| Well ID: 37-033-26199 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.035125,"lon":-78.650811,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Clearfield | |
| Municipality: Bloom Township | |
| Operator Name: VEC ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: LANAGER 3 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2006-09-21 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.035125 | |
| Longitude: -78.650811 |
| Date | Event |
|---|---|
| 2006-09-21 | New Permit Application |
| 2006-12-07 | Performed Spud Operation |
| 2006-12-12 | Drilling Completion |
| 2006-12-26 | Perforation |
| 2007-08-31 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2006 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2007 | VICTORY ENERGY CORP | 2215 | 235 | 0.00 | 0 | 0.00 | 0 |
| 2008 | VICTORY ENERGY CORP | 1049.57 | 104 | 0.00 | 0 | 0.00 | 0 |
| 2009 | VICTORY ENERGY CORP | 1721.54 | 177 | 0.00 | 0 | 0.00 | 0 |
| 2010 | VICTORY ENERGY CORP | 1,893.18 | 326 | 0.00 | 0 | 0.00 | 0 |
| 2011 | VICTORY ENERGY CORP | 1,830.38 | 311 | 0.00 | 0 | 0.00 | 0 |
| 2012 | VICTORY ENERGY CORP | 1,303.14 | 249 | 0.00 | 0 | 0.00 | 0 |
| 2013 | VICTORY ENERGY CORP | 1,282.50 | 319 | 0.00 | 0 | 0.00 | 0 |
| 2014 | VICTORY ENERGY CORP | 1,189.91 | 346 | 0.00 | 0 | 0.00 | 0 |
| 2015 | VICTORY ENERGY CORP | 1,313.09 | 326 | 0.00 | 0 | 0.00 | 0 |
| 2016 | VICTORY ENERGY CORP | 1,082.43 | 351 | 0.00 | 0 | 0.00 | 0 |
| 2017 | VICTORY ENERGY CORP | 1,331.00 | 326 | 0.00 | 0 | 0.00 | 0 |
| 2018 | VEC ENERGY LLC | 708.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | VEC ENERGY LLC | 236.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2008 | VICTORY ENERGY CORP | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
| 2009 | VICTORY ENERGY CORP | Brine | 360.00 Bbl | Road Spreading | |
| 2010 | VICTORY ENERGY CORP | Produced Fluid | 100.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2010 | VICTORY ENERGY CORP | Produced Fluid | 240.00 Bbl | Road Spreading | |
| 2012 | VICTORY ENERGY CORP | Produced Fluid | 190.00 Bbl | Road Spreading | |
| 2013 | VICTORY ENERGY CORP | Produced Fluid | 100.00 Bbl | Road Spreading | |
| 2015 | VICTORY ENERGY CORP | Produced Fluid | 100.00 Bbl | Road Spreading |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2571706 | Primary Facility | 2017-03-15 | Routine/Complete Inspection | No Violations Noted | Site inspection of a conventional gas well that is identified in the Department's EFACTS database as having been spudded but not previously inspected by the Department. The Lanager #3 well was spudded on 12/7/2006. The wellhead plumbing and production configuration is essentially identical for the (3) wells on the Lanager lease inspected today.
Well API/Permit # posted on wellhead tag. Production gas is directed via a 2" line off the 4 1/2" production casing string and then sequentially through a standard production fluids separator unit, line drip, and orifice meter/chart recorder to the 2" gathering pipeline riser. A tubing string (~1") is hung inside the production casing string, and a gasoline powered pump jack is rigged to the tubing head for removal of excess downhole fluids. Pump jack unit is mounted on concrete base pads, and spotted inside a cyclone fence enclosure. Tubing fluids discharge is plumbed via 2" piping directly off the tubing head to (2) 100 bbl. poly fluids tanks, that are manif |