If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21268 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.409683,"lon":-77.621067,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148997 | |
Farm/Lease Name: PA TRACT E 1H | |
License Status: | |
Spud Date: 2011-12-01 | |
Permit Date: 2011-11-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.409683 | |
Longitude: -77.621067 |
Date | Event |
---|---|
2011-11-14 | New Permit Application |
2011-12-04 | Performed Spud Operation |
2012-04-30 | Drilling Completion |
2012-10-19 | DEVIATED |
2013-05-02 | Perforation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-08 | 2013-07-11 | 8,200 | 4,309,330 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (15%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 85 | 0.432372 | 174778 |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0763009 | 30843.1 | ||||
Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 10.2743 | 4,153,200.0 | |
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Isopropyl Alcohol | 67-63-0 | 30 | 0.000348433 | 140.847 | |
Propargyl Alcohol | 107-19-7 | 30 | 0.000348433 | 140.847 | ||||
Other -(non hazardous) | NA | 3 | 0.00003484 | 14.085 | ||||
Proprietary Component | NA | 7 | 0.00008130 | 32.864 | ||||
Short Chained glycol ether | 112-34-5 | 30 | 0.000348433 | 140.847 | ||||
Friction Reducer, WFR-3B | Nabors | Friction Reducer | Propylene glycol | 57-55-6 | 15 | 0.00644283 | 2604.39 | |
Other -(non hazardous) | NA | 15 | 0.00644283 | 2604.39 | ||||
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00214761 | 868.128 | ||||
Hydrotreated light distillates (10-30%) | 64742-47-8 | 50 | 0.0214761 | 8681.28 | ||||
Ethoxylated Alcohol Blend | NA | 15 | 0.00644283 | 2604.39 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.160405 | 64840.7 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0130058 | 5257.35 | ||||
Biocide KR-153SL | Nabors | Biocide | 2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00486687 | 1967.33 | |
Other -(non hazardous) | NA | 30 | 0.0073003 | 2951 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.0121672 | 4918.33 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.9625 | 35,961,300.0 | |
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | 2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00188959 | 763.827 | |
Anionic copolymer | NA | 15 | 0.00188959 | 763.827 | ||||
Propylene glycol | 57-55-6 | 40 | 0.00503889 | 2036.87 | ||||
Other -(non hazardous) | NA | 15 | 0.00188959 | 763.827 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 81,596.00 | 153 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 131,883.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 89,742.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 53,460.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 49,266.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 32,057.19 | 289 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 24,776.89 | 294 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 763.19 Tons | LANDFILL | 100955 |
2012 | XTO ENERGY INC | Drill Cuttings | 45.04 Tons | LANDFILL | 301626 |
2013 | XTO ENERGY INC | Produced Fluid | 301.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 2,273.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 424.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 5,322.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 800.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 201.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 261.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 4,909.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 1,232.51 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,294.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 884.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 211.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 1,971.22 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 2,410.95 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 310.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 334.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 202.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 171.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 906.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,135.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Produced Fluid | 1,000.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 232.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 281.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 106.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 46.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Produced Fluid | 991.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 96.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 5.73 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
2019 | XTO ENERGY INC | Produced Fluid | 125.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 216.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 188.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 42.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2019 | XTO ENERGY INC | Produced Fluid | 337.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 235.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044014 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | |
2067990 | Primary Facility | 2012-04-10 | Routine/Complete Inspection | No Violations Noted | |
2071575 | Primary Facility | 2012-05-29 | Drilling/Alteration | No Violations Noted | |
2092558 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | |
2098625 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | |
2106254 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2115278 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2160205 | Primary Facility | 2013-04-22 | Follow-up Inspection | No Violations Noted | |
2160322 | Primary Facility | 2013-04-04 | Routine/Complete Inspection | No Violations Noted | |
2168364 | Primary Facility | 2013-05-09 | Routine/Complete Inspection | No Violations Noted | |
2169200 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2169668 | Primary Facility | 2013-05-23 | Incident- Response to Accident or Event | No Violations Noted | |
2175705 | Primary Facility | 2013-06-17 | Routine/Complete Inspection | No Violations Noted | |
2184073 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
2196087 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | No Violations Noted | |
2202363 | Primary Facility | 2013-09-03 | Routine/Complete Inspection | No Violations Noted | |
2250596 | Primary Facility | 2014-03-05 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | |
2344063 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | |
2422233 | Primary Facility | 2015-10-15 | Routine/Complete Inspection | Violation(s) Noted | Routine inspection of wells in production. Methane detected on 9 5/8" annulus vent. Violations Noted. |
2514332 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2556667 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2721047 | Primary Facility | 2018-04-20 | Routine/Complete Inspection | No Violations Noted | The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 1H well on April 20, 2018. There are 6 wells on this pad.
Well # 1H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8¿) and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Production xmas tree top (tubing) pressure reading is 114 PSI, casing pressure is 300 PSI. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2829571 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2250596 | 690078 | 03/05/2014 | 2014-03-05 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | Release of brine fluid to the pad during transfer to a tanker for dispoasal at another location |
2422233 | 738473 | 10/15/2015 | 2015-10-15 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety | Gas discovered on 9 5/8 annulus vent. 100% Methane |
For data sources see[8]