If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-049-21082 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.157066,"lon":-79.799717,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: North East Township | |
Operator Name: CLIFFORD K & DOLORES M POST | |
Well Pad ID: | |
Farm/Lease Name: CLIFFORD POST 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1980-07-28 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 42.157066 | |
Longitude: -79.799717 |
Date | Event |
---|---|
1980-07-28 | New Permit Application |
1980-07-29 | Performed Spud Operation |
1980-08-03 | Drilling Completion |
1980-08-14 | Perforation |
1980-08-15 | Performed Stimulation |
1980-10-16 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
1980-08-15 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1981 | 9,950.59 | 0 | 0.00 | 0 | 0.00 | 0 | |
1982 | 4,038.10 | 0 | 0.00 | 0 | 0.00 | 0 | |
1983 | 6,822.33 | 0 | 0.00 | 0 | 0.00 | 0 | |
1984 | 6,085.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1985 | 3,906.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
1986 | 3,720.03 | 0 | 0.00 | 0 | 0.00 | 0 | |
1987 | 4,257.00 | 270 | 0.00 | 0 | 0.00 | 0 | |
1988 | 2,510.00 | 270 | 0.00 | 0 | 0.00 | 0 | |
1989 | 2,872.00 | 330 | 0.00 | 0 | 0.00 | 0 | |
1990 | 4714.00 | 330 | 0.00 | 0 | 0.00 | 0 | |
1993 | TRANSFUEL RESOURCES CO | 2903.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1994 | TRANSFUEL RESOURCES CO | 821.00 | 246 | 0.00 | 0 | 0.00 | 0 |
1995 | RANGE OPR CO | 87.00 | 61 | 0.00 | 0 | 0.00 | 0 |
1996 | RANGE OPR CO | 1184 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | RANGE OPR CO | 735 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | RANGE OPR CO | 391 | 334 | 0.00 | 0 | 0.00 | 0 |
1999 | RANGE OPR CO | 399 | 215 | 0.00 | 0 | 0.00 | 0 |
2000 | CLIFFORD K & DOLORES M POST | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2001 | CLIFFORD K & DOLORES M POST | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2002 | CLIFFORD K & DOLORES M POST | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | CLIFFORD K & DOLORES M POST | 83.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | CLIFFORD K & DOLORES M POST | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | CLIFFORD K & DOLORES M POST | 83 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | CLIFFORD K & DOLORES M POST | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | CLIFFORD K & DOLORES M POST | 83.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | CLIFFORD K & DOLORES M POST | 83.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | CLIFFORD K & DOLORES M POST | 83.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]