If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-039-23740 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.79785,"lon":-80.2318,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Crawford | |
Municipality: Cussewago Township | |
Operator Name: L & B ENERGY LLP | |
Well Pad ID: | |
Farm/Lease Name: KENNETH WHITE 3 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2000-12-27 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.797850 | |
Longitude: -80.2318 |
Date | Event |
---|---|
2000-12-27 | New Permit Application |
2001-09-25 | Performed Spud Operation |
2001-10-03 | Drilling Completion |
2001-10-15 | Perforation |
2002-02-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2001 | CEDAR VALLEY ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2002 | CEDAR VALLEY ENERGY INC | 16730 | 365 | 397 | 365 | 0.00 | 0 |
2003 | CEDAR VALLEY ENERGY INC | 12957 | 365 | 224 | 365 | 0.00 | 0 |
2004 | CEDAR VALLEY ENERGY INC | 5061 | 365 | 179.9 | 365 | 0.00 | 0 |
2005 | CEDAR VALLEY ENERGY INC | 3492 | 335 | 108.5 | 365 | 0.00 | 0 |
2006 | CEDAR VALLEY ENERGY INC | 2092.00 | 365 | 44.00 | 365 | 0.00 | 0 |
2007 | CEDAR VALLEY ENERGY INC | 1178.00 | 365 | 90 | 365 | 0.00 | 0 |
2008 | CEDAR VALLEY ENERGY INC | 1213.00 | 365 | 50.30 | 365 | 0.00 | 0 |
2009 | CEDAR VALLEY ENERGY INC | 735.00 | 365 | 43.72 | 365 | 0.00 | 0 |
2010 | CEDAR VALLEY ENERGY INC | 562.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CEDAR VALLEY ENERGY INC | 1,070.00 | 365 | 76.63 | 365 | 0.00 | 0 |
2012 | CEDAR VALLEY ENERGY INC | 724.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CEDAR VALLEY ENERGY INC | 1,471.00 | 365 | 68.22 | 365 | 0.00 | 0 |
2014 | CEDAR VALLEY ENERGY INC | 888.00 | 365 | 49.92 | 365 | 0.00 | 0 |
2015 | CEDAR VALLEY ENERGY INC | 883.00 | 365 | 75.99 | 365 | 0.00 | 0 |
2016 | L & B ENERGY LLP | 566.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | L & B ENERGY LLP | 595.00 | 365 | 52.96 | 365 | 0.00 | 0 |
2018 | L & B ENERGY LLP | 533.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | L & B ENERGY LLP | 736.00 | 365 | 60.24 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2001 | CEDAR VALLEY ENERGY INC | Brine | 38.00 Bbl | Injection Disposal Well | 374924388 |
2001 | CEDAR VALLEY ENERGY INC | Brine | 28.00 Bbl | Road Spreading | FRANKLIN TWP |
2002 | CEDAR VALLEY ENERGY INC | Brine | 42.00 Bbl | Road Spreading | |
2002 | CEDAR VALLEY ENERGY INC | Brine | 68.00 Bbl | Injection Disposal Well | PAS2D251BERI |
2003 | CEDAR VALLEY ENERGY INC | Brine | 215.00 Bbl | Other | |
2004 | CEDAR VALLEY ENERGY INC | Brine | 53.00 Bbl | Road Spreading | |
2004 | CEDAR VALLEY ENERGY INC | Brine | 31.00 Bbl | Surface Impoundment | 37-49-24388 |
2005 | CEDAR VALLEY ENERGY INC | Brine | 90.00 Bbl | Road Spreading | |
2006 | CEDAR VALLEY ENERGY INC | Brine | 45.00 Bbl | Road Spreading | |
2009 | CEDAR VALLEY ENERGY INC | Brine | 23.00 Bbl | Road Spreading | |
2010 | CEDAR VALLEY ENERGY INC | Produced Fluid | 48.00 Bbl | Road Spreading | |
2014 | CEDAR VALLEY ENERGY INC | Produced Fluid | 41.00 Bbl | Injection Disposal Well | 34-007-20919 |
2015 | CEDAR VALLEY ENERGY INC | Produced Fluid | 23.00 Bbl | Injection Disposal Well | 34-007-20919 |
2017 | L & B ENERGY LLP | Produced Fluid | 20.00 Bbl | Road Spreading | |
2018 | L & B ENERGY LLP | Produced Fluid | 22.00 Bbl | Injection Disposal Well | 34-007-24523 |
2019 | L & B ENERGY LLP | Produced Fluid | 12.00 Bbl | Injection Disposal Well | 34-007-24523 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1061754 | Primary Facility | 2001-09-19 | Routine/Complete Inspection | No Violations Noted | |
1063105 | Primary Facility | 2001-09-25 | Routine/Complete Inspection | No Violations Noted | |
1063115 | Primary Facility | 2001-09-27 | Routine/Complete Inspection | No Violations Noted | |
1064472 | Primary Facility | 2001-09-26 | Drilling/Alteration | No Violations Noted | |
1065408 | Primary Facility | 2001-10-02 | Routine/Complete Inspection | No Violations Noted | |
1065410 | Primary Facility | 2001-10-05 | Routine/Complete Inspection | No Violations Noted | |
2049526 | Primary Facility | 2012-03-09 | Routine/Complete Inspection | No Violations Noted | |
2112526 | Primary Facility | 2012-10-26 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]