If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26485 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.006676,"lon":-78.783196,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Brady Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: FAWCETT 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-07-03 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.006676 | |
Longitude: -78.783196 |
Date | Event |
---|---|
2007-07-03 | New Permit Application |
2007-10-24 | Perforation |
2008-09-21 | Drilling Completion |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | DANNIC ENERGY CORP | 1109.02 | 22 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 5,928.38 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 3,460.49 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 2,480.70 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 1,460.80 | 273 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 1,438.47 | 274 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 1,048.24 | 273 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 1,009.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 1,047.11 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 1,082.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 1,105.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 801.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 631.45 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2009 | DANNIC ENERGY CORP | Produced Fluid | 321.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2009 | DANNIC ENERGY CORP | Produced Fluid | 162.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 150.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 81.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 161.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | DANNIC ENERGY CORP | Produced Fluid | 190.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2014 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 10,080.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2016 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2018 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2019 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1654466 | Primary Facility | 2007-09-19 | Complaint Inspection | Violation(s) Noted | |
1661440 | Primary Facility | 2007-09-20 | Routine/Complete Inspection | No Violations Noted | SURFACE CASING RAN, WAITING ON CEMENT. DRILL PIT EMPTIED BY VAC TRUCK. |
1661442 | Primary Facility | 2007-10-03 | Routine/Complete Inspection | No Violations Noted | WAITING TO FRAC. DRILL PIT HAD ADEQUATE FREEBOARD. |
1668441 | Primary Facility | 2007-11-14 | Routine/Complete Inspection | No Violations Noted | FRACED WELL HOOKED UP FOR PRODUCTION. IN LINE PRODUCING ON 30 DAY CHART. SITE HAS BEEN SEEDED AND MULCHED NO E&S ISSUES |
1767215 | Primary Facility | 2008-12-15 | Complaint Inspection | Violation(s) Noted | Well tag in place./ Tank sound./ Well is equipped for production./ Access road is stable./ Well site was drilled within 100 feet of a wetland greater than 1 acre in size./ There were several areas on the well site that were sparsely vegetated, as well as areas that were disturbed during the creation of the new access road./ These areas need to be seeded and mulched to ensure a minimum of 70% vegetation and to achieve final stabilization./ |
1804954 | Primary Facility | 2009-05-15 | Routine/Complete Inspection | Violation(s) Noted | Site was visited five times between 15 May 2009 and 5 June 2009 for assessment. Well is Drilled and in Production. Well site is not yet restored to 70% vegetation. E&S plan has been removed from site. Operator has been asked previously to submit and after the fact waiver in order to leave well at location. Operator was asked to allow wetland vegetation to reclaim any areas not yet vegetated |
1850894 | Primary Facility | 2009-06-25 | Routine/Complete Inspection | Violation(s) Noted | Fawcett 1 insp, seed & mulch in place, BMPs still in placewell completed prior to 11/14/07, site not restored w/in 90 days of completion, required records not submitted w/in 30 days of completion. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1654466 | 524284 | 09/19/2007 | 2007-09-19 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | |
1767215 | 555540 | 12/15/2008 | 2008-12-15 | 205B - Drilling w/in 100 ft of surface water or wetland w/o variance | Administrative | |
1804954 | 564765 | 05/15/2009 | 2009-05-15 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | |
1804954 | 564767 | 05/15/2009 | 2009-05-15 | 105NOPERMIT - Encroachment without Permit or Waiver | Environmental Health & Safety | |
1850894 | 578104 | 06/25/2009 | 2009-06-25 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | |
1850894 | 578105 | 06/25/2009 | 2009-06-25 | 212CMPLRPT - Failure to submit completion report within 30 days of completion of well | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
524284 | 225911 | NOV - Notice of Violation | Comply/Closed | 2007-10-01 | |||
555540 | 242531 | NOV - Notice of Violation | Comply/Closed | 2009-04-15 | |||
555540 | 253555 | NOV - Notice of Violation | Comply/Closed | 2010-01-22 | |||
555540 | 253783 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-01-22 | 2010-01-22 | $4,950.00 | $4,950.00 |
564765 | 253555 | NOV - Notice of Violation | Comply/Closed | 2010-01-22 | |||
564765 | 253783 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-01-22 | 2010-01-22 | $4,950.00 | $4,950.00 |
564767 | 253555 | NOV - Notice of Violation | Comply/Closed | 2010-01-22 | |||
564767 | 253783 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-01-22 | 2010-01-22 | $4,950.00 | $4,950.00 |
578104 | 253555 | NOV - Notice of Violation | Comply/Closed | 2010-01-22 | |||
578104 | 253783 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-01-22 | 2010-01-22 | $4,950.00 | $4,950.00 |
578105 | 253555 | NOV - Notice of Violation | Comply/Closed | 2010-01-22 | |||
578105 | 253783 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-01-22 | 2010-01-22 | $4,950.00 | $4,950.00 |
For data sources see[7]