X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-047-24949

Well Details

Well ID: 37-047-24949
Loading map...
Country: United States
State: Pennsylvania
County: Elk
Municipality: Jones Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 152363
Farm/Lease Name: COP WT 2591 65H 51538
License Status: Active
Spud Date: 2015-10-17
Permit Date: 2015-07-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.564731
Longitude: -78.505781

For data sources see[1][2][3]

Well History

Date Event
2015-07-01 New Permit Application
2015-09-24 New Permit Application
2015-10-17 Performed Spud Operation
2015-11-15 Drilling Completion
2016-02-21 Perforation
2016-04-19 Perforation
2016-04-19 Performed Stage 1 of Stimulation
2016-04-20 Performed Stage 2 of Stimulation
2016-04-21 Perforation
2016-04-21 Performed Stage 3 of Stimulation
2016-04-21 Performed Stage 4 of Stimulation
2016-04-21 Performed Stage 5 of Stimulation
2016-04-22 Perforation
2016-04-22 Performed Stage 6 of Stimulation
2016-04-22 Performed Stage 7 of Stimulation
2016-04-22 Performed Stage 8 of Stimulation
2016-04-23 Perforation
2016-04-23 Performed Stage 9 of Stimulation
2016-04-25 Perforation
2016-04-25 Performed Stage 10 of Stimulation
2016-04-25 Performed Stage 11 of Stimulation
2016-04-25 Performed Stage 12 of Stimulation
2016-04-26 Perforation
2016-04-26 Performed Stage 13 of Stimulation
2016-04-26 Performed Stage 14 of Stimulation
2016-04-26 Performed Stage 15 of Stimulation
2016-04-26 Performed Stage 16 of Stimulation
2016-04-27 Perforation
2016-04-27 Performed Stage 17 of Stimulation
2016-04-27 Performed Stage 18 of Stimulation
2016-04-27 Performed Stage 19 of Stimulation
2016-04-27 Performed Stage 20 of Stimulation
2016-04-28 Perforation
2016-04-28 Performed Stage 21 of Stimulation
2016-04-28 Performed Stage 22 of Stimulation
2016-04-28 Performed Stage 23 of Stimulation
2016-04-28 Performed Stage 24 of Stimulation
2016-04-29 Perforation
2016-04-29 Performed Stage 25 of Stimulation
2016-04-29 Performed Stage 26 of Stimulation
2016-05-02 Perforation
2016-05-02 Performed Stage 27 of Stimulation
2016-05-02 Performed Stage 28 of Stimulation
2016-05-02 Performed Stage 29 of Stimulation
2016-05-03 Perforation
2016-05-03 Performed Stage 30 of Stimulation
2016-05-03 Performed Stage 31 of Stimulation
2016-05-03 Performed Stage 32 of Stimulation
2016-05-03 Performed Stage 33 of Stimulation
2016-05-03 Performed Stage 34 of Stimulation
2016-05-04 Perforation
2016-05-04 Performed Stage 35 of Stimulation
2016-05-04 Performed Stage 36 of Stimulation
2016-05-04 Performed Stage 37 of Stimulation
2016-05-04 Performed Stage 38 of Stimulation
2016-05-05 Perforation
2016-05-05 Performed Stage 39 of Stimulation
2016-05-05 Performed Stage 40 of Stimulation
2016-05-05 Performed Stage 41 of Stimulation
2016-05-06 Performed Stage 42 of Stimulation
2016-08-10 Deviated
2016-08-10 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-19 2016-05-06 6,156 9,682,810 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.8054 0
Proppant 30/50 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.59712 0
KAI-11 Keane Energy Corrosion Inhibitor Propargyl alcohol derivative proprietary 60 0.00064914 0
Potassium iodide 7681-11-0 5 0.00005410 0
Propargyl alcohol 107-19-7 1 0.00001082 0
MBC 516 Keane Energy Biocide N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00048804 0
Ethanol 64-17-5 2.8 0.00024846 0
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.0007365 0
Glutaraldehyde 111-30-8 27 0.00239583 0
7.5% HydroChloric Acid Keane Energy Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0377498 0
KSI-16 Keane Energy Scale Inhibitor Ammonia 7664-41-7 0.1 0.00001411 0
Ethylene Glycol 107-21-1 35 0.00927053 0
Proppant 80/100 Oklahoma Keane Energy Proppant Silica 14808-60-7 100 0.846672 0
KFEAC 20 Keane Energy Iron Control Citric acid 77-92-9 30 0.0002298 0
Acetic acid 64-19-7 50 0.00038299 0
KFR-20 Keane Energy Friction Reducer Distallates hydrotreated light 64742-47-8 20 0.0147629 0
Ammonium chloride 12125-02-9 1 0.00073815 0
Polyacrylamide 69418-26-4 30 0.0221444 0
Oleic acid diethanolamide 93-83-4 2 0.00147629 0
C12-16 68551-12-2 2 0.00147629 0
Proppant 40/70 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.65794 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-04-19 1 OTTAWA 177,156 7,544 8,307
2016-04-20 2 OTTAWA 177,156 8,629 5,411
2016-04-21 3 OTTAWA 177,156 7,585 4,628
2016-04-21 4 OTTAWA 177,156 7,574 4,615
2016-04-21 5 OTTAWA 177,156 8,037 4,786
2016-04-22 6 OTTAWA 177,156 7,852 4,654
2016-04-22 7 OTTAWA 177,156 7,629 4,716
2016-04-22 8 OTTAWA 177,156 7,942 4,562
2016-04-23 9 OTTAWA 177,156 8,055 4,607
2016-04-25 10 OTTAWA 177,156 7,308 4,929
2016-04-25 11 OTTAWA 177,156 7,706 4,775
2016-04-25 12 OTTAWA 177,156 7,560 5,851
2016-04-26 13 OTTAWA 177,156 7,692 5,825
2016-04-26 14 OTTAWA 177,156 7,679 5,017
2016-04-26 15 OTTAWA 177,156 7,639 5,066
2016-04-26 16 OTTAWA 177,156 7,496 5,070
2016-04-27 17 OTTAWA 177,156 7,773 6,153
2016-04-27 18 OTTAWA 177,156 7,770 4,823
2016-04-27 19 OTTAWA 177,156 7,700 5,857
2016-04-27 20 OTTAWA 177,156 7,675 5,648
2016-04-28 21 OTTAWA 177,156 7,721 5,397
2016-04-28 22 OTTAWA 177,156 7,642 5,664
2016-04-28 23 OTTAWA 177,156 7,524 6,600
2016-04-28 24 OTTAWA 177,156 7,298 5,223
2016-04-29 25 OTTAWA 177,156 7,425 6,694
2016-04-29 26 OTTAWA 177,156 7,347 5,158
2016-05-02 27 OTTAWA 177,156 7,551 5,877
2016-05-02 28 OTTAWA 177,156 7,664 5,896
2016-05-02 29 OTTAWA 177,156 7,524 5,545
2016-05-03 30 OTTAWA 177,156 7,493 5,684
2016-05-03 31 OTTAWA 177,156 7,330 5,236
2016-05-03 32 OTTAWA 177,156 7,121 6,099
2016-05-03 33 OTTAWA 177,156 6,989 5,495
2016-05-03 34 OTTAWA 177,156 6,985 5,471
2016-05-04 35 OTTAWA 177,156 7,176 5,863
2016-05-04 36 OTTAWA 177,156 7,140 5,594
2016-05-04 37 OTTAWA 177,156 7,200 5,455
2016-05-04 38 OTTAWA 177,156 6,938 5,660
2016-05-05 39 OTTAWA 177,156 6,970 5,758
2016-05-05 40 OTTAWA 177,156 6,815 6,180
2016-05-05 41 OTTAWA 177,156 6,630 5,513
2016-05-06 42 OTTAWA 177,156 6,981 5,780

