If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24402 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.027236,"lon":-79.655525,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149369 | |
Farm/Lease Name: STEVENS UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.027236 | |
Longitude: -79.655525 |
Date | Event |
---|---|
2010-12-23 | New Permit Application |
2011-03-02 | Performed Spud Operation |
2011-04-26 | Drilling Completion |
2011-06-24 | Perforation |
2011-06-24 | Performed Stimulation |
2016-04-21 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-24 | 2011-06-24 | 8,155 | 4,924,584 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Feriplex 40 - Acid - Additives | Chemplex | Acid Iron Chelating Agent | Sodium hydroxide | 1310-73-2 | 1.00 | 0.00002000 | |
Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00076000 | |||||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00004000 | |||||
Other - Unspecified | 57.00 | 0.00108000 | ||||||
7.5 HCl Acid | Chemplex | Cleaning | Hydrochloric acid | 7647-01-0 | 7.50 | 0.06 | ||
Water | 7732-18-5 | 92.50 | 0.82 | |||||
Plexhib 256 | Chemplex | Acid Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 8.00 | 0.00004000 | ||
Methanol | 67-56-1 | 40.00 | 0.00020000 | |||||
Other - Unspecified | 52.00 | 0.00026000 | ||||||
MX 14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Polyacrylamide powder and other | 70.00 | 0.04 | ||||||
MX 588-2 | Multi-Chem Group | Scale Inhibitor | Other - unspecified | 70.00 | 0.02 | |||
Biocide - Plexcide 24L | Chemplex | Biocide | Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00744000 | ||
Other - unspecified | 72.00 | 0.02 | ||||||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00124000 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 9.36 | |||
Water | Water | 7732-18-5 | 100.00 | 89.62 | ||||
Plexbreak 145 | Chemplex | Acid Non-Emulsifier | ||||||
Other - Unspecified | 85.00 | 0.00042000 | ||||||
Methanol | 67-56-1 | 15.00 | 0.00007000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-06-24 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 534,571.00 | 150 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 821,519.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 477,327.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 325,936.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 291,688.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 239,046.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 200,434.44 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 179,009.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 172,853.00 | 356 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 5,392.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 102.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | PHILLIPS EXPLORATION INC | Fracing Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 92.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 3,025.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 588.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 122.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 145.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 145.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 145.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 1,299.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 1,011.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid | 122.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 552.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 157.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Produced Fluid | 463.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 463.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 182.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 334.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 245.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 462.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 283.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 25.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 285.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1960166 | Primary Facility | 2011-03-24 | Routine/Complete Inspection | No Violations Noted | |
1965708 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | |
1968403 | Primary Facility | 2011-04-26 | Routine/Complete Inspection | No Violations Noted | |
1984467 | Primary Facility | 2011-03-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.INSTALLING 20" CONDUCTOR PIPE TODAY. |
1984475 | Primary Facility | 2011-03-23 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS. E&S AND PITS LOOK IN GOOD CONDITION. PREPAIRING TO CEMENT SURFACE CASING TONGHT @ 354' |
1984487 | Primary Facility | 2011-03-25 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. PREPAIRING TO CEMENTING INTERMEDIATE CASING @ 2140' TODAY. MOVING TO STEVENS #2 -H TONIGHT. |
1984500 | Primary Facility | 2011-03-25 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. PHOENIX # 5 MOVING ON TODAY. START DRILLING ON SUN. (4/10/2011). |
1984506 | Primary Facility | 2011-04-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS ,E&S AND PITS IN GOOD CONDITION. PHOENIX # 5 DRILLING @ 5550' ( KOP). |
1984510 | Primary Facility | 2011-04-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.PHOENIX # 5 DRILLING @ 8508' (LANDING IN MARCELLUS). |
1984513 | Primary Facility | 2011-04-30 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.PHOENIX # 5 DRILLING @ 12,406'(TD).RUNNING 51/2" PROD. STRING TODAY AND CEMENTING TONIGHT. MOVING TO STEVENS 1 - H ON MON. (5/1/2011). |
1991489 | Primary Facility | 2011-07-28 | Routine/Complete Inspection | No Violations Noted | |
2110938 | Primary Facility | 2012-10-25 | Site Restoration | No Violations Noted | Restoration extension requested by operator until 7/30/12. Pits removed, two of three sed traps removed, silt fence still up, vegetative growth good, stie stable enough for extension approval. |
2451282 | Primary Facility | 2016-02-17 | Administrative/File Review | No Violations Noted | On or about January 21, 2016, the Department received an ESCGP-1 major revision submittal for ESX10-051-0045. During the review process it was discovered that ESX10-051-0045 had already expired. Given that the permit was not terminated before expiration, the site is currently in violation of 25 Pa. Code §102.7(a). At the time the violation was identified, the operator was attempting to make a major revision to the currently expired ESCGP-1. The operator should consider submitting an application for a NEW ESCGP-2. The operator will still be required to maintain the Erosion and Sedimentation Control Plan in accordance with ESX10-051-0045 until the approval of the new ESCGP-2 is conferred by the Department. |
2824928 | Primary Facility | 2019-01-10 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and single large fluid collection tank look ok. |
For data sources see[9]