If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-049-25382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.25765,"lon":-79.783044,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Erie | |
Municipality: North East Township | |
Operator Name: LAKE ERIE ENERGY PART LLC | |
Well Pad ID: | |
Farm/Lease Name: DOHLER 1 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2011-03-30 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 42.257650 | |
Longitude: -79.783044 |
Date | Event |
---|---|
2011-03-30 | New Permit Application |
2011-05-13 | Performed Spud Operation |
2011-05-24 | Drilling Completion |
2011-06-10 | Perforation |
2011-06-10 | Performed Stimulation |
2011-06-28 | Drilling Completion |
2011-09-06 | NEWLY DRILLED |
2011-09-09 | FULLY PLUGGED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-06-10 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | LAKE ERIE ENERGY PART LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | LAKE ERIE ENERGY PART LLC | Produced Fluid | 4,679.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1971834 | Primary Facility | 2011-05-09 | Routine/Complete Inspection | No Violations Noted | |
1972087 | Primary Facility | 2011-05-10 | Follow-up Inspection | No Violations Noted | Follow-up to check BMP maintenance following winter season and prior to rig arrivial. Found operator stoning access road and site and repairing BMPs. Found new diversion ditch on west edge of site. Required operator to clean out sump on north edge of site and install slit fence on southwest corner of site. |
1972882 | Primary Facility | 2011-05-13 | Drilling/Alteration | No Violations Noted | |
1973070 | Primary Facility | 2011-05-16 | Drilling/Alteration | No Violations Noted | |
1973311 | Primary Facility | 2011-05-16 | Follow-up Inspection | No Violations Noted | Upon inspection I found the rig on-site but not operating. I walked the site perimeter and found all E&S controls in place and functioning as designed. The E&S Plan and permit where on-site. I found no evidence of erosion and sedimentation issues. teh pipe discharge onto Rt 5 was light brown. I did notice the soil between the grape vine rows was tiled and top soil broken. This would increase the chance of soil particles entering field drain tiles in the vineyard that would subsequenty flow to Rt 5 road ditch. |
1974121 | Primary Facility | 2011-05-17 | Drilling/Alteration | No Violations Noted | |
1974136 | Primary Facility | 2011-05-18 | Drilling/Alteration | No Violations Noted | |
1974141 | Primary Facility | 2011-05-19 | Drilling/Alteration | No Violations Noted | |
1974949 | Primary Facility | 2011-05-23 | Drilling/Alteration | No Violations Noted | |
1976631 | Primary Facility | 2011-05-16 | Routine/Complete Inspection | No Violations Noted | Upon inspection today I found the drilling rig on-site, but not in operation. Operator indicated they needed to make adjustments to the rig before proceeding any further. I also noted a new diversion ditch had been constructed across the site between the rig and the waste pit. This ditch is setup to handle surface runoff from the vineyard to the sump on the north edge of the site. This ditch replaces the diversion ditch that ran along the west side of the site, that had to be moved to accomadate the waste pit. The waste pit had several feet of freeboard. I inspected all E&S controls and found no violations. |
1977882 | Primary Facility | 2011-05-24 | Drilling/Alteration | No Violations Noted | |
1978232 | Primary Facility | 2011-05-25 | Drilling/Alteration | No Violations Noted | |
1979901 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | No Violations Noted | On site inspection to check status of pit closure. Upon inspection I found the small pit covered and the large pit in the process of reclaim. The operator was waiting on delivery of a top cover liner before finishing the final pit closure for this pit. The cover was to be delivered the night of 6/2/11 and installed the next day. The well site was stabile and all E&S controls in place. |
1979971 | Primary Facility | 2011-06-10 | Routine/Complete Inspection | No Violations Noted | |
1979981 | Primary Facility | 2011-06-13 | Routine/Complete Inspection | No Violations Noted | |
1981147 | Primary Facility | 2011-06-15 | Routine/Complete Inspection | No Violations Noted | |
1981183 | Primary Facility | 2011-06-16 | Routine/Complete Inspection | No Violations Noted | |
1984312 | Primary Facility | 2011-06-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
1984317 | Primary Facility | 2011-06-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2004644 | Primary Facility | 2011-09-22 | Site Restoration | Pending | Upon inspection i found ths ite graded and 95 % cover established. I did note a 6x6 area that did not have grass growing on it. This area was the area of th dril pit. i will check with mgt and determine what steps to take. |
2004651 | Primary Facility | 2011-09-22 | Site Restoration | Pending | Today inspection found the site graded with a 98 % cover established. I did notice a small area approx 6x6 feet that was bare, free of any grass or other cover. This area was in the area of the waste pit. i will discuss what steps to take with mgt. |
2084368 | Primary Facility | 2012-07-12 | Site Restoration | No Violations Noted |
For data sources see[8]