37-051-24556

Well Details

Well ID: 37-051-24556
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 145441
Farm/Lease Name: SANFILIPPO UNIT 5H
License Status:
Spud Date:
Permit Date: 2013-02-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.981617
Longitude: -79.838839

For data sources see[1][2][3]

Well History

Date Event
2013-02-15 New Permit Application
2014-01-15 Performed Spud Operation
2015-02-12 New Permit Application
2015-03-31 Drilling Completion
2015-08-31 Perforation
2015-08-31 Performed Stimulation
2016-02-16 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-31 2015-09-13 8,457 5,199,430

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 89.8461 0
U042 Schlumberger Iron Chelating Agent Sodium hydroxide 1310-73-2 5 0.00013939 0
Trisodium nitrilotriacetate (im purity) 5064-31-3 10 0.00027878 0
Tetrasodium ethylenediam inetetraacetate 64-02-8 60 0.00167268 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00040403 0
A264 Schlumberger Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 10 0.00001252 0
Methanol 67-56-1 40 0.00005010 0
Aliphatic acids Proprietary 30 0.00003757 0
Aliphatic alcohols, ethoxylated #1 Proprietary 30 0.00003757 0
M300 BASF Corporation Biocide Glutaral 111-30-8 25 0.00056609 0
Water 7732-18-5 75 0.00169826 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 9.98784 0
J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00121001 0
J580 Schlumberger Gelling Agent Carbohydrate Polymer Proprietary 100 0.0261417 0
7.5% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 8 0.00896405 0
J609W Schlumberger Friction Reducer Urea 57-13-6 5 0.00094381 0
Ammonium Sulfate 7783-20-2 30 0.00566286 0
B317 Schlumberger Scale Inhibitor Ethane-1,2-diol 107-21-1 5 0.00010805 0
Trisodium ortho phosphate 7601-54-9 5 0.00010805 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-31 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 93,828.00 24 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 905,640.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 541,626.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 390,426.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 301,538.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drill Cuttings 74.61 Tons LANDFILL 100592
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 125.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste 43.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Drill Cuttings 752.08 Tons LANDFILL 100419
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,299.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 6.97 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,245.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 40.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Drill Cuttings 69.60 Tons LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 920.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Filter Socks 0.23 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 0.38 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Synthetic Liner Materials 1.89 Tons LANDFILL 100663
2016 CHEVRON APPALACHIA LLC Produced Fluid 2,536.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 369.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 CHEVRON APPALACHIA LLC Produced Fluid 7,846.42 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 352.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 10,776.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,115.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 205.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 89.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 37.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 4.69 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2017 CHEVRON APPALACHIA LLC Produced Fluid 316.40 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 563.80 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 41.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 977.20 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 157.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 47.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Produced Fluid 1,052.00 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 48.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2161256 Primary Facility 2013-04-16 Administrative/File Review No Violations Noted OG-71 review and approval.
2168569 Primary Facility 2013-05-21 Routine/Complete Inspection No Violations Noted Pre-op inspection, all perimeter E&S controls in and functioning. Site ID sign up. Plans and permits in tube.
2242888 Primary Facility 2014-01-30 Routine/Complete Inspection No Violations Noted On 1/30/2014, the Department conducted an inspection at the Chevron Appalachia’s Sanfilippo Well Unit site in Redstone Twp., Fayette County.
2248763 Primary Facility 2014-02-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 529' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY (2/22/2014).
2248776 Primary Facility 2014-02-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 793' (TD). RUNNING COAL PROTECTION CASING AND CEMENTING SUNDAY (2/23/2014).
2337392 Primary Facility 2015-01-16 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well was not equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2356035 Primary Facility 2015-03-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Rig moving on to Sanfilippo # 5 - H today.
2356045 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Rig moving on to Sanfilippo # 5 - H today.
2373510 Primary Facility 2015-03-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Neighbors Rig moving on to Sanfilippo # 5 - H today (3/23/2015).
2373522 Primary Facility 2015-03-31 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Neighbors Rig drilling on fluid @ 11,870" (TD ) . Running 51/2" Production Casing and cementing tonight (3/31/2015).
2435769 Primary Facility 2015-12-23 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Stimulation completed , in process of removing flow back equipment and cleaning up site.
2453372 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted On 12/24/15 the Department received a request for site restoration extension from Chevron Appalachia LLC for the Sanfilippo Pad A and Pad B.

On 01/04/16 at approximately 0700 hours I conducted a routine complete inspection of the site. The Act 9 sign was in place. All required documents were present at the site.

The site was not restored at the time of inspection. It appeared the pipeline connection had been recently installed to the Pad A. The site was stable.

The Department has reviewed the request for site restoration extension. The restoration date was to be 03/24/16, but a new date of 10/31/16 has been approved for both the Pad A and Pad B.

2494948 Primary Facility 2016-06-08 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Completing final restoration.
2564232 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was vegetated, but additional growth is needed to reach a uniform 70% growth. Small erosion rills were observed on the site (see photographs). The rills had been addressed by Chevron and straw bale BMPs were in place to prevent further erosion. One rill appeared to have previously had straw bale BMPs present, but they had since degraded. It is recommended this location be addressed.
2693633 Primary Facility 2018-02-05 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal by Chevron. The Act 9 sign was in place and all required documents were present at the site. The production equipment on both Pad A and pad B appeared to be in good condition. The site was well vegetated and there were no signs of erosion observed. The site meets and exceeds 70% uniform vegetative cover. The NOT is approved.

For data sources see[9]