If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-049-00050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.050194,"lon":-80.047611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: Summit Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: EJ Oless | |
License Status: Plugged and Abandoned | |
Spud Date: 1991-08-07 | |
Permit Date: | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 42.050194 | |
Longitude: -80.047611 |
Date | Event |
---|---|
1991-08-07 | Drilling Completion |
2018-07-31 | Begin Plugging |
2018-08-07 | Finished Plugging |
2019-04-23 | Fully Plugged |
2019-10-31 | Old Well |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | NATL FUEL GAS SUPPLY CORP | Drilling Fluid Waste | 95.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1082676 | Primary Facility | 2001-12-11 | Routine/Complete Inspection | No Violations Noted | |
1082677 | Primary Facility | 2001-12-11 | Routine/Complete Inspection | No Violations Noted | |
1297901 | Primary Facility | 2003-12-15 | Routine/Complete Inspection | No Violations Noted | |
1839819 | Primary Facility | 2009-10-22 | Routine/Complete Inspection | No Violations Noted | |
1919606 | Primary Facility | 2010-10-13 | Routine/Complete Inspection | No Violations Noted | |
2014087 | Primary Facility | 2011-10-25 | Routine/Complete Inspection | No Violations Noted | |
2107923 | Primary Facility | 2012-10-10 | Routine/Complete Inspection | No Violations Noted | |
2213192 | Primary Facility | 2013-10-16 | Routine/Complete Inspection | No Violations Noted | |
2306370 | Primary Facility | 2014-09-23 | Routine/Complete Inspection | No Violations Noted | |
2421633 | Primary Facility | 2015-10-28 | Routine/Partial Inspection | No Violations Noted | |
2533591 | Primary Facility | 2016-11-02 | Routine/Complete Inspection | No Violations Noted | |
2655790 | Primary Facility | 2017-11-01 | Routine/Partial Inspection | No Violations Noted | |
2759769 | Primary Facility | 2018-08-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, rig was setup on well and circulating, cement crew arrived on location and is beginning to rig up to rig up to pump bottom hole cement plug after plug is set crew will then come back Monday and tag bottom plug then set bridge plug and run CBL and finish plugging top portion of well. |
2803226 | Primary Facility | 2018-11-14 | Routine/Complete Inspection | No Violations Noted | |
361102 | Primary Facility | 1987-11-04 | Routine/Complete Inspection | No Violations Noted | |
361103 | Primary Facility | 1988-11-15 | Routine/Complete Inspection | No Violations Noted | |
361104 | Primary Facility | 1989-11-14 | Routine/Complete Inspection | No Violations Noted | |
367511 | Primary Facility | 1990-12-19 | Routine/Complete Inspection | No Violations Noted | |
369954 | Primary Facility | 1991-09-24 | Routine/Complete Inspection | No Violations Noted | |
372755 | Primary Facility | 1992-10-28 | Routine/Complete Inspection | No Violations Noted | |
375433 | Primary Facility | 1994-01-26 | Routine/Complete Inspection | No Violations Noted | |
377182 | Primary Facility | 1994-12-14 | Routine/Complete Inspection | No Violations Noted | |
379958 | Primary Facility | 1995-12-07 | Routine/Complete Inspection | No Violations Noted | |
383703 | Primary Facility | 1997-10-29 | Routine/Complete Inspection | No Violations Noted | |
386261 | Primary Facility | 1998-10-21 | Routine/Complete Inspection | No Violations Noted | |
893709 | Primary Facility | 1999-11-04 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]