If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-047-23788 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.613118,"lon":-78.930642,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Elk | |
| Municipality: Highland Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: WARRANT 3773 | |
| License Status: Plugged and Abandoned | |
| Spud Date: 2007-01-22 | |
| Permit Date: 2006-08-22 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.613118 | |
| Longitude: -78.930642 |
| Date | Event |
|---|---|
| 2006-08-22 | New Permit Application |
| 2007-01-22 | Performed Spud Operation |
| 2007-01-24 | Drilling Completion |
| 2007-03-12 | Performed Stage 1 of Stimulation |
| 2007-03-12 | Performed Stage 2 of Stimulation |
| 2007-03-12 | Performed Stage 3 of Stimulation |
| 2007-03-12 | Performed Stage 4 of Stimulation |
| 2007-03-12 | Performed Stage 5 of Stimulation |
| 2007-03-12 | Performed Stage 6 of Stimulation |
| 2007-03-12 | Performed Stage 7 of Stimulation |
| 2007-03-12 | Performed Stage 8 of Stimulation |
| 2007-03-12 | Performed Stage 9 of Stimulation |
| 2016-06-01 | Begin Plugging |
| 2016-06-13 | Finished Plugging |
| 2017-04-04 | Fully Plugged |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2007-03-12 | 1 | OTTAWA SAND | 0 | 2,000 | 0 |
| 2007-03-12 | 2 | OTTAWA SAND | 0 | 1,900 | 0 |
| 2007-03-12 | 3 | OTTAWA SAND | 0 | 2,230 | 0 |
| 2007-03-12 | 4 | OTTAWA SAND | 0 | 2,100 | 0 |
| 2007-03-12 | 5 | OTTAWA SAND | 0 | 2,140 | 0 |
| 2007-03-12 | 6 | OTTAWA SAND | 0 | 2,300 | 0 |
| 2007-03-12 | 7 | OTTAWA SAND | 0 | 2,350 | 0 |
| 2007-03-12 | 8 | OTTAWA SAND | 0 | 2,610 | 0 |
| 2007-03-12 | 9 | OTTAWA SAND | 0 | 2,560 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2007 | CATALYST ENERGY INC | 4001.00 | 365 | 2570.00 | 365 | 0.00 | 0 |
| 2008 | CATALYST ENERGY INC | 5974.00 | 365 | 1472.00 | 365 | 0.00 | 0 |
| 2009 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | CATALYST ENERGY INC | 731.5 | 365 | 79.00 | 365 | 0.00 | 0 |
| 2011 | CATALYST ENERGY INC | 717.5 | 365 | 76.75 | 365 | 0.00 | 0 |
| 2012 | CATALYST ENERGY INC | 385.00 | 366 | 39.00 | 366 | 20 | 366 |
| 2014 | CATALYST ENERGY INC | 221.4 | 270 | 34.75 | 270 | 0 | 270 |
| 2015 | CATALYST ENERGY INC | 190.25 | 182 | 0.00 | 0 | 10.31 | 182 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2008 | CATALYST ENERGY INC | Brine | 290.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0102784 |
| 2010 | CATALYST ENERGY INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2011 | CATALYST ENERGY INC | Produced Fluid | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2012 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 18.76 Bbl | STORAGE PENDING DISPOSAL OR REUSE |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1597728 | Primary Facility | 2007-01-22 | Drilling/Alteration | No Violations Noted | |
| 2466683 | Primary Facility | 2016-03-06 | Routine/Complete Inspection | No Violations Noted | |
| 2507804 | Primary Facility | 2016-08-05 | Administrative/File Review | No Violations Noted | |
| 2532655 | Primary Facility | 2016-10-21 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]