X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24335

Well Details

Well ID: 37-051-24335
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Dunbar Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149686
Farm/Lease Name: JAMES G SIMON ETAL 9H
License Status:
Spud Date:
Permit Date: 2010-03-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.002533
Longitude: -79.682167

For data sources see[1][2][3]

Well History

Date Event
2010-03-24 New Permit Application
2010-08-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-03-15 2011-03-15 8,450 5,735,717

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ICP-1000 Superior Well Services Dispersant
1,2-Propylene glycol 57-55-6 50.00 0.01
Anionic copolymer 50.00 0.01
Sand Proppant Quartz 14808-60-7 100.00 8.41
Super MAX Superior Well Services Surfactant/Foamer 2-Ethylhexanol 104-76-7 40.00 0.04
Isopropanol 67-63-0 30.00 0.03
2-Butoxyethanol 111-76-2 7.00 0.00732000
Other Unspecified 23.00 0.02
Water Water 7732-18-5 100.00 90.35
Super TSC Superior Well Services Dispersant Anionic polymer 10.00 0.00109000
Other Unspecified 20.00 0.00218000
1,2-Propylene glycol 57-55-6 50.00 0.00545000
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00109000
Anionic copolymer 10.00 0.00109000
WFR-3B Superior Well Services Friction Reducer Other - Not Specified 31.00 0.03
Stoddard solvent 8052-41-3 10.00 0.01
1,2-Propylene glycol 57-55-6 25.00 0.03
Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00505000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
7.5 HCl Acid Superior Well Services Cleaning
Hydrochloric acid 7647-01-0 7.50 0.07
Water 7732-18-5 92.50 0.88
AI-2 Superior Well Services Acid Corrosion Inhibitor
Isopropanol 67-63-0 30.00 0.00012000
Propargyl alcohol 107-19-7 30.00 0.00012000
2-Butoxyethanol 111-76-2 30.00 0.00012000
Other - unspecified 10.00 0.00004000
KR-153SL Superior Well Services Biocide Polyethylene glycol 25322-68-3 50.00 0.00605000
Other - Unspecified 25.50 0.00309000
Ethylene glycol 107-21-1 1.00 0.00012000
Diethylene glycol 111-46-6 3.50 0.00042000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00242000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 560,975.00 279 0.00 0 0.00 0
2012 XTO ENERGY INC 431,058.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 299,677.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 233,056.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 207,302.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 180,942.00 351 0.00 0 0.00 0
2017 XTO ENERGY INC 148,866.39 352 0.00 0 0.00 0
2018 XTO ENERGY INC 123,753.00 346 0.00 0 0.00 0
2019 XTO ENERGY INC 110,400.00 355 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,081.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,056.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 PHILLIPS EXPLORATION INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-20114
2011 PHILLIPS EXPLORATION INC Produced Fluid 7,590.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 1,927.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 140.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 0114
2012 XTO ENERGY INC Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 1,491.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 160.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Produced Fluid 1,253.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 XTO ENERGY INC Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 114
2012 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 164.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 XTO ENERGY INC Produced Fluid 310.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 634.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 310.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 62.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 XTO ENERGY INC Produced Fluid 224.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 139.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 139.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 167.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 133.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 464.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 170.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 48.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 170.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 312.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 231.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 132.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 170.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1910116 Primary Facility 2010-08-20 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SPUDDING RIG RD-20, SETTING CONDUCTOR,PLANNING TO DRILL TO 100' AND SHUT DOWN FOR WEEK-END,
1916576 Primary Facility 2010-09-10 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, SPUDDING RIG RD-20,DRILLING THE 9 5/8' AT THE PRESENT TIME,EXSPECTED TO TD AT 4000'.SITE AND PITS ARE IN GOOD CONDITION,
1939672 Primary Facility 2010-12-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS.PHOENIX # 5 DRILLING @ 2289 '. E&S AND PITS ARE IN GOOD CONDITION.
1958236 Primary Facility 2011-01-12 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS ,PHOENIX #5 @ 7519'.TODAY. E&S AND PITS ARE IN GOOD CONDITION.
1961006 Primary Facility 2011-03-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS LOOK GOOD. WHILE DRILLING OUT PLUGS,HYDRALIC HOSE SPLIT OPEN. CONTAINED AND BEING REPAIRED.LESS THAN 1 GAL.ON CEMENT PAD. HAPPEN DURING INSPECTION.
1962254 Primary Facility 2011-03-31 Routine/Complete Inspection No Violations Noted
2100122 Primary Facility 2012-09-12 Routine/Complete Inspection No Violations Noted Site Id sign at entrance had incorrect company name, wells labeled correctly, 6 tanks on site in containment, E&S ok, sed trap 2 still in place.
2110978 Primary Facility 2012-10-24 Site Restoration No Violations Noted Restoration extension request by operator, site stable, pits removed, vegetative growth good, two of three sed ponds removed, last one being worked on today. Restoration extension approved to 7/30/13.
2558340 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted

On 01/05/17 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by XTO Energy Inc. The Act 9 sign was in place, but had been vandalized with spray paint. It appeared that XTO had attempted to remove the spray paint and the sign was legible. All required documents were present at the site. The site was well vegetated and there were no signs of erosion. The site meets the requirements for permit termination. The NOT is approved.

2684639 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well head surrounded by security fence. One brine tank on site.

For data sources see[8]

References