If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-049-20009 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.044418,"lon":-80.047162,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: Summit Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: HJ KANYAR 1523 | |
License Status: | |
Spud Date: | |
Permit Date: | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 42.044418 | |
Longitude: -80.047162 |
Date | Event |
---|---|
1956-04-11 | Performed Spud Operation |
1959-07-25 | Drilling Completion |
1959-07-25 | Perforation |
1970-10-29 | CONVERTED TO STORAGE (GAS) |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | NATL FUEL GAS SUPPLY CORP | Drilling Fluid Waste | 191.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1082646 | Primary Facility | 2001-12-10 | Routine/Complete Inspection | No Violations Noted | |
1297880 | Primary Facility | 2003-12-15 | Routine/Complete Inspection | No Violations Noted | |
1839786 | Primary Facility | 2009-10-22 | Routine/Complete Inspection | No Violations Noted | |
1919586 | Primary Facility | 2010-10-13 | Routine/Complete Inspection | No Violations Noted | |
2014042 | Primary Facility | 2011-10-25 | Routine/Complete Inspection | No Violations Noted | |
2107814 | Primary Facility | 2012-10-09 | Routine/Complete Inspection | No Violations Noted | |
2213137 | Primary Facility | 2013-10-15 | Routine/Complete Inspection | No Violations Noted | |
2306331 | Primary Facility | 2014-09-22 | Routine/Complete Inspection | No Violations Noted | |
2421589 | Primary Facility | 2015-10-28 | Routine/Partial Inspection | No Violations Noted | |
2533569 | Primary Facility | 2016-11-02 | Routine/Complete Inspection | No Violations Noted | |
2641158 | Primary Facility | 2017-09-28 | Routine/Partial Inspection | No Violations Noted | Inspected location to verify information and location on national fuel notice of intent to plug. |
2645788 | Primary Facility | 2017-10-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, plugging crew moving equipment onsite. |
2646067 | Primary Facility | 2017-10-11 | Administrative/File Review | No Violations Noted | |
2646094 | Primary Facility | 2017-10-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2646118 | Primary Facility | 2017-10-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, moving equipment on location. |
2646336 | Primary Facility | 2017-10-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, crew finishing rig up, after rig up is complete well will be killed. |
2646896 | Primary Facility | 2017-10-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, crew pumped a total of 76 bbl of brine in well to kill it, crew then flaring well to kill the well, after well is killed crew going to rig up well head and BOP. |
2647481 | Primary Facility | 2017-10-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, rig crew currently getting ready to nipple up, after nippled up crew will begin to trip pipe in hole to TD and clean out. |
2647483 | Primary Facility | 2017-10-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, crew getting ready to nipple up, after finished tripping pipe to clean out well. |
2648488 | Primary Facility | 2017-10-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, rig tripped in pipe and ran downhole to 2389' circulated out 2' of fill, TD well at 2391' crew currently tripping pipe back in hole to prepare for cementing operations, 1200. Cement crew arrive location and begin rig up for cementing operations. |
2648740 | Primary Facility | 2017-10-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, rig ran in hole and tagged cement @ 2250', rig currently waiting on wireline crew to arrive to run in and tag cement, set CIBP, then run bond log. |
2649340 | Primary Facility | 2017-10-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, was informed by National Fuel that they ran a bond log and found TOC to be @ 71', cement crew on location and rigging up to set 3 plugs, crew has set the first 500' cement plug, rig crew now tripping out 33 joints of tubing in preparation to set the remaining plugs, after plugs are set crew will then return 10/20/17 to tag top plug then rig down to move to next location. |
2655730 | Primary Facility | 2017-11-01 | Routine/Partial Inspection | No Violations Noted | Well is plugged |
2663336 | Primary Facility | 2017-11-21 | Administrative/File Review | No Violations Noted | locational data entry |
2803208 | Primary Facility | 2018-11-14 | Routine/Complete Inspection | No Violations Noted | |
361217 | Primary Facility | 1987-11-04 | Routine/Complete Inspection | No Violations Noted | |
361218 | Primary Facility | 1988-11-15 | Routine/Complete Inspection | No Violations Noted | |
361219 | Primary Facility | 1989-11-14 | Routine/Complete Inspection | No Violations Noted | |
367494 | Primary Facility | 1990-12-19 | Routine/Complete Inspection | No Violations Noted | |
369937 | Primary Facility | 1991-09-24 | Routine/Complete Inspection | No Violations Noted | |
372741 | Primary Facility | 1992-10-28 | Routine/Complete Inspection | No Violations Noted | |
375410 | Primary Facility | 1993-12-22 | Routine/Complete Inspection | No Violations Noted | |
377165 | Primary Facility | 1994-12-14 | Routine/Complete Inspection | No Violations Noted | |
379972 | Primary Facility | 1995-12-07 | Routine/Complete Inspection | No Violations Noted | |
383687 | Primary Facility | 1997-10-28 | Routine/Complete Inspection | No Violations Noted | |
386244 | Primary Facility | 1998-10-21 | Routine/Complete Inspection | No Violations Noted | |
893671 | Primary Facility | 1999-11-01 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]