If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-039-24913 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.688136,"lon":-80.133746,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Crawford | |
| Municipality: Woodcock Township | |
| Operator Name: BOBCAT WELL & PIPELINE LLC | |
| Well Pad ID: | |
| Farm/Lease Name: BETHESDA 2 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2006-10-17 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 41.688136 | |
| Longitude: -80.133746 |
| Date | Event |
|---|---|
| 2006-10-17 | New Permit Application |
| 2007-02-28 | Performed Spud Operation |
| 2007-03-06 | Drilling Completion |
| 2007-03-13 | Perforation |
| 2007-06-06 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | D & L ENERGY INC | 13902.00 | 366 | 41.00 | 365 | 0.00 | 0 |
| 2010 | D & L ENERGY INC | 7,388.70 | 365 | 46.98 | 365 | 0.00 | 0 |
| 2011 | D & L ENERGY INC | 7,165.70 | 365 | 51.16 | 365 | 0.00 | 0 |
| 2012 | D & L ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | D & L ENERGY INC | 3,694.36 | 365 | 41.26 | 365 | 0.00 | 0 |
| 2015 | BOBCAT WELL & PIPELINE LLC | 1,638.41 | 240 | 0.00 | 0 | 0.00 | 0 |
| 2016 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0 | 27.61 | 1 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2010 | D & L ENERGY INC | Produced Fluid | 196.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 |
| 2010 | D & L ENERGY INC | Produced Fluid | 67.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
| 2011 | D & L ENERGY INC | Produced Fluid | 104.00 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
| 2011 | D & L ENERGY INC | Produced Fluid | 116.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
| 2011 | D & L ENERGY INC | Produced Fluid | 109.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
| 2012 | D & L ENERGY INC | Produced Fluid | 220.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
| 2013 | D & L ENERGY INC | Produced Fluid | 12.00 Bbl | ROAD SPREADING | |
| 2013 | D & L ENERGY INC | Produced Fluid | 3.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
| 2015 | BOBCAT WELL & PIPELINE LLC | Produced Fluid | 58.00 Bbl | ROAD SPREADING | |
| 2017 | BOBCAT WELL & PIPELINE LLC | Produced Fluid | 39.00 Bbl | ROAD SPREADING |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1602807 | Primary Facility | 2007-02-27 | Compliance Evaluation | In Compliance with Schedule | |
| 1604836 | Primary Facility | 2007-03-06 | Drilling/Alteration | No Violations Noted | |
| 1612078 | Primary Facility | 2007-04-04 | Compliance Evaluation | In Compliance with Schedule | |
| 1638843 | Primary Facility | 2007-07-11 | Compliance Evaluation | In Compliance with Schedule | |
| 1910535 | Primary Facility | 2010-09-02 | Routine/Complete Inspection | No Violations Noted | |
| 1913391 | Primary Facility | 2010-09-16 | Routine/Complete Inspection | No Violations Noted | |
| 2175616 | Primary Facility | 2013-06-12 | Routine/Partial Inspection | No Violations Noted | |
| 2251798 | Primary Facility | 2014-03-07 | Routine/Complete Inspection | No Violations Noted | |
| 2426137 | Primary Facility | 2015-11-12 | Routine/Complete Inspection | No Violations Noted | |
| 2546203 | Primary Facility | 2016-12-21 | Administrative/File Review | No Violations Noted | production report review |
For data sources see[7]