X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-053-29594

Well Details

Well ID: 37-053-29594
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Hickory Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: CATALYST 5211 5
License Status:
Spud Date:
Permit Date: 2009-10-16
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.597588
Longitude: -79.304194

For data sources see[1][2][3]

Well History

Date Event
2009-10-16 New Permit Application
2010-04-19 Performed Spud Operation
2010-04-20 Drilling Completion
2010-05-04 Perforation
2010-09-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CATALYST ENERGY INC 2,612.00 210 154.29 210 0.00 0
2011 CATALYST ENERGY INC 2,913.00 365 44.29 365 0.00 0
2012 CATALYST ENERGY INC 2,156.00 366 38.88 366 35 366
2014 CATALYST ENERGY INC 1,834.20 365 23.25 365 95.64 365
2015 CATALYST ENERGY INC 1,938.00 304 0.00 0 131.64 304
2016 CATALYST ENERGY INC 1,784.14 335 22.23 335 140.8 335
2017 CATALYST ENERGY INC 588.03 365 0.00 0 40.83 365
2018 CATALYST ENERGY INC 1,111.71 365 0.00 0 60.19 365

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 91.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 CATALYST ENERGY INC Produced Fluid 21.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CATALYST ENERGY INC Produced Fluid 182.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 35.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 3.03 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 3.03 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 11.27 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 12.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 12.5 Bbl CENT WASTE TRT FAC NPDES PA0102784
2018 CATALYST ENERGY INC Produced Fluid 25.71 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 31.43 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1878823 Primary Facility 2010-04-21 Drilling/Alteration No Violations Noted
1904456 Primary Facility 2010-08-04 Routine/Complete Inspection No Violations Noted
2034368 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted
2567962 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Well is equipped to produce and is tagged. A site ID sign is also posted. Well pumps to a tank battery with spill containment, and there are no problems apparent with fluid handling. I also conducted an ESCGP-1 inspection.

For data sources see[7]

References