If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21319 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.367164,"lon":-77.670486,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148996 | |
Farm/Lease Name: PA TRACT A 9H | |
License Status: | |
Spud Date: 2018-06-19 | |
Permit Date: 2018-05-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.367164 | |
Longitude: -77.670486 |
Date | Event |
---|---|
Deviated | |
2018-05-31 | New Permit Application |
2018-06-19 | Performed Spud Operation |
2018-10-22 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 1,021,783.50 | 150 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | XTO ENERGY INC | Drilling Fluid Waste | 660.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Drilling Fluid Waste | 820.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 4.61 Tons | LANDFILL | 301358 |
2018 | XTO ENERGY INC | Drill Cuttings | 2,535.02 Tons | LANDFILL | 301358 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 3.45 Tons | LANDFILL | SWF 1032-WV0109 |
2019 | XTO ENERGY INC | Produced Fluid | 11,043.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 9.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 307.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 7,593.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 13.00 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Unused Fracturing Fluid Waste | 23.97 Tons | LANDFILL | 100434 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 4.36 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Produced Fluid | 24.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 10,321.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 9.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 9,576.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | XTO ENERGY INC | Produced Fluid | 37,241.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 76.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Soil Contaminated by Oil | 4.36 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Unused Fracturing Fluid Waste | 2.77 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Produced Fluid | 14,003.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 33.46 Tons | LANDFILL | 301358 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 21.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | XTO ENERGY INC | Produced Fluid | 1,051.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 4.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 100.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2743817 | Primary Facility | 2018-06-20 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc PA TRACT A on June 20, 2018 with production supervisor Paul Hahn of XTO. XTO recently submitted SPUD notices to the Department for the following wells: 035-21316, 035-21317, 035-21318, 035-21319, and 035-21320.
According to Mr. Hahn, XTO is currently drilling and setting a 24" conductor, 42' in the ground for each above listed well. Once completed, a crew will be moving in to install containment and a top-hole rig will be moving onsite for drilling. The top-hole rig will first start drilling and setting casing for well 035-21320 until reaching the kickoff point (KP). Once completed, the rig will move to the next well and proceed until all 5 wells are KP. Then another rig will move onsite to perform the horizontal drilling for each well. There are currently (2) producing wells located onsite (035-21217 and 035-21218). There are (2) gas production units (GPU) and (2) 400 bbl. produced fluids tanks located in the sa |
2750643 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | The weather is 82 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 9H on July 9, 2018.
Performed an inspection of the 24 in. conductor, depth is 40 ft. Recommended to identify this well by placing a temporary tag or posting an API number on the surface equipment. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Steven Guile, Rig Manager. |
2752179 | Primary Facility | 2018-07-12 | Routine/Complete Inspection | No Violations Noted | The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 9H on July 12, 2018.
Performed an inspection of the 24 in. conductor, depth is 40 ft. No changes observed since previous inspection due to PA Tract A 5H well drilling in progress. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Paul Huhn, Field Superintendent. |
2762635 | Primary Facility | 2018-08-10 | Routine/Complete Inspection | No Violations Noted | The weather is 80 Deg. F and sunny at the time of inspection. Follow up inspection of XTO Energy Inc., PA Tract A Pad, well # 9H on August 10, 2018.
Performed an inspection during surface (casing size 13-3/8", OH size 17-1/2") cement job. Casing was set at 1209 ft. depth. Cement job started at 9:30 am on 08/10/2018. Cement return to the surface was 35 bbls. Reviewed Cement Lab reports for the Field Lean and the Tail blends. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Steven Guile, Rig Manager/ DSM. |
2773759 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc Pa Tract A well Pad on August 30, 2018.
The site sign, well permit, ESCGP maps, PPC plan, and site specific emergency response plan were onsite for review. The PPC plan was last revised in March 2017. The Department recommends updating the PPC plan if needed with the recently new wells drilled, but not yet completed onsite. The ESCGP (ESX11-035-0010) for the construction of this well pad and access road was terminated by the Department in September 2016. Two Marcellus wells are currently producing on this well pad (035-21217 & 035-21218). The following five wells recently had the tophole drilled (035-21316, 035-21317, 035-21318, 035-21319, 035-21320). Each well is covered with a metal plate. The tophole rig has moved off location. A new rig will be moving onsite in the next few weeks to drill the horizontals. Two GPUs and (1) 400 bbl produced fluids tank is located in the same secondary containment. Approximat |
2793101 | Primary Facility | 2018-10-10 | Drilling/Alteration | No Violations Noted | The weather is 60 Deg. F and cloudy at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 9H on October 10, 2018.
