If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-21145 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.057222,"lon":-79.721361,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Perry Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: MAGRUDA 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2000-03-15 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.057222 | |
Longitude: -79.721361 |
Date | Event |
---|---|
2000-03-15 | New Permit Application |
2000-03-20 | Performed Spud Operation |
2000-06-02 | Drilling Completion |
2000-07-05 | Perforation |
2000-07-05 | Performed Stimulation |
2001-12-10 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2000-07-05 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2000 | PENNECO OIL CO INC | 879 | 25 | 0.00 | 0 | 0.00 | 0 |
2001 | PENNECO OIL CO INC | 8101 | 366 | 0.00 | 0 | 0.00 | 0 |
2002 | PENNECO OIL CO INC | 6277 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | PENNECO OIL CO INC | 5966 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | PENNECO OIL CO INC | 6941 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | PENNECO OIL CO INC | 4291 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | PENNECO OIL CO INC | 2940.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PENNECO OIL CO INC | 2553.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PENNECO OIL CO INC | 174.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | PENNECO OIL CO INC | 1798.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 1,574.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 1,558.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 1,633.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 1,153.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 1,280.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 1,132.31 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 1,376.65 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 1,319.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 1,154.24 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 1,035.46 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2000 | PENNECO OIL CO INC | Fracking Fluid | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2000 | PENNECO OIL CO INC | Drilling | 690.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2004 | PENNECO OIL CO INC | Brine | 80.00 Bbl | Municipal Sewage Treatment Plant | PA0026891 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
925539 | Primary Facility | 2000-03-21 | Drilling/Alteration | No Violations Noted | Magruda has stoned access and stoned turn radius at access entrance. Bench is prepared for drilling as to excavation, pits, topsoil piled. Slope is moderate. Much fencing is disturbed in front pasture, later gets replaced, plus no erosion or run-off problems. |
931110 | Primary Facility | 2000-04-13 | Drilling/Alteration | No Violations Noted | Conductor pipe is set on bench, water filling excavated pits, plan & site ID are at hand. Rig awaits some drying out at bench. |
935383 | Primary Facility | 2000-05-03 | Drilling/Alteration | No Violations Noted | Bench is cut, pits installed, filled w/rainwater at this time, not lined. Rig is up and drilling equipment in place. Acess is well stoned and stabilized. Residential drive is used as well access. Area is well fenced. |
949614 | Primary Facility | 2000-07-07 | Drilling/Alteration | No Violations Noted | Pits being pumped this date. Well drilled , frac pit emptied. |
998216 | Primary Facility | 2001-01-24 | Routine/Complete Inspection | No Violations Noted | Well is equipped & producing. Location is in horse stockyard or cattle stockyard and fencing and gating appears fully restored with equipment protection for the well equipment from nudging farm animals. |
For data sources see[8]