X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-01153

Well Details

Well ID: 37-059-01153
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Perry Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: SPENCER STEPHENS 2906
License Status: Plugged and Abandoned
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 39.7537
Longitude: -80.105011

For data sources see[1][2][3]

Well History

Date Event
1925-11-04 Drilling Completion
1926-01-01 Old Well
1929-12-16 Drilling Completion
1930-01-01 Drilled Deeper
1930-03-29 Drilling Completion
1930-12-30 Drilled Deeper
2016-06-02 Begin Plugging
2016-06-03 Finished Plugging
2019-03-08 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1992 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1993 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1995 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1996 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1997 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1998 EQUITRANS INC 0.00 0 0.00 0 0.00 0
1999 EQUITRANS LP 0.00 0 0.00 0 0.00 0
2000 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2001 EQUITABLE PROD EASTERN STATES EXPLORATION INC 0.00 0 0.00 0 0.00 0
2003 EQT PROD CO 0.00 0 0.00 0 0.00 0
2005 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2010 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2011 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2012 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2013 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2014 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2015 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2495432 Primary Facility 2016-06-21 Plugging(Includes Plugged/Mined Through) No Violations Noted After drilling out to 3200' over a period of 2- week’s attainable bottom is reach. Cementing 1000' plug of cement.
2495433 Primary Facility 2016-06-02 Plugging(Includes Plugged/Mined Through) No Violations Noted Moving on to location to start plugging well.

For data sources see[6]

References