X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24392

Well Details

Well ID: 37-051-24392
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148144
Farm/Lease Name: CROUSHORE 10H
License Status:
Spud Date:
Permit Date: 2010-09-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.902881
Longitude: -79.908739

For data sources see[1][2][3]

Well History

Date Event
2010-09-27 New Permit Application
2010-11-04 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-06-22 2011-06-22 7,433

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.25
Unislik ST 50 CESI Chemical Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Scale Inhibitor A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00680000
Proppant (lbs) Proppant 100.00 9.23
CMHPG Ashland Water Viscosifier Carboxymethylhydroxyporoyl guar blend 100.00 0.00145000
GBL Clearwater International Gel Breaker Ethylene glycol 107-21-1 60.00 0.00002000
Iron Control A Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00683000
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00 0.00389000
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00691000
Dibromoacetonitrile 3252-43-5 5.00 0.00115000
Clean Volume (gals) Carrier/Base Fluid 100.00 90.77

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 186,626.00 79 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 390,872.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 203,301.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 172,168.00 334 0.00 0 60.00 153
2015 CHEVRON APPALACHIA LLC 134,402.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 111,032.00 302 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 72,202.00 335 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 95,840.00 335 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 54,785.00 212 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 2,535.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Drilling Fluid Waste 13,495.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,036.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Produced Fluid 7,384.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,995.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,360.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 130.00 Bbl LANDFILL SWF 1032-WV0109
2011 CHEVRON APPALACHIA LLC Produced Fluid 3,825.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste 32,171.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 9,317.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid 2,814.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Produced Fluid 4,190.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,430.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,054.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 530.36 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 513.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,416.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 279.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 207.00 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 294.01 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 60.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 607.34 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 23.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 489.99 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1938090 Primary Facility 2010-11-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, ROCKY MOUNTAIN DRILLING # 1 DRILLING AND SETTING CONDUTOR 11/7/2010. E&S ARE IN GOOD CONDITION. WHIPSTOCK# 17 MOVING ON 11/8 2010.
1938092 Primary Facility 2010-11-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.CEMENTING 16"@ 6:00 PM TONIGHT.
1938095 Primary Facility 2010-11-13 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.SUCCESSFULLY CEMENTED 11 3/4" CASING STRING .STARTED @ 5:00 PM (11/12/2010). BUMB PLUG 8:15 PM ,FLOATS HELD. PITS ARE GOOD.
1938098 Primary Facility 2010-11-18 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.PITS ARE IN GOOD CONDITION. PREPAIRING TO CEMENT 8 5/8" INTERMEDIATE CASING TONIGHT.
1943654 Primary Facility 2010-01-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, NOMAC -230 MOVING OFF (1/7/2010 ) @ MUDDED AND SECURE CAP ON WELL. PATTERSON -227 MOVING ON STARTING 1/10/2010 (NEW-RIG ).
1948352 Primary Facility 2011-02-07 Routine/Complete Inspection No Violations Noted
1955531 Primary Facility 2011-03-08 Routine/Complete Inspection No Violations Noted
1958157 Primary Facility 2011-02-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION. SKIDDED OVER RIGGED UP STARTED DRILLING,PRESENT DEPTH @ 6020' TODAY.
1958186 Primary Facility 2011-03-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.DRILLIND @ 8855' PREPAIRING PLUG BACK TO KICK OFF TO REACH LOWER MARCELLUS FORMATION.REPORTED SPILL IN HOPPER HOUSE WHERE VALVE WAS LEFT CRACK OPEN.IT SPRAY THE ENTIRE BUILDING INSIDE WITH BIO -DEGADEABLE MUD. THE DOORS WERE ALL CLOSED AT TIME. SMALL AMOUNT MUD REACHED THE CONTAIMENT AREA WHILE PRESSURE CLEANING AND RETRIEVING FLUIDS FROM INSIDE THE HOPPER HOUSE. SITE IS ALL CLEAN UP. WILL BE MONITORED DAILY BY CO. MAN AND ATLAS ENVIRONMENTAL PERSONNEL. MY BEST GUESS ESTIMATED IS UNDER 5 GALLONS OF FLUID. NO VIOLATIONS DEEMED WARRANT AT PRESENT TIME.
1961127 Primary Facility 2011-03-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION. WELL DRILLING COMPLETED 3/19/2011. CEMENTING PROD. STRING 3/20/2011.RIG STARTED MOVING TO NEW LOCATION 3/22/2011.
1961204 Primary Facility 2011-02-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR CEMENTED IN @ 48' OF 24" CASING.
1964316 Primary Facility 2011-04-06 Routine/Complete Inspection No Violations Noted
1984802 Primary Facility 2011-06-27 Routine/Complete Inspection No Violations Noted
1989860 Primary Facility 2011-07-20 Routine/Complete Inspection No Violations Noted
2029225 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed.
2101453 Primary Facility 2012-09-18 Routine/Complete Inspection No Violations Noted Site ID sign in place, site fenced and gated, tanks in containment, wells labeled.

For data sources see[8]

References