If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24367 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.740383,"lon":-79.439622,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Henry Clay Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 146309 | |
Farm/Lease Name: HUMBERSTON UNIT | |
License Status: Inactive | |
Spud Date: | |
Permit Date: 2010-07-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.740383 | |
Longitude: -79.439622 |
Date | Event |
---|---|
2010-07-13 | New Permit Application |
2011-01-28 | Performed Spud Operation |
2019-12-17 | Inactive Well Request Granted |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-27 | 2011-05-27 | 8,499 | 831,180 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Superior Well Services | Propping Agent | |||||
Quartz | 14808-60-7 | 99.90 | 16.45 | |||||
KR-153SL | Superior Well Services | Biocide | ||||||
Ethylene glycol | 107-21-1 | 1.00 | ||||||
Polyethylene glycol | 25322-68-3 | 50.00 | ||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.02 | |||||
Diethylene glycol | 111-46-6 | |||||||
Super Scale Control TSC | Superior Well Services | Scale Inhibitor | Anionic Copolymer | |||||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | |||||||
Anionic Polymer | ||||||||
1,2-Propylene glycol | 57-55-6 | 0.05 | ||||||
Water | Base Fluid | Water | 100.00 | 83.21 | ||||
FE OXCLEAR | Superior Well Services | Oxygen Scavenger | ||||||
Ammonium bisulfite | 10192-30-0 | 0.09 | ||||||
WFR-3B | Superior Well Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.17 | |||
1,2-Propylene glycol | 57-55-6 | 25.00 | ||||||
Stoddard solvent | 8052-41-3 | 10.00 | ||||||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,480.00 Bbl | LANDFILL | NY STATE #32S11 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 808.15 Tons | LANDFILL | 100172 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1958062 | Primary Facility | 2011-02-04 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS. PLANNING TO SET INTERMEDIATE STRING OF 95/8" CASING AND CEMENTING EARLY MORNING @ 1817'. CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 1535' AT PRESENT TIME. |
1958068 | Primary Facility | 2011-01-31 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PLANNING TO SET SURFACE TONIGHT @ 550' AND CEMENTING .E&S AND PITS ARE IN GOOD CONDITION. |
1959310 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | No Violations Noted | |
1960986 | Primary Facility | 2011-03-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 7536' TODAY. |
1961190 | Primary Facility | 2011-03-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 59 MOVING ON AND SETTING UP 3/7/2011. |
1977465 | Primary Facility | 2011-06-01 | Routine/Complete Inspection | No Violations Noted | |
1984217 | Primary Facility | 2011-03-31 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 12,230' TODAY. PLANNING (TD) TONIGHT @ 12,682' , RUNNING 51/2" CASING TONIGHT,CEMENTING LATE 4/1/2011. |
2134860 | Primary Facility | 2013-01-30 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place, E&S and PPC plan in box, area gated and locked. Well head labeled, E&S in place and functioning no accelrated erosion. |
2165178 | Primary Facility | 2013-05-09 | Routine/Complete Inspection | No Violations Noted | Site Id in place. Site gated and locked. Restoration work has been completed. Soil piles, sed traps, and diversion channels are removed, seeded and mulched. |
2188009 | Primary Facility | 2013-07-30 | Routine/Complete Inspection | No Violations Noted | Well inactive, site locked, new act 9 sign in place, no E&S issues. |
2277566 | Primary Facility | 2014-06-10 | Routine/Complete Inspection | No Violations Noted | On 6/10/2014, the Department conducted an inspection of the Chevron Appalachia’s Humbertson Unit 1H well in Henry Clay Twp, Fayette County. |
2373211 | Primary Facility | 2015-05-20 | Routine/Complete Inspection | No Violations Noted | |
2587210 | Primary Facility | 2017-04-26 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The well head appeared to be in good condition. There were no violations observed at the time of inspection. |
2627015 | Primary Facility | 2017-06-28 | Routine/Complete Inspection | No Violations Noted | Routine Inspection , One year Inactive Status Extension meets (DEP) requirments (6/26/2017) . The new operator presented info on future pipe line installation.The well is Shut - In and secure at this time. |
2693205 | Primary Facility | 2018-02-12 | Routine/Complete Inspection | No Violations Noted | According to the Department records, regulatory inactive status was granted an extension for one year on 6-26-2017.
Well head surrounded by security fence. Department unable to fully examine documentation on site due to animal activity in mailbox. Department recommends operator maintain mailbox and documents to ensure Department is able to safely review paperwork. Department unable to determine if ESCGP for this site is terminated. Department recommends operator provide documentation showing NOT is approved. |
2852029 | Primary Facility | 2019-03-12 | Compliance Evaluation | No Violations Noted | This well is tagged and under regulatory inactive status.
The well head casing and poly fluid collection tank look ok. The operator states on the inactive status application that LPR will begin production on nearby wells by the end of October, 2018 and that the results of these wells will help to evaluate the economics of building a pipeline to the Humberston Well Pad. The operator then states that if the economics do not support the cost of building the pipeline infrastructure then the operator will proceed with Plugging and Abandoning the well by October 2019. A follow up compliance inspection will be conducted at this site on a future date. |
For data sources see[8]