Well ID: 37-035-21318 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.367039,"lon":-77.670522,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148996 | |
Farm/Lease Name: PA TRACT A 6H | |
License Status: | |
Spud Date: 2018-06-21 | |
Permit Date: 2018-05-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.367039 | |
Longitude: -77.670522 |
Date | Event |
---|---|
Deviated | |
2018-05-31 | New Permit Application |
2018-06-21 | Performed Spud Operation |
2019-01-03 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 1,233,188.41 | 150 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | XTO ENERGY INC | Drilling Fluid Waste | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 4.61 Tons | LANDFILL | 301358 |
2018 | XTO ENERGY INC | Drilling Fluid Waste | 522.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Drill Cuttings | 1,893.09 Tons | LANDFILL | 301358 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 3.45 Tons | LANDFILL | SWF 1032-WV0109 |
2018 | XTO ENERGY INC | Drilling Fluid Waste | 434.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Produced Fluid | 22,134.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 9.17 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 56.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 3,732.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 13.00 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Unused Fracturing Fluid Waste | 23.99 Tons | LANDFILL | 100434 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 4.36 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Produced Fluid | 8,046.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 9.17 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 7,575.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | XTO ENERGY INC | Produced Fluid | 66,175.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 76.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Drill Cuttings | 729.14 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 4.36 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Unused Fracturing Fluid Waste | 2.77 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Produced Fluid | 12,933.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 33.46 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 21.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Produced Fluid | 824.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 4.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 124.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2743813 | Primary Facility | 2018-06-20 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc PA TRACT A on June 20, 2018 with production supervisor Paul Hahn of XTO. XTO recently submitted SPUD notices to the Department for the following wells: 035-21316, 035-21317, 035-21318, 035-21319, and 035-21320.
According to Mr. Hahn, XTO is currently drilling and setting a 24" conductor, 42' in the ground for each above listed well. Once completed, a crew will be moving in to install containment and a top-hole rig will be moving onsite for drilling. The top-hole rig will first start drilling and setting casing for well 035-21320 until reaching the kickoff point (KP). Once completed, the rig will move to the next well and proceed until all 5 wells are KP. Then another rig will move onsite to perform the horizontal drilling for each well. There are currently (2) producing wells located onsite (035-21217 and 035-21218). There are (2) gas production units (GPU) and (2) 400 bbl. produced fluids tanks located in the sa |
2750671 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | The weather is 82 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on July 9, 2018.
Performed an inspection of the 24 in. conductor, depth is 40 ft. Recommended to identify this well by placing a temporary tag or posting an API number on the surface equipment. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Steven Guile, Rig Manager. |
2752157 | Primary Facility | 2018-07-12 | Routine/Complete Inspection | No Violations Noted | The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on July 12, 2018.
Performed an inspection of the 24 in. conductor, depth is 40 ft. No changes observed since previous inspection due to PA Tract A 5H well drilling in progress. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Paul Huhn, Field Superintendent. |
2773756 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc Pa Tract A well Pad on August 30, 2018.
The site sign, well permit, ESCGP maps, PPC plan, and site specific emergency response plan were onsite for review. The PPC plan was last revised in March 2017. The Department recommends updating the PPC plan if needed with the recently new wells drilled, but not yet completed onsite. The ESCGP (ESX11-035-0010) for the construction of this well pad and access road was terminated by the Department in September 2016. Two Marcellus wells are currently producing on this well pad (035-21217 & 035-21218). The following five wells recently had the tophole drilled (035-21316, 035-21317, 035-21318, 035-21319, 035-21320). Each well is covered with a metal plate. The tophole rig has moved off location. A new rig will be moving onsite in the next few weeks to drill the horizontals. Two GPUs and (1) 400 bbl produced fluids tank is located in the same secondary containment. Approximat |
2794301 | Primary Facility | 2018-10-18 | Drilling/Alteration | No Violations Noted | On October 19, 2018, Department representative Brad Kline and Sue Herzing conducted a routine site inspection at XTO Energy Inc. PA Tract 8546H. XTO company man gave us a tour around the well pad. The operator at the time of inspection was tripping out of the hole. Rig and chemicals being stored on site were in a bermed secondary containment. Rig #583 was on well number 3 of 5. Drill cuttings are being collected and combined with sawdust. The cuttings are then being screened. 2 previous wells drilled are currently shut in(035-21217 and 035-21218).
No violations noted. |
2826446 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | The weather is 35 Deg. F and cloudy at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on December 17, 2018.
Performed an inspection of the drilling site. Current depth is 5464 ft., started drilling at the depth 4335 ft. On December 16th in the morning. BOP test was performed on December 14th & 15th at 5000 psi and held 5 min. All chemical additives are placed on spill containment. Wellsite look neat and well organized. No concerns or violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative - Jerald A. Nietert, Rig Manager. |
2833878 | Primary Facility | 2019-01-30 | Routine/Complete Inspection | No Violations Noted | I arrived on-site and met safety rep Paul Morvant and company man Jerry Niedert. Patterson rig 583 was active on the site, drilling at 15458' on the 85H well. Paul accompanied me on my inspection. Due to 4-6" of snow, assessing the sitewide containment was difficult. Foam berms appeared to be in good condition, although they were slightly flattened in traffic areas. Chemical containment appeared clean and well managed, as did the cutttings backyard. |
2834612 | Primary Facility | 2019-01-15 | Drilling/Alteration | No Violations Noted | The weather is 32 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on January 15, 2019.
Performed an inspection of the drilling site. TD is 20460 ft., cleaning the hole, preparing for the production casing (5-1/2¿) cement job, that is projected to be performed on January 18, 2019. All chemical additives are placed on spill containment, cement silos are set up for upcoming cement job. Wellsite look neat and well organized. No violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative - Jerald A. Nietert, Rig Manager. |
2849607 | Primary Facility | 2019-03-06 | Routine/Complete Inspection | No Violations Noted | On March 6, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy LLC PA Tract 8546H Well. No E&S issues were observed during the time of inspection. Vegetation could not be evaluated due to snow cover. At the time of the inspection, christmas trees were being set up on the wells. There were 3 frac tanks on the well pad. Containment was being set up for the tanks. There did not appear to be any drilling mud spilled on the pad from the top down rig that was on the pad previously.
No violations noted. |
For data sources see[7]