If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24392 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.902881,"lon":-79.908739,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: German Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148144 | |
Farm/Lease Name: CROUSHORE 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.902881 | |
Longitude: -79.908739 |
Date | Event |
---|---|
2010-09-27 | New Permit Application |
2010-11-04 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-22 | 2011-06-22 | 7,433 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.25 | ||
Unislik ST 50 | CESI Chemical | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00680000 | ||
Proppant (lbs) | Proppant | 100.00 | 9.23 | |||||
CMHPG | Ashland | Water Viscosifier | Carboxymethylhydroxyporoyl guar blend | 100.00 | 0.00145000 | |||
GBL | Clearwater International | Gel Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | ||
Iron Control A | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00683000 | ||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | 0.00389000 | ||
Biocide EC 6116A | Nalco | Biocide | Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00691000 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00115000 | |||||
Clean Volume (gals) | Carrier/Base Fluid | 100.00 | 90.77 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 186,626.00 | 79 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 390,872.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 203,301.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 172,168.00 | 334 | 0.00 | 0 | 60.00 | 153 |
2015 | CHEVRON APPALACHIA LLC | 134,402.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 111,032.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 72,202.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 95,840.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 54,785.00 | 212 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 2,535.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2010 | ATLAS RESOURCES LLC | Drilling Fluid Waste | 13,495.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,036.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 7,384.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,995.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 130.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 130.00 Bbl | LANDFILL | SWF 1032-WV0109 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,825.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 32,171.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 9,317.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,814.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,190.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,430.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,054.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 530.36 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 513.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,416.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 279.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 207.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 294.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 60.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 607.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 23.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 489.99 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938090 | Primary Facility | 2010-11-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, ROCKY MOUNTAIN DRILLING # 1 DRILLING AND SETTING CONDUTOR 11/7/2010. E&S ARE IN GOOD CONDITION. WHIPSTOCK# 17 MOVING ON 11/8 2010. |
1938092 | Primary Facility | 2010-11-09 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.CEMENTING 16"@ 6:00 PM TONIGHT. |
1938095 | Primary Facility | 2010-11-13 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.SUCCESSFULLY CEMENTED 11 3/4" CASING STRING .STARTED @ 5:00 PM (11/12/2010). BUMB PLUG 8:15 PM ,FLOATS HELD. PITS ARE GOOD. |
1938098 | Primary Facility | 2010-11-18 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.PITS ARE IN GOOD CONDITION. PREPAIRING TO CEMENT 8 5/8" INTERMEDIATE CASING TONIGHT. |
1943654 | Primary Facility | 2010-01-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, NOMAC -230 MOVING OFF (1/7/2010 ) @ MUDDED AND SECURE CAP ON WELL. PATTERSON -227 MOVING ON STARTING 1/10/2010 (NEW-RIG ). |
1948352 | Primary Facility | 2011-02-07 | Routine/Complete Inspection | No Violations Noted | |
1955531 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1958157 | Primary Facility | 2011-02-25 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION. SKIDDED OVER RIGGED UP STARTED DRILLING,PRESENT DEPTH @ 6020' TODAY. |
1958186 | Primary Facility | 2011-03-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.DRILLIND @ 8855' PREPAIRING PLUG BACK TO KICK OFF TO REACH LOWER MARCELLUS FORMATION.REPORTED SPILL IN HOPPER HOUSE WHERE VALVE WAS LEFT CRACK OPEN.IT SPRAY THE ENTIRE BUILDING INSIDE WITH BIO -DEGADEABLE MUD. THE DOORS WERE ALL CLOSED AT TIME. SMALL AMOUNT MUD REACHED THE CONTAIMENT AREA WHILE PRESSURE CLEANING AND RETRIEVING FLUIDS FROM INSIDE THE HOPPER HOUSE. SITE IS ALL CLEAN UP. WILL BE MONITORED DAILY BY CO. MAN AND ATLAS ENVIRONMENTAL PERSONNEL. MY BEST GUESS ESTIMATED IS UNDER 5 GALLONS OF FLUID. NO VIOLATIONS DEEMED WARRANT AT PRESENT TIME. |
1961127 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION. WELL DRILLING COMPLETED 3/19/2011. CEMENTING PROD. STRING 3/20/2011.RIG STARTED MOVING TO NEW LOCATION 3/22/2011. |
1961204 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR CEMENTED IN @ 48' OF 24" CASING. |
1964316 | Primary Facility | 2011-04-06 | Routine/Complete Inspection | No Violations Noted | |
1984802 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | |
1989860 | Primary Facility | 2011-07-20 | Routine/Complete Inspection | No Violations Noted | |
2029225 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed. |
2101453 | Primary Facility | 2012-09-18 | Routine/Complete Inspection | No Violations Noted | Site ID sign in place, site fenced and gated, tanks in containment, wells labeled. |
For data sources see[8]