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 648,206.25 195 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 649,328.77 364 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 256,380.36 214 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 304,905.92 228 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,206.67 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 4.72 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Servicing Fluid 3.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 5,881.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Servicing Fluid 115.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Fracturing Fluid Waste 118.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Produced Fluid 53,203.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil 0.23 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Soil Contaminated by Oil & Gas Related Spills 0.23 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 78.96 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 17,746.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SENECA RESOURCES CO LLC Produced Fluid 37,446.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 86.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 13,340.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 15.71 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 34.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 20.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 628.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 2.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.46 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 85.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 27,860.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 9.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 13.31 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2394863 Primary Facility 2015-08-04 Administrative/File Review No Violations Noted
2417309 Primary Facility 2015-10-19 Drilling/Alteration No Violations Noted
2419895 Primary Facility 2015-10-28 Drilling/Alteration No Violations Noted
2423992 Primary Facility 2015-11-04 Drilling/Alteration No Violations Noted
2424619 Primary Facility 2015-11-12 Drilling/Alteration No Violations Noted
2437973 Primary Facility 2016-01-06 Administrative/File Review No Violations Noted
2497650 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2497710 Primary Facility 2016-07-01 Administrative/File Review No Violations Noted
2561559 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/17 at 1222 hrs. I conducted a routine inspection of Seneca Resources' E09-M well #51538 (API 047-24949) in Jones Twp., Elk Co. Eleven out of thirteen permitted wells have been drilled and are equipped for production. Well tags are present at each wellhead. There are no violations noted for this inspection.
2840629 Primary Facility 2019-02-15 Routine/Complete Inspection No Violations Noted This is an unconventional well pad with 13 wells drilled. Three have recently been completed and are currently in flowback. The well pad is mostly flat although rig mats have recently been removed and will require some grading when the weather breaks. There are numerous laydown tanks on site for fluid storage, and the tanks are set within temporary containment. There are also six 400 barrel tanks within lined containment for produced water. The pad was snow covered at this time, but may thaw with additional rain fall and snow melt. The site sign with well information and mailbox are at the entrance to the site.

For data sources see[9]

References