If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-053-30697 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.518775,"lon":-79.139697,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Forest | |
Municipality: Jenks Township | |
Operator Name: COASTAL PETRO CORP | |
Well Pad ID: | |
Farm/Lease Name: FRANCIS 10 | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-24 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.518775 | |
Longitude: -79.139697 |
Date | Event |
---|---|
2014-06-24 | New Permit Application |
2015-04-02 | Performed Spud Operation |
2015-06-02 | Perforation |
2015-06-04 | Drilling Completion |
2015-10-09 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | COASTAL PETRO CORP | 0.00 | 0 | 611.48 | 67 | 0.00 | 0 |
2016 | COASTAL PETRO CORP | 0.00 | 0 | 351.57 | 88 | 0.00 | 0 |
2017 | COASTAL PETRO CORP | 0.00 | 0 | 102.42 | 245 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | COASTAL PETRO CORP | Produced Fluid | 195.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2364205 | Primary Facility | 2015-04-22 | Routine/Complete Inspection | Violation(s) Noted | |
2381097 | Primary Facility | 2015-06-03 | Drilling/Alteration | No Violations Noted | |
2394357 | Primary Facility | 2015-07-28 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2401036 | Primary Facility | 2015-08-17 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2403884 | Primary Facility | 2015-09-02 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2405325 | Primary Facility | 2015-09-08 | Compliance Evaluation | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2364205 | 721026 | 04/22/2015 | 2015-04-22 | 102.4(b)5 - EROSION AND SEDIMENT CONTROL REQUIREMENTS – The E & S Plan, for earth disturbance activities not required to obtain a permit under 25 Pa. Code § 102.5(c), did not contain the required drawings and narrative. | Administrative | Plan not adequate |
2364205 | 721027 | 04/22/2015 | 2015-04-22 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | Failure to implement BMPs |
2364205 | 721028 | 04/22/2015 | 2015-04-22 | 102.11(a)1 - GENERAL REQUIREMENTS – BMP AND DESIGN STANDARDS - Person failed to design, implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation to protect, maintain, reclaim and restore water quality an | Environmental Health & Safety | Failure to implement BMPs |
2364205 | 721029 | 04/22/2015 | 2015-04-22 | 102.22(b)1 - SITE STABILIZATION – TEMPORARY STABILIZATION – Permitee failed to temporarily stabilize the site to protect it from accelerated erosion and sedimentation where cessation of earth disturbance activities exceeded 4 days. | Environmental Health & Safety | Failule to temporarily stabilize |
2364205 | 721030 | 04/22/2015 | 2015-04-22 | 78.53 - EROSION AND SEDIMENT CONTROL - Operator failed to design, implement and maintain best management practices and an erosion and sediment control plan in accordance with 25 Pa. Code Chapter 102, during and after earthmoving or soil disturbing ac | Environmental Health & Safety | Failure to implement BMPs |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
721026 | 329247 | NOV - Notice of Violation | Comply/Closed | 2015-09-08 | |||
721027 | 329247 | NOV - Notice of Violation | Comply/Closed | 2015-09-08 | |||
721028 | 329247 | NOV - Notice of Violation | Comply/Closed | 2015-09-08 | |||
721029 | 329247 | NOV - Notice of Violation | Comply/Closed | 2015-09-08 | |||
721030 | 329247 | NOV - Notice of Violation | Comply/Closed | 2015-09-08 |
For data sources see[7]