If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-053-30722 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.613639,"lon":-79.104083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Forest | |
Municipality: Howe Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: COOPER TRACT | |
License Status: Active | |
Spud Date: 2015-06-23 | |
Permit Date: 2014-07-28 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.613639 | |
Longitude: -79.104083 |
Date | Event |
---|---|
2014-07-28 | New Permit Application |
2015-06-23 | Performed Spud Operation |
2015-06-29 | Drilling Completion |
2019-05-17 | Perforation |
2019-05-22 | Performed Stage 1 of Stimulation |
2019-05-22 | Performed Stage 10 of Stimulation |
2019-05-22 | Performed Stage 11 of Stimulation |
2019-05-22 | Performed Stage 12 of Stimulation |
2019-05-22 | Performed Stage 13 of Stimulation |
2019-05-22 | Performed Stage 14 of Stimulation |
2019-05-22 | Performed Stage 2 of Stimulation |
2019-05-22 | Performed Stage 3 of Stimulation |
2019-05-22 | Performed Stage 4 of Stimulation |
2019-05-22 | Performed Stage 5 of Stimulation |
2019-05-22 | Performed Stage 6 of Stimulation |
2019-05-22 | Performed Stage 7 of Stimulation |
2019-05-22 | Performed Stage 8 of Stimulation |
2019-05-22 | Performed Stage 9 of Stimulation |
2019-05-23 | Performed Stage 15 of Stimulation |
2019-05-23 | Performed Stage 16 of Stimulation |
2019-05-23 | Performed Stage 17 of Stimulation |
2019-05-23 | Performed Stage 18 of Stimulation |
2019-05-23 | Performed Stage 19 of Stimulation |
2019-05-23 | Performed Stage 20 of Stimulation |
2019-05-23 | Performed Stage 21 of Stimulation |
2019-05-23 | Performed Stage 22 of Stimulation |
2019-05-23 | Performed Stage 23 of Stimulation |
2019-05-23 | Performed Stage 24 of Stimulation |
2019-05-23 | Performed Stage 25 of Stimulation |
2019-05-23 | Performed Stage 26 of Stimulation |
2019-05-23 | Performed Stage 27 of Stimulation |
2019-05-23 | Performed Stage 28 of Stimulation |
2019-09-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2019-05-22 | 1 | Ottawa | 65,477 | 1,400 | 1,900 |
2019-05-22 | 2 | Ottawa | 65,477 | 1,400 | 1,900 |
2019-05-22 | 3 | Ottawa | 65,477 | 1,700 | 2,200 |
2019-05-22 | 4 | Ottawa | 65,477 | 1,900 | 2,600 |
2019-05-22 | 5 | Ottawa | 65,477 | 2,300 | 2,400 |
2019-05-22 | 6 | Ottawa | 65,477 | 2,300 | 3,900 |
2019-05-22 | 7 | Ottawa | 65,477 | 2,700 | 4,200 |
2019-05-22 | 8 | Ottawa | 65,477 | 2,800 | 3,800 |
2019-05-22 | 9 | Ottawa | 65,477 | 2,600 | 3,600 |
2019-05-22 | 10 | Ottawa | 65,477 | 2,300 | 4,000 |
2019-05-22 | 11 | Ottawa | 65,477 | 4,000 | 4,200 |
2019-05-22 | 12 | Ottawa | 65,477 | 2,300 | 4,100 |
2019-05-22 | 13 | Ottawa | 65,477 | 2,000 | 3,500 |
2019-05-22 | 14 | Ottawa | 65,477 | 2,100 | 2,200 |
2019-05-23 | 15 | Ottawa | 65,477 | 12,800 | 2,400 |
2019-05-23 | 16 | Ottawa | 65,477 | 1,900 | 3,400 |
2019-05-23 | 17 | Ottawa | 65,477 | 2,400 | 3,200 |
2019-05-23 | 18 | Ottawa | 65,477 | 2,500 | 4,000 |
2019-05-23 | 19 | Ottawa | 65,477 | 2,600 | 4,000 |
2019-05-23 | 20 | Ottawa | 65,477 | 2,700 | 4,200 |
2019-05-23 | 21 | Ottawa | 65,477 | 2,600 | 2,800 |
2019-05-23 | 22 | Ottawa | 65,477 | 2,400 | 4,000 |
2019-05-23 | 23 | Ottawa | 65,477 | 2,500 | 3,100 |
2019-05-23 | 24 | Ottawa | 65,477 | 2,700 | 3,500 |
2019-05-23 | 25 | Ottawa | 65,477 | 2,700 | 4,000 |
2019-05-23 | 26 | Ottawa | 65,477 | 2,600 | 4,300 |
2019-05-23 | 27 | Ottawa | 65,477 | 2,700 | 4,000 |
2019-05-23 | 28 | Ottawa | 65,477 | 2,800 | 3,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 2.53 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Produced Fluid | 11.27 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2381107 | Primary Facility | 2015-06-23 | Drilling/Alteration | No Violations Noted | |
2390525 | Primary Facility | 2015-07-20 | Administrative/File Review | No Violations Noted | |
2522226 | Primary Facility | 2016-09-14 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]