If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24330 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.020536,"lon":-79.678322,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149688 | |
Farm/Lease Name: GEORGE F JOSEPH 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.020536 | |
Longitude: -79.678322 |
Date | Event |
---|---|
2010-03-19 | New Permit Application |
2010-06-08 | Performed Spud Operation |
2010-10-26 | Drilling Completion |
2010-11-17 | Perforation |
2010-11-17 | Performed Stimulation |
2011-02-17 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-11-17 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 20,051.00 | 10 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 789,823.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 442,379.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 319,435.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 236,169.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 210,662.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 167,852.00 | 346 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 148,695.46 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 133,468.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 134,340.00 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 913.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 150.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 292.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 50.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 4,818.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,210.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 82.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 998.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 338.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid | 82.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Produced Fluid | 234.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 410.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 234.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 244.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 350.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 131.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 185.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 184.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 135.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1890813 | Primary Facility | 2010-06-11 | Drilling/Alteration | No Violations Noted | |
1890827 | Primary Facility | 2010-06-10 | Drilling/Alteration | No Violations Noted | |
1916597 | Primary Facility | 2010-09-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,CONDUTOR SET, SITE AND PITS ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING GEORE JOSEPH#11 -H TONIGHT. |
1938176 | Primary Facility | 2010-08-18 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PHOENIX RIG # 5 DRILLING @ 8773' TODAY.KOP AT 4999', LANDING POINT IN MARCELLUS @ 8733'. |
1938177 | Primary Facility | 2010-09-05 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PHOENIX RIG # 5 DRILLLING @ 10,973 TODAY.TOP DRIVE BEING REPAIRED,DRILLING BY KELLY. E&S AND PITS ARE IN GOOD CONDITION. |
1938180 | Primary Facility | 2010-10-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PHOENIX # 5 DRILLING @ 16,732 TODAY. E&S AND PITS ARE IN GOOD CONDITION, RUNNING 5 1/2" PROD. STRING TODAY, CEMENTING TONIGHT. |
For data sources see[8]