If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-053-30688 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.518283,"lon":-79.136319,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Forest | |
Municipality: Jenks Township | |
Operator Name: COASTAL PETRO CORP | |
Well Pad ID: | |
Farm/Lease Name: FRANCIS 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-24 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.518283 | |
Longitude: -79.136319 |
Date | Event |
---|---|
2014-06-24 | New Permit Application |
2014-07-21 | Performed Spud Operation |
2014-08-03 | Perforation |
2014-08-04 | Drilling Completion |
2015-01-05 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | D & M ENERGY LLC | 0.00 | 0 | 364.80 | 150 | 0.00 | 0 |
2015 | COASTAL PETRO CORP | 0.00 | 0 | 335.06 | 312 | 0.00 | 0 |
2016 | COASTAL PETRO CORP | 0.00 | 0 | 149.47 | 68 | 0.00 | 0 |
2017 | COASTAL PETRO CORP | 0.00 | 0 | 94.70 | 144 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | D & M ENERGY LLC | Produced Fluid | 269.2 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2014 | D & M ENERGY LLC | Produced Fluid | 269.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2014 | D & M ENERGY LLC | Produced Fluid | 285.80 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | D & M ENERGY LLC | Produced Fluid | 285.8 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | COASTAL PETRO CORP | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | COASTAL PETRO CORP | Produced Fluid | 60 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | COASTAL PETRO CORP | Produced Fluid | 20.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | COASTAL PETRO CORP | Produced Fluid | 20 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | COASTAL PETRO CORP | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2284922 | Primary Facility | 2014-07-08 | Routine/Complete Inspection | No Violations Noted | |
2287309 | Primary Facility | 2014-07-16 | Routine/Complete Inspection | No Violations Noted | |
2287497 | Primary Facility | 2014-07-15 | Drilling/Alteration | No Violations Noted | |
2288501 | Primary Facility | 2014-07-21 | Drilling/Alteration | No Violations Noted | |
2294665 | Primary Facility | 2014-08-12 | Routine/Complete Inspection | No Violations Noted | |
2305233 | Primary Facility | 2014-09-22 | Administrative/File Review | No Violations Noted | |
2305241 | Primary Facility | 2014-09-22 | Administrative/File Review | No Violations Noted | |
2772205 | Primary Facility | 2018-09-07 | Routine/Complete Inspection | No Violations Noted | Well is equipped to produce. Tubing is connected to tank on location. Surface casing is vented to atmosphere through a riser pipe extending approximately 8' high. Gas is actively venting the riser. H2S was detected in the venting gas at 6 ppm. |
For data sources see[7]