Performed an inspection of the drilling site. Drilling start depth was 4798 ft., current depth is 4950 ft., started drilling on October 10th 2018 at 11 am. BOP test performed on October 8, 2018. Currently drilling at the speed approximately 1000 ft./day. During placing production casing in the hole, will use 1 centralizer every 2 joints on the vertical section, and 1 centralizer every joint for horizontal section of the well. All chemical additives are placed on spill containment. Wellsite look neat and well organized. No concerns or violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Jerald A. Nietert, Rig Manager. |
2794304 | Primary Facility | 2018-10-18 | Drilling/Alteration | No Violations Noted | On October 19, 2018, Department representative Brad Kline and Sue Herzing conducted a routine site inspection at XTO Energy Inc. PA Tract 8546H. XTO company man gave us a tour around the well pad. The operator at the time of inspection was tripping out of the hole. Rig and chemicals being stored on site were in a bermed secondary containment. Rig #583 was on well number 3 of 5. Drill cuttings are being collected and combined with sawdust. The cuttings are then being screened. 2 previous wells drilled are currently shut in(035-21217 and 035-21218).
No violations noted. |
2800939 | Primary Facility | 2018-11-07 | Drilling/Alteration | No Violations Noted | The weather is 60 Deg. F and sunny at the time of inspection. Follow up inspection of XTO Energy Inc., PA Tract A Pad, well # 9H on November 7, 2018 after 5.5 in. production casing has been cemented in 8.75 in. (2382 to 4798 ft.), 8.5 in. (4798 to 21099 ft.) open hole on November 6, 2018 at 8:30 am. Lead and tail cement samples are soft 26 hours after cement job has been executed. All chemical additives are placed on spill containment. Wellsite look neat and well organized. No concerns or violations noted at the time of inspection.
XTO Energy INC. Representative ¿ Jerald A. Nietert, Rig Manager. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2807141 | Primary Facility | 2018-11-27 | Drilling/Alteration | No Violations Noted | On November 27, 2018, Department representative Brad Kline conducted a routine site inspection at XTO Energy Inc. PA Tract 8546H. XTO safety and environmental person Paul gave me a tour around the well pad. The operator at the time of inspection was tripping out of the hole, as they have reached total depth. Rig and chemicals being stored on site were in a bermed secondary containment. Rig #583 was on the 9H well. Drill cuttings are being collected and combined with sawdust. 2 previous wells drilled are currently shut in(035-21217 and 035-21218).
E&S controls and condition of the pad could not be evaluated due to the snow cover on the ground. No violations noted. |
2833881 | Primary Facility | 2019-01-30 | Routine/Complete Inspection | No Violations Noted | I arrived on-site and met safety rep Paul Morvant and company man Jerry Niedert. Patterson rig 583 was active on the site, drilling at 15458' on the 85H well. Paul accompanied me on my inspection. Due to 4-6" of snow, assessing the sitewide containment was difficult. Foam berms appeared to be in good condition, although they were slightly flattened in traffic areas. Chemical containment appeared clean and well managed, as did the cutttings backyard. |
2839041 | Primary Facility | 2019-02-07 | Drilling/Alteration | No Violations Noted | On February 7, 2019, Department representative Brad Kline conducted a follow up inspection at XTO Energy Inc. PA Tract 8546H. The follow up inspections is due to the condition noted in Inspection No. 2836543. A tour around the well site was given by Safety Manager Paul Morvant.
The spill containment around the drilling rig was about half rebuilt at time of inspection. There was a vacuum truck on-site sucking water from containment and around the well pad. The puddles that had a film or sheen on them in the earlier noted Inspection Report were vacuumed up or planned to be. The dry chemicals have been placed in a separate spill containment. The containment has holes in it but is being addressed. The chemical totes have been staged in another area of spill containment in a more organized manner. Field conductivity measurements were taken in various areas of the well pad. The highest reading near the drill mud return area yielded a 560 uS/cm reading. Concerns were discussed with Jerry Nietert, the company |
2849610 | Primary Facility | 2019-03-06 | Routine/Complete Inspection | No Violations Noted | On March 6, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy LLC PA Tract 8546H Well. No E&S issues were observed during the time of inspection. Vegetation could not be evaluated due to snow cover. At the time of the inspection, christmas trees were being set up on the wells. There were 3 frac tanks on the well pad. Containment was being set up for the tanks. There did not appear to be any drilling mud spilled on the pad from the top down rig that was on the pad previously.
No violations noted. |
For data sources see[7]