If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24336 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.002439,"lon":-79.682294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149686 | |
Farm/Lease Name: JAMES G SIMON ETAL 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.002439 | |
Longitude: -79.682294 |
Date | Event |
---|---|
2010-03-22 | New Permit Application |
2010-09-08 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-03-12 | 2011-03-12 | 8,425 | 4,774,008 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Water | 7732-18-5 | 100.00 | 89.98 | |||
ICP-1000 | Superior Well Services | Iron Control | Anionic copolymer | 50.00 | 0.01 | |||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.01 | |||||
AI-2 | Superior Well Services | Acid Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 30.00 | 0.00012000 | ||
Isopropanol | 67-63-0 | 30.00 | 0.00012000 | |||||
Propargyl alcohol | 107-19-7 | 30.00 | 0.00012000 | |||||
Other - unspecified | 10.00 | 0.00004000 | ||||||
7.5 HCl Acid | Superior Well Services | Cleaning | Water | 7732-18-5 | 92.50 | 0.89 | ||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.07 | |||||
KR-153SL | Superior Well Services | Biocide | Ethylene glycol | 107-21-1 | 1.00 | 0.00012000 | ||
Other - Unspecified | 25.50 | 0.00315000 | ||||||
Diethylene glycol | 111-46-6 | 3.50 | 0.00043000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00247000 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.00618000 | |||||
Super MAX | Superior Well Services | Surfactant | Other Unspecified | 23.00 | 0.02 | |||
2-Ethylhexanol | 104-76-7 | 40.00 | 0.04 | |||||
Isopropanol | 67-63-0 | 30.00 | 0.03 | |||||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.00726000 | |||||
Super TSC | Superior Well Services | Scale Inhibitor | ||||||
Anionic copolymer | 10.00 | 0.00087000 | ||||||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | 10.00 | 0.00087000 | |||||
Other Unspecified | 20.00 | 0.00174000 | ||||||
Anionic polymer | 10.00 | 0.00087000 | ||||||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00435000 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 8.78 | |||
WFR-3B | Superior Well Services | Friction Reducer | Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | 0.00437000 | ||
Stoddard solvent | 8052-41-3 | 10.00 | 0.01 | |||||
1,2-Propylene glycol | 57-55-6 | 25.00 | 0.02 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | |||||
Other - Not Specified | 31.00 | 0.03 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 540,229.00 | 282 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 404,891.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 280,977.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 185,953.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 168,350.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 143,697.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 129,533.85 | 351 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 115,889.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 137,167.00 | 354 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,169.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 778.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 5,044.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 2,977.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 308.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 1,253.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 68.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 965.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 70.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 418.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 542.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 418.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 46.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | XTO ENERGY INC | Produced Fluid | 306.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 136.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 136.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 368.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 133.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 465.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 171.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 49.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 170.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 312.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 231.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 132.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 170.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1916559 | Primary Facility | 2010-09-29 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD..PHILLIPS RIG # 1 HAS RETURN TO SAME HOLE TO DRILL DEEPER TO DEPTH OF 6150'. |
1916584 | Primary Facility | 2010-09-14 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,SPUDDING RIG RD --20, FINISH AT 4000' MOVED OFF LOCATION COMPLETELY. ONLY ONE RIG ON SITE NOW. SITE AND PITS LOOK GOOD. |
1939677 | Primary Facility | 2010-12-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS PHOENIX # 5 FINISH DRILLING SHORTER THAN PLANNED (UNEXSPECTED FORMATION PROBLEMS) . E&S AND PITS ARE IN GOOD CONDITION. |
1961014 | Primary Facility | 2011-03-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD. DRILLING OUT PLUGS AND FLARING. |
1962256 | Primary Facility | 2011-03-31 | Routine/Complete Inspection | No Violations Noted | |
2100123 | Primary Facility | 2012-09-12 | Routine/Complete Inspection | No Violations Noted | Site Id sign at entrance had incorrect company name, wells labeled correctly, 6 tanks on site in containment, E&S ok, sed trap 2 still in place. |
2110983 | Primary Facility | 2012-10-24 | Site Restoration | No Violations Noted | Restoration extension request by operator, site stable, pits removed, vegetative growth good, two of three sed ponds removed, last one being worked on today. Restoration extension approved to 7/30/13. |
2558341 | Primary Facility | 2017-01-05 | Routine/Complete Inspection | No Violations Noted |
On 01/05/17 at approximately 1400 hours I conducted a site restoration inspection in response to an NOT submittal by XTO Energy Inc. The Act 9 sign was in place, but had been vandalized with spray paint. It appeared that XTO had attempted to remove the spray paint and the sign was legible. All required documents were present at the site. The site was well vegetated and there were no signs of erosion. The site meets the requirements for permit termination. The NOT is approved. |
2684640 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well head surrounded by security fence. One brine tank on site. |
For data sources see[8]