09-30 | Performed Spud Operation |
| 2005-10-05 | Drilling Completion |
| 2005-10-18 | Perforation |
| 2006-03-07 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2006 | MID EAST OIL CO | 2831.00 | 360 | 0.00 | 0 | 0.00 | 0 |
| 2007 | DANNIC ENERGY CORP | 1951.00 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2008 | DANNIC ENERGY CORP | 1,683.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2009 | DANNIC ENERGY CORP | 1,430.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | DANNIC ENERGY CORP | 1,271.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | DANNIC ENERGY CORP | 988.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2012 | DANNIC ENERGY CORP | 496.00 | 184 | 0.00 | 0 | 0.00 | 0 |
| 2013 | DANNIC ENERGY CORP | 851.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | DANNIC ENERGY CORP | 744.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | DANNIC ENERGY CORP | 769.4 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | DANNIC ENERGY CORP | 632.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | DANNIC ENERGY CORP | 47.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | DANNIC ENERGY CORP | 271.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | DANNIC ENERGY CORP | 309.67 | 91 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2006 | MID EAST OIL CO | Brine | 220.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2006 | MID EAST OIL CO | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
| 2013 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
| 2014 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
| 2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
| 2016 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
| 2019 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]