If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21239 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.352417,"lon":-77.673528,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148999 | |
Farm/Lease Name: PA TRACT UNIT B 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-04-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.352417 | |
Longitude: -77.673528 |
Date | Event |
---|---|
Deviated | |
2011-04-25 | New Permit Application |
2011-10-12 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-25 | 2012-07-25 | 7,991 | 3,444,266 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Whole Product | ||||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | ||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00064000 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
Whole Product | ||||||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | ||
Whole Product | ||||||||
Other -(non hazardous) | 92.50 | 0.51 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.26 | |||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Whole Product | |||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00024000 | |||||
Other -(non hazardous) | 50.00 | 0.00024000 | ||||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Other -(non hazardous) | 40.00 | 0.00245000 | |||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00368000 | |||||
Whole Product | ||||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Whole Product | |||||
Other -(non hazardous) | 100.00 | 0.02 | ||||||
Water | Water | 7732-18-5 | 100.00 | 87.08 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 62,726.00 | 128 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 379,698.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 217,700.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 226,586.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 171,307.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 148,093.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 130,734.11 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 108,433.94 | 341 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Fracing Fluid Waste | 227.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 2,423.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 263.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 835.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 118.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 648.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 419.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 25,599.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 517.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 279.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 2,201.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 886.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,156.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2014 | XTO ENERGY INC | Produced Fluid | 138.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 592.36 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,626.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 247.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 117.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 1,177.34 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 607.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 224.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 222.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 101.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 454.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 113.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 561.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 113.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 119.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 341.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 107.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2018 | XTO ENERGY INC | Produced Fluid | 113.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Produced Fluid | 25.97 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 3.12 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 201.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 340.36 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 223.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004357 | Primary Facility | 2011-09-21 | Drilling/Alteration | No Violations Noted | |
2015984 | Primary Facility | 2011-11-02 | Incident- Response to Accident or Event | No Violations Noted | |
2058874 | Primary Facility | 2012-03-07 | Routine/Complete Inspection | No Violations Noted | |
2071587 | Primary Facility | 2012-05-29 | Routine/Complete Inspection | No Violations Noted | |
2072458 | Primary Facility | 2012-05-02 | Routine/Complete Inspection | No Violations Noted | |
2089711 | Primary Facility | 2012-08-06 | Routine/Partial Inspection | No Violations Noted | |
2093368 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2102769 | Primary Facility | 2012-09-26 | Routine/Partial Inspection | No Violations Noted | |
2106034 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2116421 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2175945 | Primary Facility | 2013-06-07 | Routine/Complete Inspection | No Violations Noted | |
2347898 | Primary Facility | 2015-02-26 | Routine/Complete Inspection | No Violations Noted | |
2423063 | Primary Facility | 2015-10-19 | Routine/Complete Inspection | Violation(s) Noted | Routine inspection on wells in production. Violation Noted. |
2516584 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2554918 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2654538 | Primary Facility | 2017-10-31 | Routine/Complete Inspection | No Violations Noted | Weather is 38 deg. F and cloudy. All 3 annulus vent had 0% combustible gas detected at the time of inspection. The water in the cellar is discolored off white. |
2810374 | Primary Facility | 2018-12-03 | Routine/Complete Inspection | No Violations Noted | On December 3, 2018, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract Unit B 2H Pad. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 2 producing wells and 1 plugged well located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 2 GPU’s and 2 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. No violations noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2423063 | 738673 | 10/19/2015 | 2015-10-19 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety | Methane found outside intermediate casing. Violation noted. |
For data sources see[8]